|
THUMBNAIL
|
NAME
|
REMARKS
|
DEPTH
|
|
UN_DTS_10.jpg
|
Grit checks the quality of the measurements after the installation of the cable.
|
0 - 0
|
|
UN_DTS_9.jpg
|
Mathias runs the DTS cable into the borehole.
|
0 - 0
|
|
UN_DTS_8.jpg
|
The cable is led through the packer.
|
0 - 0
|
|
UN_DTS_7.jpg
|
Joerg, Mathias and Guenter work at the platform.
|
0 - 0
|