|
THUMBNAIL
|
NAME
|
REMARKS
|
|
UN_Bruce_Core_Tube_Latch_HSDP-2b_1.jpg
|
Bruce holds the latch where the core tube is supposed to be attached, but we weren't able to grab it on the first try
|
|
UN_First_Core_HSDP-2b_1.jpg
|
The first core of the project! We recovered 3.9 feet of brand new, very dense rock in this run
|
|
UN_Shorty_Joseph_Anticipate_HSDP-2b_1.jpg
|
Shorty and our new local driller Joseph anticipate the arrival of the core barrel at the top of the hole
|
|
UN_Shorty_Strings_Core_Barrel_HSDP-2b_1.jpg
|
Shorty attaches the wireline to the core barrel so it can be lifted out of the drill string and lowered to the catwalk below
|