####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number expedition number (Int. 1 - 99999), required key field # 2 SITE Numeric site identifier, max. number between 1 and 9999 site identifier (num 4), required key field # 3 HOLE text hole identifier, A-Z hole identifier (max. 1 chars, A-Z), required key field # 4 CORE Numeric core identifier please enter a number between 1 and 99999 # 5 CORE_TYPE Text type of core, piston, gravity.... core type(max. 1 char), required field, valid core type # 6 TOP_DEPTH Double top depth of core top depth (float), required field >=0.0 m 7 DRILLED_LENGTH Double drilled length of the current core run real value >=0.0 m 8 BOTTOM_DEPTH Double bottom depth of core bottom depth (float), required field >=0.0 m 9 MCD_OFFSET Double offset of composite depth for core # # 10 CORE_RECOVERY Double length of recovered core real value >=0.0 m 11 CORE_RECOVERY_PC Double percentage of core recovery real value >=0.0 % 12 CORE_ONDECK Date date and time core comes on deck core on deck, (date UTC), required field # 13 ORIENTED Text is core oriented ? true or false oriented yes or no ? # 14 LAST_SECTION Integer number of last section of core section count, required, between 0 and 99 # 15 CORE_CATCHER Text core has catcher section ? core catcher (yes or no ), required field # 16 ANALYST Text initials of data operator / Curator, (fmax. 5 chars), required field # 17 REMARKS Text additional remarks, free text # # 18 IGSN Text IGSN text string of max. 15 characters # ####################### Data Part ############################# EXPEDITION SITE HOLE CORE CORE_TYPE TOP_DEPTH DRILLED_LENGTH BOTTOM_DEPTH MCD_OFFSET CORE_RECOVERY CORE_RECOVERY_PC CORE_ONDECK ORIENTED LAST_SECTION CORE_CATCHER ANALYST REMARKS IGSN 5052 1 B 2 Z 34.200 1 35.200 0 0 0 27-Jan-2011 10:25 no 0 yes VT ICDP5052EC4E101 5052 1 B 3 Z 35.200 1 36.200 0 0.150 15 27-Jan-2011 10:52 no 2 yes VT ICDP5052EC5E101 5052 1 B 4 Z 36.200 0.500 36.700 0 0.350 70 27-Jan-2011 12:41 no 3 yes VT Run interted by burst hydraulic hose, therefore run contains two runs drilled as details from first run were not recored ICDP5052EC6E101 5052 1 B 5 Z 36.700 0.200 36.900 0 0 0 27-Jan-2011 13:02 no 0 no VT KL ICDP5052EC7E101 5052 1 B 6 Z 36.900 0.200 37.100 0 0 0 27-Jan-2011 13:20 no 0 no VT ICDP5052EC8E101 5052 1 B 7 Z 37.100 0.500 37.600 0 0 0 27-Jan-2011 13:41 no 0 no VT ICDP5052EC9E101 5052 1 B 8 Z 37.600 0.200 37.800 0 0.200 100 27-Jan-2011 14:02 no 2 yes VT KL ICDP5052ECAE101 5052 1 B 9 Z 37.800 0.050 37.850 0 0 0 27-Jan-2011 14:15 no 0 no VT KL ICDP5052ECBE101 5052 1 B 10 Z 37.850 0.350 38.200 0 0.100 28.571 27-Jan-2011 15:15 no 4 yes VT ICDP5052ECCE101 5052 1 B 11 Z 38.200 0.400 38.600 0 0.080 20 27-Jan-2011 15:30 no 1 yes VT ICDP5052ECDE101 5052 1 B 12 Z 38.600 0.200 38.800 0 0.200 100 27-Jan-2011 15:47 no 2 yes VT Drill bit broke and was replaced. A core of wash 1.4m long was recovered which was held together by the drillers mud. A 10cm core was also recovered at the bottom of the core barrel ICDP5052ECEE101 5052 1 B 13 Z 38.800 0.800 39.600 0 0.800 100 27-Jan-2011 15:28 no 3 yes VT still recovering wash after drill bit broke and drill string was pulled ICDP5052ECFE101 5052 1 B 14 Z 39.600 0.300 39.900 0 0 0 27-Jan-2011 16:55 no 0 no VT ICDP5052ECGE101 5052 1 B 15 Z 39.900 0.100 40 0 0 0 28-Jan-2011 14:17 no 0 no VT Orientation line wrt drillers split applied ICDP5052ECHE101 5052 1 B 16 Z 40 0.200 40.200 0 0 0 28-Jan-2011 14:31 no 0 no VT KL- drilling stopped for the day well casing was aquired to stablise the hole. ICDP5052ECIE101 5052 1 B 17 Z 40.200 0.500 40.700 0 0.200 40 28-Jan-2011 15:07 no 2 yes VT KL- first run after casing implaced ICDP5052ECJE101 5052 1 B 18 Z 40.700 0.800 41.500 0 