| THUMBNAIL | NAME | REMARKS |
 | UN_Joseph_Pouring_Out_HSDP-2b_1.jpg | Joseph lets the last of the water contained in the 90-foot length of pipe pour out onto the drilling floor. It’s a wet job, but someone has to do it! |
 | UN_Joseph_Power_Tongs_HSDP-2b_1.jpg | Joseph unscrews two lengths of pipe with the power tongs as we trip out of the hole to change the bit |
 | UN_Tripping_Out_HSDP-2b_3.jpg | This 90-foot length of pipe is about to make its journey out of the hole |
 | UN_Water_Cannon_HSDP-2b_1.jpg | When the lenghts of pipe are separated, all of the water in the top piece rushes out onto the drilling floor. It generates a powerful spray that soaks everything and everyone in the area. |