####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number Expedition expedition number (Int. 1 - 99999), required key field <>0 # 2 SITE Numeric site identifier, max. number between 1 and 9999 Site site identifier (num 4), required key field <>0 # 3 HOLE text hole identifier, A-Z Hole hole identifier (max. 1 chars, A-Z), required key field LIKE ('[A-Z]') # 4 CORE Numeric core identifier Core please enter a number between 1 and 99999 between 1 and 99999 # 5 CORE_TYPE Text type of core, piston, gravity.... Core Type core type(max. 1 char), required field <>'' # 6 TOP_DEPTH Double top depth of core Top Depth top depth (float), required field >=0.0 m 7 DRILLED_LENGTH Double drilled length of the current core run Drilled Length (m) real value >=0.0 >=0.0 m 8 BOTTOM_DEPTH Double bottom depth of core Bottom Depth bottom depth (float), required field >=0.0 m 9 MCD_OFFSET Double offset of composite depth for core MCD Offset # # # 12 CORE_RECOVERY Double length of recovered core Core Recovery (m) real value >=0.0 # m 13 CORE_RECOVERY_PC Double percentage of core recovery Core Recovery (%) real value >=0.0 >=0.0 % 14 CORE_ONDECK Date date and time core comes on deck On Deck core on deck, (date UTC), required field <>0 # 15 ORIENTED Text is core oriented ? true or false Core Oriented ? oriented yes or no ? IN ( 'yes','no') or is Null # 16 LAST_SECTION Integer number of last section of core Section Count section count, required, between 0 and 99 BETWEEN 0 and 99 # 17 CORE_CATCHER Text core has catcher section ? CC core catcher (yes or no ), required field IN ( 'yes','no') # 18 ANALYST Text initials of data operator / Curator Curator, (fmax. 5 chars), required field <>'' # 19 REMARKS Text additional remarks, free text Remarks # # # 20 IGSN Text IGSN IGSN text string of max. 15 characters # # ####################### Data Part ############################# EXPEDITION SITE HOLE CORE CORE_TYPE TOP_DEPTH DRILLED_LENGTH BOTTOM_DEPTH MCD_OFFSET MCD_TOP MCD_BOTTOM CORE_RECOVERY CORE_RECOVERY_PC CORE_ONDECK ORIENTED LAST_SECTION CORE_CATCHER ANALYST REMARKS IGSN 5061 1 B 1 H 1.230 3 4.230 0 1.230 4.230 3.105 103.500 10-Nov-2016 07:42 no 3 yes RG Taking first shot 1.23 into mud to offset from Hole 1A. We have already cored upper several meters several times so no need to recore. Night shift moved over and tripped in 26 rods. Day shift arrives and is confirming coordinate. May have disturbed some material at the section break (top of 2 bottom of 1). Gassy holes drilled. ICDP5061ECPC001 5061 1 B 2 H 4.230 3 7.230 0 4.230 7.230 3.200 106.667 10-Nov-2016 08:36 no 3 yes RG ICDP5061ECQC001 5061 1 B 3 H 7.230 3 10.230 0 7.230 10.230 3.220 107.333 10-Nov-2016 09:20 no 3 yes RG ICDP5061ECRC001 5061 1 B 4 H 10.230 3 13.230 0 10.230 13.230 3.120 104 10-Nov-2016 10:09 no 3 yes RG ICDP5061ECSC001 5061 1 B 5 H 13.230 3 16.230 0 13.230 16.230 3.145 104.833 10-Nov-2016 10:57 no 3 yes RG Switching to #8 baskets. Paul welds some cracks in the overshot. Dark green with no color changes-may not be any laminations. ICDP5061ECTC001 5061 1 B 6 H 16.230 3 19.230 0 16.230 19.230 3.200 106.667 10-Nov-2016 11:59 no 3 yes RG ICDP5061ECUC001 5061 1 B 7 H 19.230 3 22.230 0 19.230 22.230 3.120 104 10-Nov-2016 13:00 no 3 yes RG Tool dropped 12:30pm. ICDP5061ECVC001 5061 1 B 8 H 22.230 3 25.230 0 22.230 25.230 3.160 105.333 10-Nov-2016 14:18 no 3 yes RG Lunch arrives and more liners requested. ICDP5061ECWC001 5061 1 B 9 H 25.230 3 28.230 0 25.230 28.230 3.185 106.167 10-Nov-2016 15:12 no 4 yes RG Gassy. drilled several holes. ICDP5061ECXC001 5061 1 B 10 H 28.230 