####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number # # 2 SITE Numeric "site number, integer" # # 3 HOLE Text "code for hole, one character (A_Z)" # # 4 REPORT_DATE Date date of report report date is a required value # 5 REPORT_NUMBER Integer number of report for selected date report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report activity number is a required value # 7 TIME_FROM Text time from required text string of max. 25 characters hh:mm 8 TIME_TO Text time to required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours real value >=0 h 10 STARTING_DEPTH Double starting depth of activity real value m 11 ENDING_DEPTH Double ending depth of activity real value m 12 CORE_NUMBER integer core run number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity real value >=0 m 14 CORE_RECOVERY double core recovery during activity real value >=0 m 15 CORE_RECOVERY_PC double core recovery during activity in percentage real value % 16 ROCK_TYPE Text rock type text string of max. 50 characters # 17 REMARKS Text remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours real value >=0 h ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5061 1 E 17-Nov-2016 1 1 23:30 00:00 0.5 run casing back in hole 0.5 5061 1 E 17-Nov-2016 1 2 00:00 01:00 1 trip in to 87m 1.5 5061 1 E 17-Nov-2016 1 3 01:00 02:45 1.75 ream 87m to 204.01m with NCA 3.25 5061 1 E 17-Nov-2016 1 4 02:45 03:45 1 condition hole 4.25 5061 1 E 17-Nov-2016 1 5 03:45 04:00 0.25 pull NCA and pump EXN down 4.5 5061 1 E 17-Nov-2016 1 6 04:00 04:30 0.5 condition hole 5 5061 1 E 17-Nov-2016 1 7 04:30 05:00 0.5 204.01 207.01 1 3 3 100 clay "coring, EXN #10, 4.5m up, rod 67" 5.5 5061 1 E 17-Nov-2016 1 8 05:00 05:45 0.75 207.01 210.01 2 3 3 100 clay "coring, EXN #10, 4.5m up, rod 68" 6.25 5061 1 E 17-Nov-2016 1 9 05:45 06:30 0.75 210.01 210.01 0 repair hydraulic leak on rig 7 5061 1 E 18-Nov-2016 1 1 06:30 07:00 0.5 210.01 210.01 0 "site inspection, safety meeting" 0.5 5061 1 E 18-Nov-2016 1 2 07:00 07:30 0.5 210.01 210.01 0 "rods stuck, condition hole" 1 5061 1 E 18-Nov-2016 1 3 07:30 08:00 0.5 210.01 213.01 3 3 1.93 64.33 clay "coring, EXN #10, 4.5m up, rod 69" 1.5 5061 1 E 18-Nov-2016 1 4 08:00 08:30 0.5 213.01 216.01 4 3 3.12 104 clay "coring, EXN #10, 4.5m up, rod 70" 2 5061 1 E 18-Nov-2016 1 5 08:30 09:00 0.5 216.01 219.01 5 3 1.52 50.67 clay "coring, EXN #10, 4.5m up, rod 71" 2.5 5061 1 E 18-Nov-2016 1 6 09:00 09:30 0.5 219.01 222.01 6 3 0.38 12.67 clay "coring, EXN #10, 4.5m up, rod 72" 3 5061 1 E 18-Nov-2016 1 7 09:30 10:00 0.5 222.01 225.01 7 3 0.25 8.33 clay "coring, EXN #10, 4.5m up, rod 73" 3.5 5061 