####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number # # 2 SITE Numeric "site number, integer" # # 3 HOLE Text "code for hole, one character (A_Z)" # # 4 REPORT_DATE Date date of report report date is a required value # 5 REPORT_NUMBER Integer number of report for selected date report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report activity number is a required value # 7 TIME_FROM Text time from required text string of max. 25 characters hh:mm 8 TIME_TO Text time to required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours real value >=0 h 10 STARTING_DEPTH Double starting depth of activity real value m 11 ENDING_DEPTH Double ending depth of activity real value m 12 CORE_NUMBER integer core run number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity real value >=0 m 14 CORE_RECOVERY double core recovery during activity real value >=0 m 15 CORE_RECOVERY_PC double core recovery during activity in percentage real value % 16 ROCK_TYPE Text rock type text string of max. 50 characters # 17 REMARKS Text remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours real value >=0 h ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5061 1 Z 10-Oct-2016 1 1 07:00 07:30 0.5 travel from hotel to staging area 0.5 5061 1 Z 10-Oct-2016 1 2 07:30 08:00 0.5 "pre-shift inspection, safety meeting" 1 5061 1 Z 10-Oct-2016 1 3 08:00 17:00 9 "continue barge assembly, almost complete, hand carried 7 floats, install last 3 high floats, install belly bands, hand carry wood decking, install wood decking, install hand rail pasts" 10 5061 1 Z 10-Oct-2016 1 4 17:00 17:45 0.75 "clean up, secure site" 10.75 5061 1 Z 10-Oct-2016 1 5 17:45 18:45 1 travel to hotel 11.75 5061 1 Z 11-Oct-2016 1 1 07:00 07:30 0.5 travel from hotel to staging area 0.5 5061 1 Z 11-Oct-2016 1 2 07:30 08:00 0.5 "pre-shift inspection, safety meeting" 1 5061 1 Z 11-Oct-2016 1 3 08:00 17:30 9.5 "continue barge assembly, install handrail cables and toekicks, build towable platform and install decking, handrails and toekicks, finish securing deck planks, put liners and logging winch inside container, organize and secure platform, shore,staging area" 10.5 5061 1 Z 11-Oct-2016 1 4 17:30 18:00 0.5 travel back to hotel 11 5061 1 Z 12-Oct-2016 1 1 07:00 19:00 12 "Brian and Jordan depart Taveta, drive to Nairobi and board flights to Amsterdam; Beau, Steve and Curt depart Taveta, drive to Kilimanjaro Tanzania and board flights to Amsterdam, Travel Day" 12 5061 1 Z 13-Oct-2016 1 1 08:00 16:00 8 "drill crews enroute from Amsterdam and arrive safely in USA, Travel Day" 8 5061 1 Z 22-Oct-2016 1 1 12:30 23:59 11.48 "crews depart USA, travel to Kilimanjaro, Tanzania (layover in Amsterdam)" 11.48 5061 1 Z 23-Oct-2016 1 1 12:00 20:30 8.5 "crew depart Amsterdam, travel to Kilimanjaro, take taxi to KIA lodge" 8.5 5061 1 Z 24-Oct-2016 1 1 08:00 16:00 8 "depart KIA lodge, travel to Arusha immigration office for residence stamps. Drive to Moshi immigration office for residence stamps (still no luck). Drive to staging area from Tanzania (cross over into Kenya), collect work gear from containers." 8 5061 1 Z 24-Oct-2016 1 2 16:00 17:00 1 Drive to Lake Challa hotel and settle in. 9 5061 1 Z 25-Oct-2016 1 1 07:30 08:15 0.75 drive from hotel to staging area 0.75 5061 1 Z 25-Oct-2016 1 2 08:15 08:45 0.5 "pre-shift inspection, safety meeting" 1 5061 1 Z 25-Oct-2016 1 3 08:45 18:00 9.25 "continue rigging up, Steve and Curt adjustments to barge, assembled xxx boat, began transporting SWT casing to shore. Beau and Caxton went to Kenya/TZ border to meet Geoserve team and assist in getting truck and equipment across the border." 