3 31.230 0 28.230 31.230 3.200 106.667 10-Nov-2016 16:12 no 4 yes RG Gassy. ICDP5061ECYC001 5061 1 B 11 H 31.230 3 34.230 0 31.230 34.230 3.120 104 10-Nov-2016 17:08 no 3 yes RG ICDP5061ECZC001 5061 1 B 12 H 34.230 3 37.230 0 34.230 37.230 3.180 106 10-Nov-2016 19:16 no 4 yes RG Change to night/elite shift. Ful stroke. On top of section 1, a 1cm thick sample was taken because it was coming out of the section. The sample is full of fish bones and was conserved aside for better preservation. ICDP5061EC0D001 5061 1 B 13 H 37.230 3 40.230 0 37.230 40.230 3.188 106.267 10-Nov-2016 20:11 no 4 yes RG full recovery - lots of gas ICDP5061EC1D001 5061 1 B 14 H 40.230 3 43.230 0 40.230 43.230 3.030 101 10-Nov-2016 21:11 no 4 yes RG Full stroke ICDP5061EC2D001 5061 1 B 15 H 43.230 3 46.230 0 43.230 46.230 3.130 104.333 10-Nov-2016 22:20 no 3 yes RG full core ICDP5061EC3D001 5061 1 B 16 H 46.230 3 49.230 0 46.230 49.230 3.160 105.333 10-Nov-2016 23:31 no 4 yes RG ICDP5061EC4D001 5061 1 B 17 H 49.230 3 52.230 0 49.230 52.230 3.160 105.333 11-Nov-2016 00:48 no 4 yes RG ICDP5061EC5D001 5061 1 B 18 H 52.230 3 55.230 0 52.230 55.230 3.165 105.500 11-Nov-2016 01:55 no 4 yes RG ICDP5061EC6D001 5061 1 B 19 H 55.230 3 58.230 0 55.230 58.230 3.165 105.500 11-Nov-2016 03:03 no 4 yes RG ICDP5061EC7D001 5061 1 B 20 H 58.230 3 61.230 0 58.230 61.230 3.100 103.333 11-Nov-2016 04:11 no 4 yes RG ICDP5061EC8D001 5061 1 B 21 H 61.230 3 64.230 0 61.230 64.230 3.235 107.833 11-Nov-2016 05:18 no 4 yes RG ICDP5061EC9D001 5061 1 B 22 H 64.230 3 67.230 0 64.230 67.230 3.110 103.667 11-Nov-2016 06:21 no 3 yes RG ICDP5061ECAD001 5061 1 B 23 H 67.230 3 70.230 0 67.230 70.230 3.185 106.167 11-Nov-2016 08:53 no 4 yes RG Shift change: Days. Steve Paul geoserve; Maarten, Lien, Rebecca, Ryan. Full Stroke. Drillers transfer boat ran out of fuel when Curt was going to pick up day shift. drillers. There was 1 20L can of petrol on the barge. Drillers were paddling the transfer boat back to the barge, Ryan took the 20L can of fuel to them and dropped off the night shift geoserve drillers at the lodge. Steve indicates that fueling boats is not their responsibility because Dirk is providing fuel and told them that he hired boatmen to fuel them. Ryan and Steve spoke yesterday about having the Geoserve driver get enough fuel to fill the boat (~90L) which we thought would last the rest of the project. Everyone seemed in agreement about this yesterday, but the obviously didnt have time to get fuel between last night and again this morning. When Ryan asked Steve about this again, Steve said that the drive to get fuel on the Tanzanian side was too far and that we should just get it from the Kenyan side. Since their boat is ICDP5061ECBD001 5061 1 B 24 H 70.230 3 73.230 0 70.230 73.230 3.155 105.167 11-Nov-2016 10:00 no 3 yes RG Wind blowing some. GPS reads 4m off site. Some waves forming. ICDP5061ECCD001 5061 1 B 25 H 73.230 3 76.230 0 73.230 76.230 3.090 103 11-Nov-2016 11:02 no 3 yes RG Tool drops at 10:29AM. latches at 10:42AM. fires at 10:45AM. Reaming begins ~11:10AM ICDP5061ECDD001 5061 1 B 26 H 76.230 3 79.230 0 76.230 79.230 3.130 104.333 11-Nov-2016 12:13 no 3 yes RG Plant macrofossils in core catcher. Large woody debris sticking out of shoe, bagged separately as a subsample from the core catcher. Dark black plant macros(?) in the top of the core catcher. ICDP5061ECED001 5061 1 B 27 H 79.230 3 82.230 0 79.230 82.230 3.075 102.500 11-Nov-2016 13:31 no 3 yes RG 292 in liner but 14 in cc. Some core between liner and cc in inner tube added into cc. Full recovery. ICDP5061ECFD001 