####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number # # 2 SITE Numeric "site number, integer" # # 3 HOLE Text "code for hole, one character (A_Z)" # # 4 REPORT_DATE Date date of report report date is a required value # 5 REPORT_NUMBER Integer number of report for selected date report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report activity number is a required value # 7 TIME_FROM Text time from required text string of max. 25 characters hh:mm 8 TIME_TO Text time to required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours real value >=0 h 10 STARTING_DEPTH Double starting depth of activity real value m 11 ENDING_DEPTH Double ending depth of activity real value m 12 CORE_NUMBER integer core run number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity real value >=0 m 14 CORE_RECOVERY double core recovery during activity real value >=0 m 15 CORE_RECOVERY_PC double core recovery during activity in percentage real value % 16 ROCK_TYPE Text rock type text string of max. 50 characters # 17 REMARKS Text remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours real value >=0 h ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5061 1 A 07-Nov-2016 1 1 07:15 07:45 0.5 travel to barge 0.5 5061 1 A 07-Nov-2016 1 2 07:45 15:30 7.75 work on cathead mounts 8.25 5061 1 A 07-Nov-2016 1 3 15:30 17:15 1.75 tighten anchor lines 10 5061 1 A 07-Nov-2016 1 4 17:15 17:30 0.25 trip in hole 29 rods + BHA (4.51m) 10.25 5061 1 A 07-Nov-2016 1 5 17:30 18:00 0.5 90.51 93.51 1 3 2.97 99 clay "coring HPC, 1m up, rod 29" 10.75 5061 1 A 07-Nov-2016 2 1 18:30 19:00 0.5 93.51 93.51 0 site inspection and safety meeting 0.5 5061 1 A 07-Nov-2016 2 2 19:00 20:00 1 93.51 93.51 0 clay ream 3m to 93.51 1.5 5061 1 A 07-Nov-2016 2 3 20:00 20:45 0.75 93.51 96.51 2 3 3.03 101 clay "coring HPC, 1m up, rod 29" 2.25 5061 1 A 07-Nov-2016 2 4 20:45 21:30 0.75 96.51 96.51 0 clay ream from 93.51 to 96.51 3 5061 1 A 07-Nov-2016 2 5 21:30 22:00 0.5 96.51 99.51 3 3 3.17 105.67 clay "coring HPC, 1m up, rod 30" 3.5 5061 1 A 07-Nov-2016 2 6 22:00 22:30 0.5 99.51 99.51 0 clay ream from 96.51 to 99.51 4 5061 1 A 07-Nov-2016 2 7 22:30 23:00 0.5 99.51 102.51 4 3 3 100 clay "coring HPC, 1m up, rod 31" 4.5 5061 1 A 07-Nov-2016 2 8 23:00 23:45 0.75 102.51 102.51 0 clay ream from 99.51 to 102.51 5.25 5061 1 A 07-Nov-2016 2 9 23:45 00:30 0.75 102.51 105.51 5 3 3 100 clay "coring HPC, 1m up, rod 32" 6 5061 1 A 07-Nov-2016 2 10 00:30 01:00 0.5 105.51 105.51 0 clay ream from 102.51 to 105.51 6.5 5061 1 A 07-Nov-2016 2 11 01:00 01:45 0.75 105.51 108.51 6 3 3 100 clay "coring HPC, 1m up, rod 33" 7.25 5061 1 A 07-Nov-2016 2 12 01:45 02:15 0.5 108.51 108.51 0 clay ream from 105.51 to 108.51 7.75 5061 1 A 07-Nov-2016 2 13 02:15 03:00 0.75 108.51 111.51 7 3 3 100 clay "coring HPC, 1m up, rod 34" 8.5 5061 1 A 07-Nov-2016 2 14 03:00 03:30 0.5 111.51 111.51 0 clay ream from 108.51 to 111.51 9 5061 1 A 07-Nov-2016 2 15 03:30 04:15 0.75 111.51 114.51 8 3 3 100 clay "coring HPC, 1m up, rod 