10.5 5061 1 Z 25-Oct-2016 1 4 18:00 18:30 0.5 "Geoserve truck onsite at staging area, clean up and secure site" 11 5061 1 Z 25-Oct-2016 1 5 18:30 19:00 0.5 "travel back to hotel. Geoserve team moved into safari lodge and set up camp. Jordan Whitaker depart USA en route to Kilimanjaro, TZ" 11.5 5061 1 Z 26-Oct-2016 1 1 07:30 08:00 0.5 travel from hotel to staging area 0.5 5061 1 Z 26-Oct-2016 1 2 08:00 09:00 1 drive across the lake and pick up Geoserve team 1.5 5061 1 Z 26-Oct-2016 1 3 09:00 09:30 0.5 pre-shift safety meeting 2 5061 1 Z 26-Oct-2016 1 4 09:30 17:30 8 "truck crane onsite, unload DES boat, logging winch, power pack from containers. Unload Geoserve equipment from containers. Set/stage rig pieces and equipment in helicopter staging area. Steve and Curt work on disassembly and reconfiguration of towable ptf" 10 5061 1 Z 26-Oct-2016 1 5 17:30 18:00 0.5 "clean up, secure site" 10.5 5061 1 Z 26-Oct-2016 1 6 18:00 18:30 0.5 "travel back to hotel. Geoserver truck crane and semitruck released and escorted back to border. Jordan Whitaker traveled from USA-JRO, arrived in Taveta at 11pm" 11 5061 1 Z 27-Oct-2016 1 1 07:30 08:00 0.5 travel from hotel to staging area 0.5 5061 1 Z 27-Oct-2016 1 2 08:00 08:30 0.5 "pre-shift inspection, safety meeting" 1 5061 1 Z 27-Oct-2016 1 3 08:30 17:30 9 "Steve and Curt continue working on activiting towable platform, unload containers, load Geoserver equipment onto lorry and transport to rim, carry items down trail" 10 5061 1 Z 27-Oct-2016 1 4 17:30 18:00 0.5 secure site 10.5 5061 1 Z 27-Oct-2016 1 5 18:00 18:30 0.5 travel back to hotel. Helicopter pilot called and said he had to stop for some preventitive maintenance and can be at the lake at first light in the morning 11 5061 1 Z 28-Oct-2016 1 1 06:00 06:30 0.5 travel from hotel to staging area 0.5 5061 1 Z 28-Oct-2016 1 2 06:30 07:15 0.75 "pre-shif safety meeting, prep and standby for helicopter to arrive" 1.25 5061 1 Z 28-Oct-2016 1 3 07:15 08:00 0.75 "helicopter arrived onsite, task review and meeting" 2 5061 1 Z 28-Oct-2016 1 4 08:00 11:00 3 tow barge out into lake and secure 3 anchor lines 5 5061 1 Z 28-Oct-2016 1 5 11:00 11:25 0.42 1st helicopter lift completed - DES crew boat 5.42 5061 1 Z 28-Oct-2016 1 6 11:25 16:00 4.58 "continue with helicopter lifts (wood decking/cribbing, rig engine, HPV, rig base and small generator. Down draft/wash of helicopter would push barge, helicopter pilot would try to compensate, but it was decided the precision lifting could not be done with" 10 5061 1 Z 28-Oct-2016 1 7 16:00 18:45 2.75 "a floating platform. Anchor lines cannot be pulled tight because the HPV was not on platform, landed items on deck and used extra menpower to move them. Continue hand carrying items down trail." 12.75 5061 1 Z 28-Oct-2016 1 8 18:45 19:45 1 "clean up, secure site" 13.75 5061 1 Z 28-Oct-2016 1 9 19:45 19:30 23.75 "land cruiser broke down, call another vehicle to pick us up" 37.5 5061 1 Z 28-Oct-2016 1 10 19:30 20:00 0.5 travel back to hotel 38 5061 1 Z 29-Oct-2016 1 1 06:00 06:30 0.5 travel from hotel to staging area 0.5 5061 1 Z 29-Oct-2016 1 2 06:30 07:00 0.5 pre-shift safety meeting 1 5061 1 Z 29-Oct-2016 1 3 07:00 11:15 4.25 "continue with helicopter lifts - draw works, mast, tower mast, drill head, foot clamb, bean pump, logging winch, MQ genset" 5.25 5061 1 Z 29-Oct-2016 1 4 11:15 12:00 0.75 "all helicopter lifts complete, was taken up for some aerial shots before dismissing chopper. Chopper demobe started (full of fuel)." 6 5061 1 Z 29-Oct-2016 1 5 12:00 17:30 5.5 "tow, move barge back to shore, continue building drill rig and moving items onto barge." 