####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number Expedition expedition number (Int. 1 - 99999), required key field <>0 # 2 SITE Numeric site identifier, max. number between 1 and 9999 Site site identifier (num 4), required key field <>0 # 3 HOLE text hole identifier, A-Z Hole hole identifier (max. 1 chars, A-Z), required key field LIKE ('[A-Z]') # 4 CORE Numeric core identifier Core please enter a number between 1 and 99999 between 1 and 99999 # 5 CORE_TYPE Text type of core, piston, gravity.... Core Type core type(max. 1 char), required field <>'' # 6 TOP_DEPTH Double top depth of core Top Depth top depth (float), required field >=0.0 m 7 DRILLED_LENGTH Double drilled length of the current core run Drilled Length (m) real value >=0.0 >=0.0 m 8 BOTTOM_DEPTH Double bottom depth of core Bottom Depth bottom depth (float), required field >=0.0 m 9 MCD_OFFSET Double offset of composite depth for core MCD Offset # # # 12 CORE_RECOVERY Double length of recovered core Core Recovery (m) real value >=0.0 # m 13 CORE_RECOVERY_PC Double percentage of core recovery Core Recovery (%) real value >=0.0 >=0.0 % 14 CORE_ONDECK Date date and time core comes on deck On Deck core on deck, (date UTC), required field <>0 # 15 ORIENTED Text is core oriented ? true or false Core Oriented ? oriented yes or no ? IN ( 'yes','no') or is Null # 16 LAST_SECTION Integer number of last section of core Section Count section count, required, between 0 and 99 BETWEEN 0 and 99 # 17 CORE_CATCHER Text core has catcher section ? CC core catcher (yes or no ), required field IN ( 'yes','no') # 18 ANALYST Text initials of data operator / Curator Curator, (fmax. 5 chars), required field <>'' # 19 REMARKS Text additional remarks, free text Remarks # # # 20 IGSN Text IGSN IGSN text string of max. 15 characters # # ####################### Data Part ############################# EXPEDITION SITE HOLE CORE CORE_TYPE TOP_DEPTH DRILLED_LENGTH BOTTOM_DEPTH MCD_OFFSET MCD_TOP MCD_BOTTOM CORE_RECOVERY CORE_RECOVERY_PC CORE_ONDECK ORIENTED LAST_SECTION CORE_CATCHER ANALYST REMARKS IGSN 5061 1 A 1 H 0.230 3 3.230 0 0.230 3.230 2.970 99 07-Nov-2016 17:51 no 3 yes RG Finished anchor capstan fabrication at 3:30PM. Completed anchoring and rig setup by 5:30PM. Dropped tool 5:37PM. Tool fired 5:39PM. Gas expansion. ICDP5061ECKB001 5061 1 A 2 H 0.230 3 3.230 0 0.230 3.230 2.995 99.833 07-Nov-2016 20:22 no 3 yes RG Nightshift taking over. Full extension. Mud above CC only. 3m recovery in liner. NOTE ADDED 11/13/2016. IT SEEMS CLEAR FROM THE MS DATA AND THE ROD COUNT THAT DURING THE SHIFT CHANGE BETWEEN DRIVES 1 AND 2 A ROD WAS NOT ADDED AND THAT DRIVE 2 IS ACTUALLY A SURFACE DRIVE, NOT A DRIVE FROM 3.23 TO 6.23. THUS DEPTHS ARE NOW ADJUSTED SO THAT DRIVE 2 IS .23-323 MBLF. ICDP5061ECLB001 5061 1 A 3 H 3.230 3 6.230 0 3.230 6.230 3.222 107.400 07-Nov-2016 21:50 no 4 yes RG Full stroke - 3.08 in liner - ca. 8 cm extruded from liner put in cc. With expansion cut into 3 sections - v gassy. Diatom and organic matter laminations visible in cc. ICDP5061ECMB001 5061 1 A 4 H 6.230 3 9.230 0 6.230 9.230 3.275 109.167 07-Nov-2016 23:04 no 4 yes RG full stroke - extrusion into cc. gassy. ICDP5061ECNB001 5061 1 A 5 H 9.230 3 12.230 0 9.230 12.230 3.186 106.200 