1 E 18-Nov-2016 1 8 10:00 11:00 1 225.01 228.01 8 3 0.97 32.33 clay "coring, EXN #10, 4.5m up, rod 74" 4.5 5061 1 E 18-Nov-2016 1 9 11:00 11:30 0.5 228.01 230.01 9 2 1.64 82 clay "coring, EXN #10, 4.5m up, rod 75" 5 5061 1 E 18-Nov-2016 1 10 11:30 12:00 0.5 230.01 231.01 10 1 0.9 90 clay "coring, EXN #10, 2.5m up, rod 76" 5.5 5061 1 E 18-Nov-2016 1 11 12:00 12:30 0.5 231.01 232.01 11 1 1.23 123 clay "coring, EXN #10, 1.5m up, rod 76" 6 5061 1 E 18-Nov-2016 1 12 12:30 13:00 0.5 232.01 233.01 12 1 1.53 153 clay "coring, EXN #10, 0.5m up, rod 76" 6.5 5061 1 E 18-Nov-2016 1 13 13:00 13:25 0.42 233.01 234.01 13 1 1.47 147 clay "coring, EXN #10, 2.5m up, rod 77" 6.92 5061 1 E 18-Nov-2016 1 14 13:25 13:55 0.5 234.01 236.01 14 2 1.63 81.5 clay "coring, EXN #10, 1.5m up, rod 77" 7.42 5061 1 E 18-Nov-2016 1 15 13:55 14:30 0.58 236.01 237.51 15 1.5 0.84 56 clay "coring, EXN #10, 2.5m up, rod 78" 8 5061 1 E 18-Nov-2016 1 16 14:30 15:00 0.5 237.51 239.01 16 1.5 2.49 166 clay "coring, EXN #10, 1.0m up, rod 78" 8.5 5061 1 E 18-Nov-2016 1 17 15:00 15:30 0.5 239.01 241.51 17 2.5 0 0 clay "coring, EXN #10, 2.5m up, rod 79" 9 5061 1 E 18-Nov-2016 1 18 15:30 16:50 1.33 241.51 243.01 18 1.5 1.73 115.33 clay "coring, EXN #8, 3.0m up, rod 80" 10.33 5061 1 E 18-Nov-2016 1 19 16:50 17:25 0.58 243.01 244.51 19 1.5 1.5 100 clay "coring, EXN #8, 1.5m up, rod 80" 10.91 5061 1 E 18-Nov-2016 1 20 17:25 18:05 0.67 244.51 247.51 20 3 3 100 clay "coring, EXN #8, 3.0m up, rod 81" 11.25 5061 1 E 18-Nov-2016 1 21 18:05 18:30 0.42 247.51 247.51 0 fuel up rig and genset 12 5061 1 E 18-Nov-2016 2 1 18:30 19:00 0.5 247.51 247.51 0 "pre-shift inspection, crew change" 0.5 5061 1 E 18-Nov-2016 2 2 19:00 19:30 0.5 247.51 247.51 0 condition hole 1 5061 1 E 18-Nov-2016 2 3 19:30 20:00 0.5 247.51 249.01 21 1.5 1.34 89.33 clay "coring, EXN #8, 3.0m up, rod 82" 1.5 5061 1 E 18-Nov-2016 2 4 20:00 21:00 1 249.01 250.51 22 1.5 3.33 222 clay "coring, EXN #8, 1.5m up, rod 82" 2.5 5061 1 E 18-Nov-2016 2 5 21:00 21:30 0.5 250.51 253.51 23 3 3.02 100.67 clay "coring, EXN #10, 3.0m up, rod 83" 3 5061 1 E 18-Nov-2016 2 6 21:30 22:15 0.75 253.51 256.51 24 3 2.57 85.67 clay "coring, EXN #10, 3.0m up, rod 84" 3.75 5061 1 E 18-Nov-2016 2 7 22:15 22:45 0.5 256.51 256.51 0 "weather delay, high winds and ligthning" 4.25 5061 1 E 18-Nov-2016 2 8 22:45 23:45 1 256.51 258.01 25 1.5 1.25 83.33 clay "coring, EXN #10, 1.5m up, rod 84" 5.25 5061 1 E 18-Nov-2016 2 9 23:45 00:45 1 258.01 261.01 26 3 3.19 106.33 clay "coring, EXN #10, 1.5m up, rod 85" 6.25 5061 1 E 18-Nov-2016 2 10 00:45 01:20 0.58 261.01 264.01 27 3 3.38 112.67 clay "coring, EXN #10, 1.5m up, rod 