11.5 5061 1 Z 29-Oct-2016 1 6 17:30 18:30 1 "fuel delivery, hose/tank connection issues" 12.5 5061 1 Z 29-Oct-2016 1 7 18:30 19:00 0.5 "clean up, secure site" 13 5061 1 Z 29-Oct-2016 1 8 19:00 19:30 0.5 travel back to hotel 13.5 5061 1 Z 30-Oct-2016 1 1 06:30 07:00 0.5 drive from hotel to staging area 0.5 5061 1 Z 30-Oct-2016 1 2 07:00 07:30 0.5 pre-shift meeting 1 5061 1 Z 30-Oct-2016 1 3 07:30 16:00 8.5 "continue rigging up, finish connecting hoses and building drill rig, test functions, build another zodiac boat, set up tents, run electrical cords, install lighting, set up 3 fuel tanks, move logging winch, hook up shvrflo pump, assembly outhouse," 9.5 5061 1 Z 30-Oct-2016 1 4 16:00 18:15 2.25 "make adjustments to fuel line, work on DES crew boat, install moon pool beam and casing hanger, casing hanger touches up against barge float and prohibits pipe from staying aligned with drill head (have to move float). Mics other tasks." 11.75 5061 1 Z 30-Oct-2016 1 5 18:15 18:45 0.5 "clean up, secure site" 12.75 5061 1 Z 30-Oct-2016 1 6 18:45 19:15 0.5 "travel back to hotel, we need 2 cycle TCW oil to mix with gasoline for boat engines. Boats cannot operate well or at all. Have sent locals to source 2x, no luck. Sent Geoserve now. When raising the mast the shaking motion caused the barge to flex/shake .." 12.75 5061 1 Z 31-Oct-2016 1 1 07:00 07:30 0.5 travel from hotel to staging area 0.5 5061 1 Z 31-Oct-2016 1 2 07:30 08:00 0.5 pre-shift safety meeting 1 5061 1 Z 31-Oct-2016 1 3 08:00 18:00 10 "continue rigging up, move float to accommodate casing hanger, set up core handling station, set up mud mixing station, hook up and test powerpack, secure drill rig to platform, start loading drill pipe." 11 5061 1 Z 31-Oct-2016 1 4 18:00 18:30 0.5 "clean up, secure site" 11.5 5061 1 Z 31-Oct-2016 1 5 18:30 19:00 0.5 travel back to hotel 12 5061 1 Z 01-Nov-2016 1 1 07:30 08:00 0.5 Jordan traveled to staging area to supervise porters carry down pipe and mud 0.5 5061 1 Z 01-Nov-2016 1 2 08:00 10:00 2 Beau travel of Safari lodge in Tanzania and drop off luggage 2.5 5061 1 Z 01-Nov-2016 1 3 10:00 15:00 5 "return to Challa hotel in Taveta, pick up Curt and Steve, go to Moshi buy food groceries, move into Safari lodge (Tanzania)" 7.5 5061 1 Z 01-Nov-2016 1 4 15:00 16:00 1 travel to site from Tanzania (boat problems) 8.5 5061 1 Z 01-Nov-2016 1 5 16:00 18:00 2 "work on troubleshooting DES crew boat, continue loading misc small items onto barge, install beacons etc." 10.5 5061 1 Z 01-Nov-2016 1 6 18:00 18:30 0.5 "clean up, secure site" 11 5061 1 Z 01-Nov-2016 1 7 18:30 19:00 0.5 "travel back to hotel. Jordan Whitaker worked until 3pm, traveld back to hotel, then was taken to JRO-Kilimanjaro airport and began travel back to USA" 11.5 5061 1 Z 02-Nov-2016 1 1 07:30 08:20 0.83 hike trail and take boat across lake to platform (slow boat ride) 0.83 5061 1 Z 02-Nov-2016 1 2 08:20 16:00 7.67 "continue rigging up, take apart boat motor, remove and clean 3 carbverators, need parts. Remove coring tools, spares and hand carry down trail. Set bouy at drill site 1. Assemble, repair lake tools (HPC's) from HSPDP project." 