08-Nov-2016 00:19 no 4 yes RG full stroke - ca. 310 cm in liner ca. 2cm extruded into cc. ICDP5061ECOB001 5061 1 A 6 H 12.230 3 15.230 0 12.230 15.230 3.229 107.633 08-Nov-2016 01:28 no 4 yes RG Full stroke - seems solid green w/out laminations. Switch to 8 baskets ICDP5061ECPB001 5061 1 A 7 H 15.230 3 18.230 0 15.230 18.230 3.285 109.500 08-Nov-2016 02:40 no 4 yes RG full stroke ICDP5061ECQB001 5061 1 A 8 H 18.230 3 21.230 0 18.230 21.230 3.240 108 08-Nov-2016 03:54 no 4 yes RG Full stroke. 310cm in liner. Gassy. ICDP5061ECRB001 5061 1 A 9 H 21.230 3 24.230 0 21.230 24.230 3.223 107.433 08-Nov-2016 05:05 no 4 yes RG full stroke - 313 in liner - v. gassy ICDP5061ECSB001 5061 1 A 10 H 24.230 3 27.230 0 24.230 27.230 3.240 108 08-Nov-2016 06:12 no 4 yes RG FULL STROKE - 315 IN LINER, GASSY ICDP5061ECTB001 5061 1 A 11 H 27.230 3 30.230 0 27.230 30.230 3.265 108.833 08-Nov-2016 08:04 no 4 yes RG Day Shift Begins. Drillers notes and drill rods indicate that this shot should be starting on Rod 38 not rod 39. It is clear on the driller log that drive 2 was originally entered as rod 1m up on rod 30, which is correct, but it was changed at some point to be 1m up on 29 (which is where drive 1 started). I think the depth is corre ct and this is a labeling error on the rods and in the DES notes. Nonetheless we should count rods when we trip out to make sure the count is correct. Full Stroke, Gassy- holes drilled. ICDP5061ECUB001 5061 1 A 12 H 30.230 3 33.230 0 30.230 33.230 3.240 108 08-Nov-2016 08:49 no 4 yes RG full stroke. Alternating Brown and Green Laminated Lake Sediments. Gassy-several holes drilled. ICDP5061ECVB001 5061 1 A 13 H 33.230 3 36.230 0 33.230 36.230 3.140 104.667 08-Nov-2016 09:40 no 3 yes RG Driller indicates that tool took longer to pressure back up which may indicate stiffer sediment in this run. Full Stroke. Sharp transitions-less smear apparent. ICDP5061ECWB001 5061 1 A 14 H 36.230 3 39.230 0 36.230 39.230 3.190 106.333 08-Nov-2016 10:24 no 3 yes RG Gassy. Core catcher heavily disturbed on extraction. Brown and Green laminated muds-getting drier and a little stiffer. ICDP5061ECXB001 5061 1 A 15 H 39.230 3 42.230 0 39.230 42.230 3.085 102.833 08-Nov-2016 11:03 no 3 yes RG Alternating Green and brown muds. Laminated. Gassy several holes drilled. ICDP5061ECYB001 5061 1 A 16 H 42.230 3 45.230 0 42.230 45.230 3.155 105.167 08-Nov-2016 11:43 no 4 yes RG Full stroke. gasssy with holes drilled. ICDP5061ECZB001 5061 1 A 17 H 45.230 3 48.230 0 45.230 48.230 3.170 105.667 08-Nov-2016 12:28 no 3 yes RG Gassy, holes drilled. ICDP5061EC0C001 5061 1 A 18 H 48.230 3 51.230 0 48.230 51.230 3.200 106.667 08-Nov-2016 13:20 no 3 yes RG Full Stroke. gassy, holes drilled. ICDP5061EC1C001 5061 1 A 19 H 51.230 3 54.230 0 51.230 54.230 3.170 105.667 08-Nov-2016 15:15 no 3 yes RG Some time in between cores. Stopped to refuel the rig and fuel tanks on the barge. Fuel looks very dirty with oil and large particles of debris. helpers added directly to the tank on the rig so using only rig filters to clean it. Drillers are running the rig, there are concerns that the fuel will cause a problem in fuel line, but drillers are running on this fuel anyway. Also moved a few lights around for night shift. New delivery of liners 20 