5061 1 B 28 H 82.230 3 85.230 0 82.230 85.230 3.115 103.833 11-Nov-2016 14:35 no 3 yes RG ICDP5061ECGD001 5061 1 B 29 H 85.230 3 88.230 0 85.230 88.230 3.255 108.500 11-Nov-2016 15:40 no 4 yes RG Feels stickier-more clay-like. ICDP5061ECHD001 5061 1 B 30 H 88.230 3 91.230 0 88.230 91.230 3.110 103.667 11-Nov-2016 16:51 no 3 yes RG last core of day shift. Stopping to fuel rig. Paul is doing something with drilling instrument panel. ICDP5061ECID001 5061 1 B 31 H 91.230 3 94.230 0 91.230 94.230 2.864 95.467 11-Nov-2016 19:30 no 3 yes RG ICDP5061ECJD001 5061 1 B 32 H 94.230 3 97.230 0 94.230 97.230 3.070 102.333 11-Nov-2016 20:37 no 3 yes RG ICDP5061ECKD001 5061 1 B 33 H 97.230 3 100.230 0 97.230 100.230 3.200 106.667 11-Nov-2016 21:52 no 3 yes RG ICDP5061ECLD001 5061 1 B 34 H 100.230 3 103.230 0 100.230 103.230 3.110 103.667 11-Nov-2016 23:24 no 3 yes RG ICDP5061ECMD001 5061 1 B 35 H 103.230 3 106.230 0 103.230 106.230 3.100 103.333 12-Nov-2016 00:46 no 3 yes RG ICDP5061ECND001 5061 1 B 36 H 106.230 3 109.230 0 106.230 109.230 2.980 99.333 12-Nov-2016 01:56 no 3 yes RG gassy but no expansion ICDP5061ECOD001 5061 1 B 37 H 109.230 2.780 112.010 0 109.230 112.010 3.010 108.273 12-Nov-2016 03:11 no 4 yes RG liner collapse - calling hole and logging. Shift change. Loggers change to Day shift and Ryan on barge. Marten and Simona are logging today. Jokem and Marco logged in the rods last night. We are pulling 10x6m stands (20 rods) to start the open hole logging at 52.01 mblf. Day shift for logging having some issues with power supply to the winch. They call Jokem and Marco to return to the barge ~3:30PM. In the meantime, Phillipe intended to come to the barge at 12:30PM then go to the Challa hotel to meet with Dirk about costs. Dirk decided to come to the barge to meet Phillipe around 1:15PM and then ride back to the hotel with him. Phillipe arrives at the barge closer to 2:30 PM. Around 2PM the drillers top up the hydraulic oil and realize, after pouring the bucket labeled “hydraulic oil,” in to the reservoir that the bucket actually contained Disel, not hydraulic oil. Driller inidcates that the bucket came from the smaller floating dock shore and was brought out by John at the drillers request. Unclear how it became filled with Disel, but Dirk is insistent that this couldnt have been done by project staff-as they don’t use the white “hydraulic oil” containers for anything, let alone fuel disposal. Fortunately the Rig was not run with the disel in it, so it is just a matter of draining the oil and refilling. We checked to see if the Disel and oil separate, but they appear to mix. Now we are down until we can source 300L of hyrdaulic oil. Since today is a saturday, it is likely that oil will not arrive until Monday at the earliest. The loggers finished logging the open bore hole,from 112 to ~52mblf and are now waiting until the rig is running to pull out the remaining rods to log the upper ~50m of open hole. Hydraulic oil arrives on site 2:40 PM 11/13/2016. Loggers Marten and Simona are on site standing by. Pulling back 6x6m stands (12 rods) to have rods at 13.23 in the hole for open hole logging. Start tripping rods at 3PM. Loggers having issues with the caliper communications ~5:00. Drillers will trip out 9 x20’ stands of casing then adding a rod with windows cut in it so that the cuttings will be vented from the casing at the lake floor rather than lifting them all the way to the water surface. Then they will move over and lower all 37 pieces of casing welding each joint. We can then ream to ICDP5061ECPD001