35" 9.75 5061 1 A 07-Nov-2016 2 16 04:15 04:45 0.5 114.51 114.51 0 clay ream from 111.51 to 114.51 10.25 5061 1 A 07-Nov-2016 2 17 04:45 05:15 0.5 114.51 117.51 9 3 3 100 clay "coring HPC, 1m up, rod 36" 10.75 5061 1 A 07-Nov-2016 2 18 05:15 05:45 0.5 117.51 117.51 0 clay ream from 114.51 to 117.51 11.25 5061 1 A 07-Nov-2016 2 19 05:45 06:15 0.5 117.51 120.51 10 3 3 100 clay "coring HPC, 1m up, rod 37" 11.75 5061 1 A 08-Nov-2016 1 1 06:30 07:00 0.5 120.51 120.51 0 site inspection and safety meeting 0.5 5061 1 A 08-Nov-2016 1 2 07:00 07:30 0.5 120.51 120.51 0 ream 3m to 120.51 0.5 5061 1 A 08-Nov-2016 1 3 07:30 08:10 0.67 120.51 123.51 11 3 3 100 clay "coring, HPC, 1m up, rod 39" 1.67 5061 1 A 08-Nov-2016 1 4 08:10 09:00 0.83 123.51 126.51 12 3 3 100 clay "coring, HPC, 1m up, rod 40" 2.5 5061 1 A 08-Nov-2016 1 5 09:00 09:50 0.83 126.51 129.51 13 3 3 100 clay "coring, HPC, 1m up, rod 41" 3.33 5061 1 A 08-Nov-2016 1 6 09:50 10:40 0.83 129.51 132.51 14 3 3 100 clay "coring, HPC, 1m up, rod 42" 4.16 5061 1 A 08-Nov-2016 1 7 10:40 11:30 0.83 132.51 135.51 15 3 3 100 clay "coring, HPC, 1m up, rod 43" 4.99 5061 1 A 08-Nov-2016 1 8 11:30 12:20 0.83 135.51 138.51 16 3 3 100 clay "coring, HPC, 1m up, rod 44" 5.82 5061 1 A 08-Nov-2016 1 9 12:20 13:00 0.67 138.51 141.51 17 3 3 100 clay "coring, HPC, 1m up, rod 45" 6.49 5061 1 A 08-Nov-2016 1 10 13:00 13:45 0.75 141.51 144.51 18 3 3 100 clay "coring, HPC, 1m up, rod 46" 7.24 5061 1 A 08-Nov-2016 1 11 13:45 14:30 0.75 144.51 144.51 0 fuel transfer from shore 7.99 5061 1 A 08-Nov-2016 1 12 14:30 15:30 1 144.51 147.51 19 3 3 100 clay "coring, HPC, 1m up, rod 47" 8.99 5061 1 A 08-Nov-2016 1 13 15:30 16:15 0.75 147.51 150.51 20 3 3 100 clay "coring, HPC, 1m up, rod 48" 9.74 5061 1 A 08-Nov-2016 1 14 16:15 17:15 1 150.51 153.51 21 3 3 100 clay "coring, HPC, 1m up, rod 49" 10.74 5061 1 A 08-Nov-2016 2 1 18:30 19:00 0.5 153.51 153.51 0 site inspection and safety meeting 0.5 5061 1 A 08-Nov-2016 2 2 19:00 20:00 1 153.51 153.51 0 work on lights and generator 1.5 5061 1 A 08-Nov-2016 2 3 20:00 20:30 0.5 153.51 156.51 22 3 3 100 clay "coring, HPC, 1m up, rod 50" 2 5061 1 A 08-Nov-2016 2 4 20:30 21:15 0.75 156.51 156.51 0 clay ream from 153.51 to 156.51 2.75 5061 1 A 08-Nov-2016 2 5 21:15 21:45 0.5 156.51 159.51 23 3 3 100 clay "coring, HPC, 1m up, rod 51" 3.25 5061 1 A 08-Nov-2016 2 6 21:45 22:30 0.75 159.51 159.51 0 clay ream from 156.51 to 159.51 4 5061 1 A 08-Nov-2016 2 7 22:30 23:00 0.5 159.51 162.51 24 3 3 100 clay "coring, HPC, 1m up, rod 52" 4.5 5061 1 A 08-Nov-2016 2 8 23:00 23:45 0.75 162.51 162.51 0 clay ream from 159.51 to 162.51 5.25 5061 1 A 08-Nov-2016 2 9 23:45 00:15 0.5 162.51 165.51 25 3 3 100 clay "coring, HPC, 1m up, rod 53" 5.75 5061 1 A 08-Nov-2016 2 10 00:15 00:45 0.5 165.51 165.51 0 clay ream from 162.51 to 165.51 6.25 5061 1 A 08-Nov-2016 2 11 00:45 01:20 0.58 165.51 168.51 26 3 3 100 clay "coring, HPC, 1m up, rod 54" 6.83 5061 1 A 08-Nov-2016 2 12 01:20 02:00 0.67 168.51 168.51 0 clay ream from 