liners brought. ICDP5061EC2C001 5061 1 A 20 H 54.230 3 57.230 0 54.230 57.230 3.190 106.333 08-Nov-2016 16:07 no 3 yes RG Full Stroke. gassy, holes drilled. Maarten noticed that the bottom of section 2 looks like there is some deformation in the laminations-potentially drilling artifact. ICDP5061EC3C001 5061 1 A 21 H 57.230 3 60.230 0 57.230 60.230 3.200 106.667 08-Nov-2016 17:08 no 4 yes RG ICDP5061EC4C001 5061 1 A 22 H 60.230 3 63.230 0 60.230 63.230 3.029 100.967 08-Nov-2016 20:01 no 4 yes RG Rod count on the rack at this time is 60 pipes. Everyone is fairly confident that the original count was 109 and so there should only be 59 rods on the rack. We suspect that the night shift did not add rod 30 to start drive 2 but instead re shot rod 29, which would mean that we have the surface twice. We should count the rods on the way out to confirm. MSCL magnetic data also suggest that drives 1 and 2 are duplicates, comparing drive 1A-1H-2 to drive 1A-1H-1 and 1Z-1H-1. Suspect that all depths from Drive 2 on are actually 3m shallower than indicated. full stroke - partial liner collapse sec 1 - made a splitn. ICDP5061EC5C001 5061 1 A 23 H 63.230 3 66.230 0 63.230 66.230 3.240 108 08-Nov-2016 22:01 no 4 yes RG full stroke - sticky pulling HPC out. ICDP5061EC6C001 5061 1 A 24 H 66.230 3 69.230 0 66.230 69.230 3.200 106.667 08-Nov-2016 23:01 no 4 yes RG Full stroke - ca. 310cm in liner - pretty gassy. Pulled out HPC more easily. ICDP5061EC7C001 5061 1 A 25 H 69.230 3 72.230 0 69.230 72.230 3.104 103.467 09-Nov-2016 00:07 no 3 yes RG Full stroke - 303 cm in liner. ICDP5061EC8C001 5061 1 A 26 H 72.230 3 75.230 0 72.230 75.230 3.280 109.333 09-Nov-2016 01:29 no 4 yes RG full stroke - 308cm in liner - ca 4 cm from liner into cc. ICDP5061EC9C001 5061 1 A 27 H 75.230 3 78.230 0 75.230 78.230 3.260 108.667 09-Nov-2016 02:26 no 4 yes RG 309 in liner - full stroke ICDP5061ECAC001 5061 1 A 28 H 78.230 3 81.230 0 78.230 81.230 3.190 106.333 09-Nov-2016 03:47 no 3 yes RG Full stroke - 304cm in liner ICDP5061ECBC001 5061 1 A 29 H 81.230 3 84.230 0 81.230 84.230 3.200 106.667 09-Nov-2016 05:10 no 3 yes RG 300 cm in liner, full stroke ICDP5061ECCC001 5061 1 A 30 H 84.230 3 87.230 0 84.230 87.230 3.140 104.667 09-Nov-2016 06:07 no 4 yes RG ICDP5061ECDC001 5061 1 A 31 H 87.230 3 90.230 0 87.230 90.230 3.095 103.167 09-Nov-2016 10:49 no 4 yes RG Shift Change: Day shift starts. Beau, Steve, Paul, Geoserve. Science team Titus, Maarten, Lien, Ryan. Joined by Chris and Els during lunch time. Brown muds, fairly dry. Sharp change from green mud in previous run. It may be that this is the transition to low stand that is is interpreted in the seismic profile at 90m depth. Safety boat (larger white boat) came loose during the nigth and was on the shore north of the barge. Driller shift change delayed because the grey Zodiac capsized during the night (Low freeboard on transom casued boat to flood, broke the line holding it to shore. The innertube with the leaking valve deflated allowing the boat to overturn. Drillers unable to change shifts until ~8am. Beau and Dirk meet on Barge to discuss driller report questions. Dirk is adamant that the disel into gas engine problem not the projects fault as gas cans labeled “Disel” were sent up the hill and