UN_Crew_Loosens_Pipe_HSDP-2b_1.jpg
|
The drilling crew loosens a length of drill pipe as we back out of the hole for the night
|
|
UN_Lifting_Out_For_The_Night_HSDP-2b_1.jpg
|
Driller Ron Fierbach supervises the removal of drill pipe from the top drive
|
|
UN_Mud_Dump_HSDP-2b_1.jpg
|
When the decision is made to stop drilling for the day, the top pieces of pipe have to be removed until the bottom of the drill string is back inside the casing for the night. The pipes are
full of mud, which dumps out onto the drilling floor.
|