| THUMBNAIL | NAME | REMARKS |
 | UN_Crew_Tightens_Pipe_HSDP-2b_1.jpg | Four drillers grab an extended pipe wrench to tighten another length of pipe. |
 | UN_Dave_At_The_Controls_HSDP-2b_1.jpg | Driller Dave Altman had at work. |
 | UN_Shorty_Checks_Shoe_HSDP-2b_1.jpg | Shorty checks the bottom of the core barrel for the new core. Alas, it appears that some of the core fell out the bottom of the show when this run was being tripped to the surface. |