0.800 100 28-Jan-2011 15:23 no 3 yes VT KL ICDP5052ECKE101 5052 1 B 19 Z 41.500 0.300 41.800 0 0.200 66.667 28-Jan-2011 16:02 no 2 yes VT ICDP5052ECLE101 5052 1 B 20 Z 42.300 0.500 42.800 0 0.100 20 28-Jan-2011 16:39 no 1 yes VT Orientation line wrt drillers split applied ICDP5052ECME101 5052 1 B 21 Z 42.300 0.400 42.700 0 0.400 100 28-Jan-2011 17:16 no 2 yes VT ICDP5052ECNE101 5052 1 B 22 Z 42.700 1.400 44.100 0 0.450 32.143 29-Jan-2011 10:38 no 2 no VT Orientation line wrt drillers split applied ICDP5052ECOE101 5052 1 B 23 Z 44.100 0.300 44.400 0 0.400 133.333 29-Jan-2011 10:57 no 2 yes VT Drilling stopped so that the casing could be advanced ICDP5052ECPE101 5052 1 B 24 Z 44.400 0.300 44.700 0 0.280 93.333 29-Jan-2011 12:44 no 2 yes VT ICDP5052ECQE101 5052 1 B 25 Z 44.700 0.700 45.400 0 0.400 57.143 29-Jan-2011 13:17 no 3 yes VT ICDP5052ECRE101 5052 1 B 26 Z 45.400 0.400 45.800 0 0.300 75 29-Jan-2011 13:43 no 3 yes VT KL- it was decided to continue open whole drilling until a unit change was identified. Coring began again when the drillers mud showed a distinctive shift to a green colour ICDP5052ECSE101 5052 1 B 27 Z 70 0.400 70.400 0 0 0 30-Jan-2011 06:00 no 0 no VT ICDP5052ECTE101 5052 1 B 28 Z 93.300 1.200 94.500 0 1 83.333 30-Jan-2011 15:55 no 2 yes VT ICDP5052ECUE101 5052 1 B 29 Z 94.500 0.850 95.350 0 0.700 82.353 30-Jan-2011 16:23 no 2 yes VT ICDP5052ECVE101 5052 1 B 30 Z 95.350 1.250 96.600 0 1.100 88 30-Jan-2011 16:55 no 1 yes VT Orientation line wrt drillers split applied ICDP5052ECWE101 5052 1 B 31 Z 96.600 1.300 97.900 0 1.300 100 30-Jan-2011 17:23 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECXE101 5052 1 B 32 Z 97.900 1.200 99.100 0 1.100 91.667 30-Jan-2011 17:54 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECYE101 5052 1 B 33 Z 99.100 1.200 100.300 0 1.050 87.500 30-Jan-2011 20:15 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECZE101 5052 1 B 34 Z 100.300 1.500 101.800 0 1.500 100 30-Jan-2011 21:27 no 2 yes VT Core barrel jammed in the drill string and the drill string was pulled to recover the core barrel; Orientation line wrt drillers split applied ICDP5052EC0F101 5052 1 B 35 Z 101.800 1.600 103.400 0 1.570 98.125 30-Jan-2011 21:21 no 3 yes VT 3m of casing added; Orientation line wrt drillers split applied ICDP5052EC1F101 5052 1 B 36 Z 103.400 1.600 105 0 1.500 93.750 30-Jan-2011 22:27 no 3 yes VT Orientation line wrt drillers split applied ICDP5052EC2F101 5052 1 B 37 Z 105 1.500 106.500 0 1.500 100 30-Jan-2011 22:54 no 2 yes VT Orientation line wrt drillers split applied ICDP5052EC3F101 5052 1 B 38 Z 106.500 1 107.500 0 0.900 90 30-Jan-2011 23:08 no 2 yes VT Orientation line wrt drillers split applied ICDP5052EC4F101 5052 1 B 39 Z 107.500 1.500 109 0 0.930 62 30-Jan-2011 23:39 no 3 no VT Orientation line wrt drillers split applied ICDP5052EC5F101 5052 1 B 40 Z 109 0.500 109.500 0 0.930 186 30-Jan-2011 23:55 no 2 yes VT Orientation line wrt drillers split applied ICDP5052EC6F101 5052 1 B 41 Z 109.500 1.500 111 0 1.500 100 31-Jan-2011 00:25 no 2 yes VT bottom 0.5m was picked up in run 40; Orientation line wrt drillers split applied ICDP5052EC7F101 5052 1 B 42 Z 111 0.500 111.500 0 0.270 54 31-Jan-2011 00:40 no 1 no VT Orientation line wrt drillers split applied ICDP5052EC8F101 5052 1 B 43 Z 111.500 1 112.500 0 0.810 81 31-Jan-2011 01:10 no 1 no VT Orientation line wrt drillers split applied ICDP5052EC9F101 5052 1 B 44 Z 112.500 0.300 112.800 0 0.400 133.333 31-Jan-2011 01:20 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECAF101 5052 1 B 45 Z 112.800 1.500 114.300 0 1.320 88 31-Jan-2011 02:10 no 3 no VT Orientation line wrt drillers split applied ICDP5052ECBF101 5052 1 B 46 Z 114.300 0 114.300 0 0 0 31-Jan-2011 