165.51 to 168.51 7.5 5061 1 A 08-Nov-2016 2 13 02:00 02:30 0.5 168.51 171.51 27 3 3 100 clay "coring, HPC, 1m up, rod 55" 8 5061 1 A 08-Nov-2016 2 14 02:30 03:00 0.5 171.51 171.51 0 clay ream from 168.51 to 171.51 8.5 5061 1 A 08-Nov-2016 2 15 03:00 03:40 0.67 171.51 174.51 28 3 3 100 clay "coring, HPC, 1m up, rod 56" 9.17 5061 1 A 08-Nov-2016 2 16 03:40 04:30 0.83 174.51 174.51 0 clay ream from 171.51 to 174.51 10 5061 1 A 08-Nov-2016 2 17 04:30 05:15 0.75 174.51 177.51 29 3 3 100 clay "coring, HPC, 1m up, rod 57" 10.75 5061 1 A 08-Nov-2016 2 18 05:15 05:40 0.42 177.51 177.51 0 clay ream from 174.51 to 177.51 11.17 5061 1 A 08-Nov-2016 2 19 05:40 06:15 0.58 177.51 180.51 30 3 3 100 clay "coring, HPC, 1m up, rod 58" 11.75 5061 1 A 09-Nov-2016 1 1 06:30 08:00 1.5 "crew boat issues, pre-shift inspection" 1.5 5061 1 A 09-Nov-2016 1 2 08:00 09:00 1 ream 3m and flush hole 2.5 5061 1 A 09-Nov-2016 1 3 09:00 10:00 1 "water swivel locked up and wrapped up hose, change out water swivel" 3.5 5061 1 A 09-Nov-2016 1 4 10:00 11:00 1 180.51 183.51 31 3 3 100 clay "coring, HPC #8, 1m up, rod 59" 4.5 5061 1 A 09-Nov-2016 1 5 11:00 12:20 1.33 183.51 186.51 32 3 3 100 clay "coring, HPC #8, 1m up, rod 60" 5.83 5061 1 A 09-Nov-2016 1 6 12:20 13:20 1 186.51 188.88 33 2.37 2.37 100 clay "coring, HPC #10, 1m up, rod 61" 6.83 5061 1 A 09-Nov-2016 1 7 13:20 14:40 1.33 188.88 191.88 34 3 3 100 clay "coring, HPC #10, 1.63m up, rod 62" 8.16 5061 1 A 09-Nov-2016 1 8 14:40 15:45 1.08 191.88 194.88 35 3 3 100 clay "coring, HPC #10, 1.63m up, rod 63" 9.24 5061 1 A 09-Nov-2016 1 9 15:45 16:50 1.08 194.88 197.88 36 3 3 100 clay "coring, HPC #10, 1.63m up, rod 64" 10.32 5061 1 A 09-Nov-2016 1 10 16:50 17:50 1 197.88 200.88 37 3 3 100 clay "coring, HPC #10, 1.63m up, rod 65" 11.32 5061 1 A 09-Nov-2016 1 11 17:50 18:30 0.67 200.88 200.88 0 clay "fuel up rig and genset, break 6m rods into 3m" 11.99 5061 1 A 09-Nov-2016 2 1 18:30 19:00 0.5 pre-shift inspection 0.5 5061 1 A 09-Nov-2016 2 2 19:00 19:30 0.5 reamm from 197.88 to 200.88 1 5061 1 A 09-Nov-2016 2 3 19:30 20:30 1 200.88 203.51 38 2.63 2.63 100 clay "coring, HPC #10, 1m up, rod 66, lower stick" 2 5061 1 A 09-Nov-2016 2 4 20:30 21:00 0.5 203.51 203.51 0 clay ream from 200.88 to 203.51 2.5 5061 1 A 09-Nov-2016 2 5 21:00 22:00 1 203.51 205.91 39 2.4 2.4 100 clay "coring, HPC, 2m up, rod 67" 3.5 5061 1 A 09-Nov-2016 2 6 22:00 22:45 0.75 205.91 205.91 0 clay ream from 203.51 and 205.91 4.25 5061 1 A 09-Nov-2016 2 7 22:45 00:20 1.58 205.91 208.91 40 3 3 100 clay "coring, HPC, 2.6m up, rod 68, stuck tube" 5.83 5061 1 A 09-Nov-2016 2 8 00:20 01:00 0.67 208.91 208.91 0 clay ream from 205.91 to 208.91 6.5 5061 1 A 09-Nov-2016 2 9 01:00 02:30 1.5 208.91 210.96 41 2.05 2.05 100 clay "coring, HPC, 2m up, rod 69, TD" 8 5061 1 A 09-Nov-2016 2 10 02:30 04:30 2 210.96 210.96 0 "trip out, pull all 109 rods" 10 5061 1 A 09-Nov-2016 2 11 04:30 05:15 0.75 move barge 10.75 5061 1 A 09-Nov-2016 2 12 05:15 06:00 0.75 trip in hole to 82.51m (26 rods) 11.5