|
THUMBNAIL
|
NAME
|
REMARKS
|
|
UN_Block_Raises_Elevators_HSDP-2b_1.jpg
|
As pipe is lowered into the hole, the elevators are released at the drilling floor and raised to the top of the next segment of pipe
|
|
UN_Shorty_Above_Top_Drive_HSDP-2b_1.jpg
|
Shorty makes an adjustment while high up on the rig
|
|
UN_Shorty_Climbs_Down_HSDP-2b_1.jpg
|
Shorty climbs down the side of the rig
|