|
UN_DTS_12.jpg
|
We run into the hole with the packer, the logging device and the DTS. For that, we have to set a tubing every 3 m to extract water from the open hole section to the surface and record the
flow. Joerg screws up the tubing and fixes it at the wireline ..
|
0 - 0
|