01:10 no 2 no VT ICDP5052ECCF101 5052 1 B 47 Z 114.300 0.300 114.600 0 0.300 100 31-Jan-2011 08:20 no 2 yes VT ICDP5052ECDF101 5052 1 B 48 Z 114.600 0.900 115.500 0 0.900 100 31-Jan-2011 09:00 no 1 yes VT Rain ed Out ICDP5052ECEF101 5052 1 B 49 Z 115.500 1.500 117 0 1.500 100 31-Jan-2011 01:50 no 2 yes VT ICDP5052ECFF101 5052 1 B 50 Z 117 0.300 117.300 0 0.300 100 31-Jan-2011 11:05 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECGF101 5052 1 B 51 Z 117.300 1.200 118.500 0 1 83.333 31-Jan-2011 11:49 no 1 yes VT Orientation line wrt drillers split applied ICDP5052ECHF101 5052 1 B 52 Z 118.500 1.500 120 0 1.500 100 31-Jan-2011 12:16 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECIF101 5052 1 B 53 Z 120 1.500 121.500 0 1.500 100 31-Jan-2011 12:44 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECJF101 5052 1 B 54 Z 121.500 1.500 123 0 1.650 110 31-Jan-2011 13:20 no 4 no VT Orientation line wrt drillers split applied ICDP5052ECKF101 5052 1 B 55 Z 123 1.500 124.500 0 1.350 90 31-Jan-2011 13:59 no 3 yes VT Top of run 55 is at the bottom of run 54 indicating the driller when further than measured; Orientation line wrt drillers split applied ICDP5052ECLF101 5052 1 B 56 Z 124.500 1.500 126 0 1.600 106.667 31-Jan-2011 14:33 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECMF101 5052 1 B 57 Z 126 1.500 127.060 0 1 66.667 31-Jan-2011 15:14 no 2 no VT Orientation line wrt drillers split applied ICDP5052ECNF101 5052 1 B 58 Z 127.060 0.600 128.100 0 1.100 183.333 31-Jan-2011 15:39 no 3 no VT Orientation line wrt drillers split applied ICDP5052ECOF101 5052 1 B 59 Z 128.100 1.400 129.500 0 1.300 92.857 31-Jan-2011 18:59 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECPF101 5052 1 B 60 Z 129.500 1.500 131 0 1.300 86.667 31-Jan-2011 19:29 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECQF101 5052 1 B 61 Z 131 1.500 132.500 0 1 66.667 31-Jan-2011 19:50 no 4 yes VT top of core contains the Alpine Fault; Orientation line wrt drillers split applied ICDP5052ECRF101 5052 1 B 62 Z 132.500 1 133.500 0 1 100 31-Jan-2011 20:17 no 3 yes VT ICDP5052ECSF101 5052 1 B 63 Z 133.500 1.600 135.100 0 1.540 96.250 31-Jan-2011 20:31 no 3 yes VT Orientation line wrt drillers split applied ICDP5052ECTF101 5052 1 B 64 Z 135.100 1.400 136.500 0 1.350 96.429 31-Jan-2011 20:52 no 3 no VT Orientation line wrt drillers split applied ICDP5052ECUF101 5052 1 B 65 Z 136.500 1.600 138.100 0 1.500 93.750 31-Jan-2011 21:14 no 3 no VT Orientation line wrt drillers split applied ICDP5052ECVF101 5052 1 B 66 Z 138.100 1.400 139.500 0 1.500 107.143 31-Jan-2011 21:35 no 2 no VT Orientation line wrt drillers split applied ICDP5052ECWF101 5052 1 B 67 Z 139.500 1.600 141.100 0 1.570 98.125 31-Jan-2011 21:58 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECXF101 5052 1 B 68 Z 141.100 1.400 142.500 0 1.370 97.857 31-Jan-2011 22:25 no 2 no VT Orientation line wrt drillers split applied ICDP5052ECYF101 5052 1 B 69 Z 142.500 1.600 144.100 0 1.530 95.625 31-Jan-2011 22:52 no 2 yes VT Orientation line wrt drillers split applied ICDP5052ECZF101 5052 1 B 70 Z 144.100 1.400 145.500 0 0.510 36.429 31-Jan-2011 23:34 no 3 yes VT Orientation line wrt drillers split applied ICDP5052EC0G101 5052 1 B 71 Z 145.500 1 146.500 0 0.650 65 31-Jan-2011 23:56 no 2 no VT Orientation line wrt drillers split applied ICDP5052EC1G101 5052 1 B 72 Z 146.500 0.900 147.400 0 0 0 01-Feb-2011 00:13 no 0 no VT ICDP5052EC2G101 5052 1 B 73 Z 147.400 1.100 148.500 0 0.440 40 01-Feb-2011 00:49 no 3 yes VT KL ICDP5052EC3G101 5052 1 B 74 Z 148.500 1.400 149.900 0 0.270 19.286 01-Feb-2011 01:26 no 2 no VT ICDP5052EC4G101 5052 1 B 75 Z 149.900 1.200 151.100 0 0.400 33.333 01-Feb-2011 01:54 no 1 no VT ICDP5052EC5G101