|
THUMBNAIL
|
NAME
|
REMARKS
|
|
UN_Cement_Density_Check_HSDP-2b_1.jpg
|
Engineer Bruce Howell checks the density of the cement before it is poured into the syringe
|
|
UN_Cement_Syringe_In_Water_Out_HSDP-2b_1.jpg
|
Water is forced out the top of the pipe as the cement syringe is lowered in
|
|
UN_Pouring_In_Cement_HSDP-2b_1.jpg
|
Each driller has a job to do in order to load the cement syringe quickly and smoothly
|