UN_Casing_Sidewall_And_Shoe_HSDP-2b_1.jpg
|
This is a closeup of the extracted casing piece, showing the the weld that joined the shoe to the bottom of the casing.
|
|
UN_Casing_Sidewall_HSDP-2b_1.jpg
|
This is the sidewall of the casing we drilled through. This view shows the outside surface of the casing.
|
|
UN_Casing_Sidewall_Otherside_HSDP-2b_1.jpg
|
This picture shows the inside view of the extracted piece of casing. The length is approximately 117 cm.
|
|
UN_Casing_Sidewall_Twisted_HSDP-2b_1.jpg
|
This is a closeup of the twisted section of the extracted casing. The twist is a result of the casing getting caught in the core barrel during drilling.
|
|
UN_Casing_Sidewall_Twisted_HSDP-2b_2.jpg
|
This is the outer view of the twisted casing.
|
|
UN_Ed_DonD_donT_HSDP-2b_1.jpg
|
All the project Principal Investigators were at the site today and yesterday. From left to right they are Ed Stolper, Don DePaolo, and Don Thomas
|
|
UN_First_Core_Box_Rubble_HSDP-2b_1.jpg
|
This working core box contains the first two runs recovered during this current phase of the HSDP. All we have recovered is rubble so far.
|