filled with Disel. Drillers insist that the driver who was handed the gas cans was told verbally that these two cans were specifically for gasoline or petrol and that the same driver brought those cans back down and told them it was petrol. There will be some dispute over charges for time related to issue. ICDP5061ECEC001 5061 1 A 32 H 90.230 3 93.230 0 90.230 93.230 3.065 102.167 09-Nov-2016 12:07 no 3 yes RG Inverted the #8 core catcher. ~20cm of core came out of the liner between liner and core catcher. It was in inner tube and carefully extracted and put in scrap liner along with the core catcher. The bottom 20cm of the liner (section 2) was plunged to consolidate and close gaps and cut off. Recovery still ~3m . We assume that there was some loss (less than 10cm) from the bottom of the core as it should be expanded to more than 3m. This was likely collected and lost while tool tripping so it does not benefit to ream less than 3m as missing sediment will be disturbed. Sediment is darker green and transitions to lighter brown similar run 31 in section 2 ICDP5061ECFC001 5061 1 A 33 H 93.230 2.370 95.600 0 93.230 95.600 2.365 99.789 09-Nov-2016 13:14 no 4 yes RG Switching to #10 core catcher due to inverted 8 on last hole. Recovered 2.37 and advancing by recovery as this may have stopped on the unconformity or turbidite anticipated near 100m. Core catcher was not inverted so we assume that the tool did not deploy the full stroke. Mechanic seems to have repaired the grey boat after being submerged. It arrived at the barge to return fuel cans. ICDP5061ECGC001 5061 1 A 34 H 95.600 3 98.600 0 95.600 98.600 3.060 102 09-Nov-2016 14:35 no 4 yes RG Full Stroke. Green muds with some laminated diatom layers. 4 sections. ICDP5061ECHC001 5061 1 A 35 H 98.600 3 101.600 0 98.600 101.600 3.120 104 09-Nov-2016 15:43 no 4 yes RG Shot fired at 3:24PM. Alternating green and white coloration. ICDP5061ECIC001 5061 1 A 36 H 101.600 3 104.600 0 101.600 104.600 3.165 105.500 09-Nov-2016 16:49 no 3 yes RG Gassy green sediment with possible turbidite in section 2 ICDP5061ECJC001 5061 1 A 37 H 104.600 3 107.600 0 104.600 107.600 3.190 106.333 09-Nov-2016 18:03 no 4 yes RG ICDP5061ECKC001 5061 1 A 38 H 107.600 2.630 110.230 0 107.600 110.230 3.085 117.300 09-Nov-2016 20:03 no 4 yes RG no full extension - liner collapse at upper end and ca 30-40 cm short. calling shot at 2.63 m will ABR and take next shot with 2 m stickup. ICDP5061ECLC001 5061 1 A 39 H 110.230 2.400 112.630 0 110.230 112.630 2.955 123.125 09-Nov-2016 21:48 no 4 yes RG appeared to advanc3 2.4 - will advance by recovery. Upper portion collapsed again - could not locate spacers so will limp down to 120 with collapsing liner. ICDP5061ECMC001 5061 1 A 40 H 112.630 3 115.630 0 112.630 115.630 3.025 100.833 10-Nov-2016 00:18 no 3 yes RG prob advanced 2.6m based on pullback. Tube stuck. Pulled some rods and got it out. Tube is fulled and not collapsed so assuming full extension - possibly some missing. ICDP5061ECNC001 5061 1 A 41 H 115.630 2.050 117.680 0 115.630 117.680 2.350 114.634 10-Nov-2016 02:01 no 4 yes RG Not complete stroke - 194cm in liner - liner collapsed above that. Excluding collapsed liner, recovery is about 2.05 putting us just below 120m. ICDP5061ECOC001