####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number # # 2 SITE Numeric "site number, integer" # # 3 HOLE Text "code for hole, one character (A_Z)" # # 4 REPORT_DATE Date date of report report date is a required value # 5 REPORT_NUMBER Integer number of report for selected date report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report activity number is a required value # 7 TIME_FROM Text time from required text string of max. 25 characters hh:mm 8 TIME_TO Text time to required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours real value >=0 h 10 STARTING_DEPTH Double starting depth of activity real value m 11 ENDING_DEPTH Double ending depth of activity real value m 12 CORE_NUMBER integer core run number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity real value >=0 m 14 CORE_RECOVERY double core recovery during activity real value >=0 m 15 CORE_RECOVERY_PC double core recovery during activity in percentage real value % 16 ROCK_TYPE Text rock type text string of max. 50 characters # 17 REMARKS Text remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours real value >=0 h ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5061 1 B 10-Nov-2016 1 1 06:30 07:00 0.5 "site inspection, safety meeting, 26 rods in" 0.5 5061 1 B 10-Nov-2016 1 2 07:00 07:15 0.25 trip in 9m 0.75 5061 1 B 10-Nov-2016 1 3 07:15 08:15 1 91.51 94.51 1 3 3 100 clay "coring, HPC #5, 0m up, rod 29" 1.75 5061 1 B 10-Nov-2016 1 4 08:15 09:00 0.75 94.51 97.51 2 3 3 100 clay "coring, HPC #5, 0m up, rod 30" 2.5 5061 1 B 10-Nov-2016 1 5 09:00 09:40 0.67 97.51 100.51 3 3 3 100 clay "coring, HPC #5, 0m up, rod 31" 3.17 5061 1 B 10-Nov-2016 1 6 09:40 10:30 0.83 100.51 103.51 4 3 3 100 clay "coring, HPC #5, 0m up, rod 32" 4 5061 1 B 10-Nov-2016 1 7 10:30 11:35 1.08 103.51 106.51 5 3 3 100 clay "coring, HPC #8, 0m up, rod 33" 5.08 5061 1 B 10-Nov-2016 1 8 11:35 12:30 0.92 106.51 109.51 6 3 3 100 clay "coring, HPC #8, 0m up, rod 34" 6 5061 1 B 10-Nov-2016 1 9 12:30 13:30 1 109.51 112.51 7 3 3 100 clay "coring, HPC #8, 0m up, rod 35" 7 5061 1 B 10-Nov-2016 1 10 13:30 14:40 1.17 112.51 115.51 8 3 3 100 clay "coring, HPC #8, 0m up, rod 36" 8.17 5061 1 B 10-Nov-2016 1 11 14:40 15:45 1.08 115.51 118.51 9 3 3 100 clay "coring, HPC #8, 0m up, rod 37" 9.25 5061 1 B 10-Nov-2016 1 12 15:45 16:40 0.92 118.51 121.51 10 3 3 100 clay "coring, HPC #8, 0m up, rod 38" 10.17 5061 1 B 10-Nov-2016 1 13 16:40 17:45 1.08 121.51 124.51 11 3 3 100 clay "coring, HPC #8, 0m up, rod 39" 11.25 5061 1 B 10-Nov-2016 1 14 17:45 18:30 0.75 124.51 124.51 0 "fuel rig and genset, break 6m rods into 3m" 12 5061 1 B 10-Nov-2016 2 1 18:30 19:00 0.5 124.51 124.51 0 pre-shift inspection 0.5 5061 1 B 10-Nov-2016 2 2 19:00 19:45 0.75 124.51 127.51 12 3 3 100 clay "coring, HPC #8, 0m up, rod 40" 1.25 5061 1 B 10-Nov-2016 2 3 19:45 20:40 0.92 127.51 130.51 13 3 3 100 clay "coring, HPC #8, 0m up, rod 41" 2.17 5061 1 B 10-Nov-2016 2 4 20:40 21:45 1.08 130.51 133.51 14 3 3 100 clay "coring, HPC #8, 0m up, rod 42" 3.25 5061 1 B 10-Nov-2016 2 5 21:45 23:00 1.25 133.51 136.51 15 3 3 100 clay "coring, HPC #8, 0m up, rod 43" 4.5 5061 1 B 10-Nov-2016 2 6 23:00 00:15 1.25 136.51 139.51 16 3 3 100 clay "coring, HPC #8, 0m up, rod 44" 5.75 5061 1 B 10-Nov-2016 2 7 00:15 01:20 1.08 139.51 142.51 17 3 3 100 clay "coring, HPC #8, 0m up, rod 45" 6.83 5061 1 B 10-Nov-2016 2 8 01:20 02:30 1.17 142.51 145.51 18 3 3 100 clay "coring, HPC #8, 0m up, rod 46" 8 5061 1 B 10-Nov-2016 2 9 02:30 03:40 1.17 145.51 148.51 19 3 3 100 clay "coring, HPC #8, 0m up, rod 47" 9.17 5061 1 B 10-Nov-2016 2 10 03:40 04:40 1 148.51 151.51 20 3 3 100 clay "coring, HPC #8, 0m up, rod 48" 10.17 5061 1 B 10-Nov-2016 2 11 04:40 05:45 1.08 151.51 154.51 21 3 3 100 clay "coring, HPC #8, 0m up, rod 49" 11.25 5061 1 B 10-Nov-2016 2 12 05:45 06:15 0.5 154.51 157.51 22 3 3 100 clay "coring, HPC #8, 0m up, rod 50" 11.75 5061 1 B 11-Nov-2016 1 1 06:30 08:00 1.5 crew boat ran out of gas. Paddel to barge 1.5 5061 1 B 11-Nov-2016 1 2 08:00 08:30 0.5 "pre-shift inspection, safety meeting" 2 5061 1 B 11-Nov-2016 1 3 08:30 09:25 0.92 157.51 160.51 23 3 3 100 clay "coring, HPC #8, 0m up, rod 51" 2.92 5061 1 B 11-Nov-2016 1 4 09:25 10:30 1.08 160.51 163.51 24 3 3 100 clay "coring, HPC #8, 0m up, rod 52" 4 5061 1 B 11-Nov-2016 1 5 10:30 11:35 1.08 163.51 166.51 25 3 3 100 clay "coring, HPC #8, 0m up, rod 53" 5.08 5061 1 B 11-Nov-2016 1 6 11:35 12:50 1.25 166.51 169.51 26 3 3 100 clay "coring, HPC #8, 0m up, rod 54" 6.33 5061 1 B 11-Nov-2016 1 7 12:50 14:00 1.17 169.51 172.51 27 3 3 100 clay "coring, HPC #8, 0m up, rod 55" 7.5 5061 1 B 11-Nov-2016 1 8 14:00 15:10 1.17 172.51 175.51 28 3 3 100 clay "coring, HPC #8, 0m up, rod 56" 8.67 5061 1 B 11-Nov-2016 1 9 15:10 16:20 1.17 175.51 178.51 29 3 3 100 clay "coring, HPC #8, 0m up, rod 57" 9.84 5061 1 B 11-Nov-2016 1 10 16:20 17:30 1.17 178.51 181.51 30 3 3 100 clay "coring, HPC #8, 0m up, rod 58" 11.01 5061 1 B 11-Nov-2016 1 11 17:30 18:00 0.5 181.51 181.51 0 fuel transfer from shore 11.51 5061 1 B 11-Nov-2016 1 12 18:00 18:30 0.5 181.51 181.51 0 "fix hyd leak in drill console, lower HPC for run 31. NOTE: steady strong winds throughout entire day, barge movement 1-6m off hole center" 12.01 5061 1 B 11-Nov-2016 2 1 18:30 19:00 0.5 181.51 181.51 0 pre-shift inspection 0.5 5061 1 B 11-Nov-2016 2 2 19:00 19:30 0.5 181.51 184.51 31 3 3 100 clay "coring, HPC #10, 0m up, rod 59" 1 5061 1 B 11-Nov-2016 2 3 19:30 20:00 0.5 184.51 187.51 32 3 3 100 clay "coring, HPC #10, 0m up, rod 60" 1.5 5061 1 B 11-Nov-2016 2 