####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number # # 2 SITE Numeric "site number, integer" # # 3 HOLE Text "code for hole, one character (A_Z)" # # 4 REPORT_DATE Date date of report report date is a required value # 5 REPORT_NUMBER Integer number of report for selected date report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report activity number is a required value # 7 TIME_FROM Text time from required text string of max. 25 characters hh:mm 8 TIME_TO Text time to required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours real value >=0 h 10 STARTING_DEPTH Double starting depth of activity real value m 11 ENDING_DEPTH Double ending depth of activity real value m 12 CORE_NUMBER integer core run number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity real value >=0 m 14 CORE_RECOVERY double core recovery during activity real value >=0 m 15 CORE_RECOVERY_PC double core recovery during activity in percentage real value % 16 ROCK_TYPE Text rock type text string of max. 50 characters # 17 REMARKS Text remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours real value >=0 h ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5061 1 D 15-Nov-2016 1 1 09:00 18:00 9 "transfer over 11 3m casing from shore, tighten up anchor lines over new hole, trip in casing and weld tabs on joints, put together BHA, transfer 45 PQ rods from shore, total of 109 on barge. Total of 28 3m pieces of casing welded and hanging." 9 5061 1 D 15-Nov-2016 1 2 18:00 18:30 0.5 Waiting for wind to die down to put in ground and take GPS coordinates. 9.5 5061 1 D 15-Nov-2016 2 1 18:30 19:00 0.5 "pre-shift inspection, crew change" 0.5 5061 1 D 15-Nov-2016 2 2 19:00 19:30 0.5 land casing 1 5061 1 D 15-Nov-2016 2 3 19:30 20:00 0.5 weld BHA and move rods 1.5 5061 1 D 15-Nov-2016 2 4 20:00 21:30 1.5 trip 28 rods in hole 3 5061 1 D 15-Nov-2016 2 5 21:30 06:30 9 ream from 88.51m to 190m 12 5061 1 D 16-Nov-2016 1 1 06:30 07:00 0.5 "site inspection, safety meeting" 0.5 5061 1 D 16-Nov-2016 1 2 07:00 08:30 1.5 ream with NCA rod 57 to 72 2 5061 1 D 16-Nov-2016 1 3 08:30 09:00 0.5 217.51 220.51 1 3 3 100 clay "coring, EXN #10, 3m up, rod 72" 2.5 5061 1 D 16-Nov-2016 1 4 09:00 09:25 0.42 220.51 223.51 2 3 2 66.67 clay "coring, EXN #10, 3m up, rod 73" 2.92 5061 1 D 16-Nov-2016 1 5 09:25 10:00 0.58 223.51 226.51 3 3 1.52 50.67 "clay,sand" "coring, EXN #10, 3m up, rod 74" 3.5 5061 1 D 16-Nov-2016 1 6 10:00 11:50 1.83 226.51 226.51 0 "overshot will not latch, trip out to CB, 0.5m sand on top of latch head" 5.33 5061 1 D 16-Nov-2016 1 7 11:50 13:55 2.08 226.51 226.51 0 wash out CB and trip back in tp bottom 7.41 5061 1 D 16-Nov-2016 1 8 13:55 14:20 0.42 226.51 229.51 4 3 3 100 clay "coring, EXN #10, 3m up, rod 75" 7.83 5061 1 D 16-Nov-2016 1 9 14:20 14:50 0.5 229.51 232.51 5 3 1.57 52.33 "clay,sand" "coring, EXN #10, 3m up, rod 76" 8.33 5061 1 D 16-Nov-2016 1 10 14:50 15:10 0.33 232.51 235.51 6 3 3 100 clay "coring, EXN #10, 3m up, rod 77" 8.66 5061 1 D 16-Nov-2016 1 11 15:10 15:40 0.5 235.51 238.51 7 3 3 100 clay "coring, EXN #10, 3m up, rod 78" 9.16 5061 1 D 16-Nov-2016 1 12 15:40 16:00 0.33 238.51 241.51 8 3 1.95 65 clay "coring, EXN #10, 3m up, rod 79" 9.49 5061 1 D 16-Nov-2016 1 13 16:00 16:40 0.67 241.51 244.51 