8.5 5061 1 Z 02-Nov-2016 1 3 16:00 17:45 1.75 "Continue troubleshooting, repairs on crew boat, waiting on parts" 10.25 5061 1 Z 02-Nov-2016 1 4 17:45 18:15 0.5 "clean up, secure site" 10.75 5061 1 Z 02-Nov-2016 1 5 18:15 19:00 0.75 "travel to hotel. Barge is finished and ready to tow - need to fix crew boat ASAP. Jordan Whitaker en route, returned to USA. Geoserve mechanic went to Tanga looking for fuel pump, pump housing for boat" 11.5 5061 1 Z 03-Nov-2016 1 1 07:00 08:30 1.5 "travel to barge (Kenya shore), 2 trips" 1.5 5061 1 Z 03-Nov-2016 1 2 08:30 09:00 0.5 "pre-shift inspection, safety meeting" 2 5061 1 Z 03-Nov-2016 1 3 09:00 14:00 5 "continue rigging up, continue troubleshooting DES crew boat problem (fuel system, power loss), continue trying to repair 25HP outboard motor (throttle handle), continue working on HPC's (stuck shear pins), run 2 anchor lines to buoy (site 1), prep to tow" 7 5061 1 Z 03-Nov-2016 1 4 14:00 17:30 3.5 "push off from shore, 2 zodiac boats pushing barge, arrive at site 1, attach 4 anchor ropes" 10.5 5061 1 Z 03-Nov-2016 1 5 17:30 18:00 0.5 "Cathead mount broke while tightening lines, recover cathead from lake, discuss" 11 5061 1 Z 03-Nov-2016 1 6 18:00 18:15 0.25 "clean up, secure site" 11.25 5061 1 Z 03-Nov-2016 1 7 18:15 19:00 0.75 travel back to hotel. Dirk went to Mombasa looking for boat motor solution for crew boat. 12 5061 1 Z 04-Nov-2016 1 1 07:15 08:15 1 "travel to site (2 trips, heavy rain storm last night, boats full of water)" 1 5061 1 Z 04-Nov-2016 1 2 08:15 08:45 0.5 "pre-shift inspection, safety meeting" 1.5 5061 1 Z 04-Nov-2016 1 3 08:45 15:45 7 "continue rigging up, build lake tools and BHA, secure tents and outhouse, install beacons, organize xxx, remove spools and mise items from barge, load test lighting on barge, finishing details on barge" 8.5 5061 1 Z 04-Nov-2016 1 4 15:45 16:00 0.25 "clean up, secure site (storm coming). Heavy rain, some wind and 1ft waves" 8.75 5061 1 Z 04-Nov-2016 1 5 16:00 16:45 0.75 travel back to hotel. Standby for cathead mounting bracket coming from USA 9.5 5061 1 Z 05-Nov-2016 1 1 07:15 09:45 2.5 "travel to barge (3 trips), bail water from last nights storm (40min round trip)" 2.5 5061 1 Z 05-Nov-2016 1 2 09:45 10:30 0.75 "rig up, prep to run casing" 3.25 5061 1 Z 05-Nov-2016 1 3 10:30 11:00 0.5 "pre-shift inspection, safety meeting" 3.75 5061 1 Z 05-Nov-2016 1 4 11:00 11:30 0.5 barge orientation 4.75 5061 1 Z 05-Nov-2016 1 5 11:30 17:30 6 run in hole with SWT casing (27 pcs) 10.25 5061 1 Z 05-Nov-2016 1 6 17:30 18:00 0.5 travel to hotel. Standing by for cathead mounting bracket from USA. Jordan Whitaker departed USA en route to Kilimanjaro 10.75 5061 1 Z 06-Nov-2016 1 1 07:30 08:30 1 travel to barge 1 5061 1 Z 06-Nov-2016 1 2 08:30 09:00 0.5 "pre-shift inspection, safety meeting" 1.5 5061 1 Z 06-Nov-2016 1 3 09:00 09:45 0.75 "lower casing, weld collar on top joint, land casing onto hanger and collar off" 2.25 5061 1 Z 06-Nov-2016 1 4 09:45 10:30 0.75 barge orientation meeting with science crews 3 5061 1 Z 06-Nov-2016 1 5 10:30 12:00 1.5 "run in hole with BHA, test/fit measure (2) HPC), (2) EXN and (2) ALN" 4.5 5061 1 Z 06-Nov-2016 1 6 12:00 12:30 0.5 trip in hole 8 rods 5 5061 1 Z 06-Nov-2016 1 7 12:30 14:45 2.25 "rig overheated, troubleshoot, find that a bearing is seizing up inside hyd cooler for motor, take apart, clean and grease" 7.25 5061 1 Z 06-Nov-2016 1 8 14:45 15:30 0.75 trip in hole 20 rods 8 5061 1 Z 06-Nov-2016 1 9 15:30 16:15 0.75 0 0.5 1 0.5 0.5 100 "clay, water" "coring, HPC, 0.85m up, rod 28 (spilled core on deck)" 8.75 5061 1 Z 06-Nov-2016 1 10 16:15 16:45 0.5 0.5 2.45 2 1.95 2.45 125.64 "water, clay" "coring, HPC, 1.15m down, rod 29 shot at 87m" 9.25 5061 1 Z 06-Nov-2016 1 11 16:45 17:00 0.25 2.45 "water, clay" "trip out 3m, pull back and hang 6m, rods are inside casing" 9.5 5061 1 Z 06-Nov-2016 1 12 17:00 18:00 1 2.45 2.45 0 "rebuild HPCs, clean up, secure site, process core" 10.5 5061 1 Z 06-Nov-2016 1 13 18:00 18:30 0.5 2.45 2.45 0 travel back to hotel. Jordan Whitaker traveld from USA-AMS-JRO and arrived at Safari lodge tonight 11