4 20:00 22:30 2.5 187.51 190.51 33 3 3 100 clay "coring, HPC #10, 0m up, rod 61" 4 5061 1 B 11-Nov-2016 2 5 22:30 23:30 1 190.51 193.51 34 3 3 100 clay "coring, HPC #10, 0m up, rod 62" 5 5061 1 B 11-Nov-2016 2 6 23:30 00:45 1.25 193.51 196.51 35 3 3 100 clay "coring, HPC #10, 0m up, rod 63" 6.25 5061 1 B 11-Nov-2016 2 7 00:45 02:15 1.5 196.51 199.51 36 3 3 100 clay "coring, HPC #10, 0m up, rod 64" 7.75 5061 1 B 11-Nov-2016 2 8 02:15 04:00 1.75 199.51 202.29 37 2.78 2.78 100 clay "coring, HPC #10, 0m up, rod 65, T.D." 9.5 5061 1 B 11-Nov-2016 2 9 04:00 04:30 0.5 202.29 202.29 0 wash on hole while loggers rig up 10 5061 1 B 11-Nov-2016 2 10 04:30 06:30 2 202.29 202.29 0 run gamma log thru rods 12 5061 1 B 12-Nov-2016 1 1 06:30 07:00 0.5 202.29 202.29 0 "site inspection, safety meeting" 0.5 5061 1 B 12-Nov-2016 1 2 07:00 08:00 1 202.29 202.29 0 trip out 65m to run open hole logs 1.5 5061 1 B 12-Nov-2016 1 3 08:00 11:15 3.25 202.29 202.29 0 gamma log 4.75 5061 1 B 12-Nov-2016 1 4 11:15 11:30 0.25 202.29 202.29 0 DLL log (not working) 5 5061 1 B 12-Nov-2016 1 5 11:30 15:50 4.33 202.29 202.29 0 repair power to winch 9.33 5061 1 B 12-Nov-2016 1 6 15:50 16:30 0.67 202.29 202.29 0 Sonic log 10 5061 1 B 12-Nov-2016 1 7 16:30 17:15 0.75 202.29 202.29 0 DLL log 10.75 5061 1 B 12-Nov-2016 1 8 17:15 18:00 0.75 202.29 202.29 0 during logging GeoServe was doing routine maintenance on the rig. Hyd oil was low so they added 1.5 gal bucket of hyd oil that they provided and was stored on the small platform on shore. 11.5 5061 1 B 12-Nov-2016 1 9 18:00 18:30 0.5 202.29 202.29 0 after adding to hyd tank they noticed there was dirt in the bottom of the bucket. At that time realized that it was not hyd oil that it was Diesel. Drain tank and stand by till we can source hyd oil. 12 5061 1 B 12-Nov-2016 2 1 18:30 06:30 12 202.29 202.29 0 "pre-shift inspection, safety meeting, stand by for hyd oil (12hrs)" 12 5061 1 B 13-Nov-2016 1 1 06:30 07:00 0.5 202.29 202.29 0 "site inspection, safety meeting" 0.5 5061 1 B 13-Nov-2016 1 2 07:00 14:30 7.5 202.29 202.29 0 stand by for hyd oil 8 5061 1 B 13-Nov-2016 1 3 14:30 15:00 0.5 202.29 202.29 0 fill rig with 300l hyd oil 8.5 5061 1 B 13-Nov-2016 1 4 15:00 15:30 0.5 202.29 202.29 0 trip out 36m 9 5061 1 B 13-Nov-2016 1 5 15:30 16:45 1.25 202.29 202.29 0 gamma and MS log 10.25 5061 1 B 13-Nov-2016 1 6 16:45 18:30 1.75 202.29 202.29 0 "sonic log, cut out windows in casing for cxxxxxx" 12 5061 1 B 13-Nov-2016 2 1 18:30 19:00 0.5 202.29 202.29 0 pre-shift inspection 0.5 5061 1 B 13-Nov-2016 2 2 19:00 20:00 1 202.29 202.29 0 trip out rods and C.B. 1.5 5061 1 B 13-Nov-2016 2 3 20:00 22:00 2 202.29 202.29 0 pull casing back 9 stands 3.5 5061 1 B 13-Nov-2016 2 4 22:00 22:30 0.5 202.29 202.29 0 cut windows in casing 4