9 3 0.92 30.67 clay "coring, EXN #10, 3m up, rod 80" 10.16 5061 1 D 16-Nov-2016 1 14 16:40 17:00 0.33 244.51 244.51 0 "weather delay, high winds and rain" 10.49 5061 1 D 16-Nov-2016 1 15 17:00 17:35 0.58 244.51 247.51 10 3 1.34 44.67 clay "coring, EXN #10, 3m up, rod 81" 11.07 5061 1 D 16-Nov-2016 1 16 17:35 18:30 0.92 247.51 250.51 11 3 1.9 63.33 clay "coring, EXN #10, 3m up, rod 82" 11.99 5061 1 D 16-Nov-2016 2 1 18:30 19:00 0.5 250.51 250.51 0 "pre-shift inspection, crew change" 0.5 5061 1 D 16-Nov-2016 2 2 19:00 19:30 0.5 250.51 250.51 0 "caving sand, rods sticky, condition hole" 1 5061 1 D 16-Nov-2016 2 3 19:30 20:00 0.5 250.51 253.51 12 3 2.9 96.67 clay "coring, EXN #10, 3m up, rod 84" 1.5 5061 1 D 16-Nov-2016 2 4 20:00 20:30 0.5 253.51 253.51 0 weather delay 2 5061 1 D 16-Nov-2016 2 5 20:30 21:00 0.5 253.51 256.51 13 3 3 100 clay "coring, EXN #10, 3m up, rod 85" 2.5 5061 1 D 16-Nov-2016 2 6 21:00 21:30 0.5 256.51 259.51 14 3 3.12 104 clay "coring, EXN #10, 3m up, rod 86" 3 5061 1 D 16-Nov-2016 2 7 21:30 22:00 0.5 259.51 262.51 15 3 3.2 106.67 clay "coring, EXN #10, 3m up, rod 87" 3.5 5061 1 D 16-Nov-2016 2 8 22:00 22:30 0.5 262.51 265.51 16 3 3 100 clay "coring, EXN #10, 3m up, rod 88" 4 5061 1 D 16-Nov-2016 2 9 22:30 23:00 0.5 265.51 268.51 17 3 0.61 20.33 sand "coring, EXN #10, 3m up, rod 89" 4.5 5061 1 D 16-Nov-2016 2 10 23:00 23:30 0.5 268.51 271.51 18 3 1.51 50.33 clay "coring, EXN #10, 3m up, rod 89" 5 5061 1 D 16-Nov-2016 2 11 23:30 00:00 0.5 271.51 274.51 19 3 3 100 clay "coring, EXN #10, 3m up, rod 90" 5.5 5061 1 D 16-Nov-2016 2 12 00:00 00:30 0.5 274.51 274.51 0 condition hole 6 5061 1 D 16-Nov-2016 2 13 00:30 01:15 0.75 274.51 274.51 0 trip back to 217.51 6.75 5061 1 D 16-Nov-2016 2 14 01:15 03:30 2.25 274.51 274.51 0 log hole 9 5061 1 D 16-Nov-2016 2 15 03:30 04:30 1 274.51 274.51 0 wash and ream to bottom 10 5061 1 D 16-Nov-2016 2 16 04:30 05:00 0.5 274.51 274.51 0 condition hole 10.5 5061 1 D 16-Nov-2016 2 17 05:00 05:30 0.5 274.51 274.51 0 trip back to 253.51 11 5061 1 D 16-Nov-2016 2 18 05:30 06:30 1 274.51 274.51 0 log hole 12 5061 1 D 17-Nov-2016 1 1 06:30 07:00 0.5 274.51 274.51 0 "site inspection, safety meeting" 0.5 5061 1 D 17-Nov-2016 1 2 07:00 08:45 1.75 274.51 274.51 0 continue with log 2.25 5061 1 D 17-Nov-2016 1 3 08:45 10:00 1.25 274.51 274.51 0 trip back 44 rods to 121.51 3.5 5061 1 D 17-Nov-2016 1 4 10:00 11:30 1.5 274.51 274.51 0 MS log 5 5061 1 D 17-Nov-2016 1 5 11:30 12:45 1.25 274.51 274.51 0 Sonic log 6.25 5061 1 D 17-Nov-2016 1 6 12:45 13:40 0.92 274.51 274.51 0 trip out 39 rods and CB 7.17 5061 1 D 17-Nov-2016 1 7 13:40 14:00 0.33 274.51 274.51 0 trip out 2 6m stands of casing and pull up 6m on cable 7.5 5061 1 D 17-Nov-2016 1 8 14:00 18:30 4.5 274.51 274.51 0 stopped pulling casing noticed that the lower truss under casing hanger has been cruched on both sides. There concerns of going further. Took pictures and send them off to DES officials. 12 5061 1 D 17-Nov-2016 2 1 18:30 22:30 4 274.51 274.51 0 "form plan to strengthen barge, get casing from lay down yard, run casing inside barge trusses" 4 5061 1 D 17-Nov-2016 2 2 22:30 23:00 0.5 274.51 274.51 0 pull 40 feet of casing 4.5 5061 1 D 17-Nov-2016 2 3 23:00 23:30 0.5 274.51 274.51 0 move rig (barge) 5