86" 6.83 5061 1 E 18-Nov-2016 2 11 01:20 02:00 0.67 264.01 267.01 28 3 2.59 86.33 clay "coring, EXN #10, 1.5m up, rod 87" 7.5 5061 1 E 18-Nov-2016 2 12 02:00 02:30 0.5 267.01 270.01 29 3 1.63 54.33 clay "coring, EXN #10, 1.5m up, rod 88" 8 5061 1 E 18-Nov-2016 2 13 02:30 03:00 0.5 270.01 273.01 30 3 1.96 65.33 clay "coring, EXN #10, 1.5m up, rod 89" 8.5 5061 1 E 18-Nov-2016 2 14 03:00 03:30 0.5 273.01 276.01 31 3 1.93 64.33 clay "coring, EXN #10, 1.5m up, rod 90" 9 5061 1 E 18-Nov-2016 2 15 03:30 04:00 0.5 276.01 279.01 32 3 0 0 "sand, clay" "coring, EXN #10, 1.5m up, rod 91" 9.5 5061 1 E 18-Nov-2016 2 16 04:00 04:40 0.67 279.01 282.01 33 3 2.5 83.33 clay "coring, EXN #10, 1.5m up, rod 92" 10.17 5061 1 E 18-Nov-2016 2 17 04:40 05:40 1 282.01 285.01 34 3 3 100 clay "coring, EXN #12, 1.5m up, rod 93" 11.17 5061 1 E 19-Nov-2016 1 1 06:30 07:00 0.5 285.01 285.01 0 "site inspection, safety meeting" 0.5 5061 1 E 19-Nov-2016 1 2 07:00 07:30 0.5 285.01 286.51 35 1.5 1.5 100 clay "coring, EXN #12, 1.5m up, rod 94" 1 5061 1 E 19-Nov-2016 1 3 07:30 08:05 0.58 286.51 288.01 36 1.5 1.5 100 clay "coring, EXN #12, 3.0m up, rod 95" 1.58 5061 1 E 19-Nov-2016 1 4 08:05 08:35 0.5 288.01 289.51 37 1.5 1.5 100 clay "coring, EXN #12, 1.5m up, rod 95" 2.08 5061 1 E 19-Nov-2016 1 5 08:35 09:05 0.5 289.51 291.01 38 1.5 1.5 100 clay "coring, EXN #12, 3.0m up, rod 96" 2.58 5061 1 E 19-Nov-2016 1 6 09:05 09:35 0.5 291.01 292.51 39 1.5 1.5 100 clay "coring, EXN #12, 1.5m up, rod 96" 3.08 5061 1 E 19-Nov-2016 1 7 09:35 10:05 0.5 292.51 294.01 40 1.5 1.5 100 clay "coring, EXN #12, 3.0m up, rod 97" 3.58 5061 1 E 19-Nov-2016 1 8 10:05 10:40 0.58 294.01 295.51 41 1.5 1.5 100 clay "coring, EXN #12, 1.5m up, rod 97" 4.16 5061 1 E 19-Nov-2016 1 9 10:40 11:10 0.5 295.51 297.01 42 1.5 1.5 100 clay "coring, EXN #12, 3.0m up, rod 98" 4.66 5061 1 E 19-Nov-2016 1 10 11:10 11:40 0.5 297.01 298.51 43 1.5 1.5 100 clay "coring, EXN #12, 1.5m up, rod 98" 5.16 5061 1 E 19-Nov-2016 1 11 11:40 12:20 0.67 298.51 301.51 44 3 3 100 clay "coring, EXN #12, 3.0m up, rod 99" 5.83 5061 1 E 19-Nov-2016 1 12 12:20 13:00 0.67 301.51 304.51 45 3 3 100 clay "coring, EXN #12, 3.0m up, rod 100, T.D. Hole 1E at 214.83mbs" 6.5 5061 1 E 19-Nov-2016 1 13 13:00 14:45 1.75 304.51 304.51 0 "trip out PQ breaking 3m joints free, science team off barge" 8.25 5061 1 E 19-Nov-2016 1 14 14:45 15:45 1 304.51 304.51 0 100 3m PQ rods and CB out of hole 9.25 5061 1 E 19-Nov-2016 1 15 15:45 18:30 2.75 304.51 304.51 0 "trip out, 3m sticks of casing, cutting tabs off as they came out" 12 5061 1 E 19-Nov-2016 2 1 18:30 06:30 12 304.51 304.51 0 transition to day shift 12