ICDPLogo.gif Hawaii Scientific Drilling Project
Additional Pictures
Date: 8/9/2001

ActProLogo.gif



THUMBNAIL NAME REMARKS DEPTH
UN_DTS_15.jpg The packer is set at 380 m and separates the flow from the casing break and the open hole section. After the shut in, a strong time dependent signal is visible. It has a 12 hour period and seems to origin from the tides... 0 - 0