| THUMBNAIL | NAME | REMARKS |
 | UN_Messy_Job_HSDP-2b_1.jpg | Shorty, Jeremy, and Dain are showered with drilling mud and water as they use the power tongs to separate consecutive lengths of pipe. |
 | UN_Pipe_Extraction_HSDP-2b_1.jpg | The drill crew pulls enough pipe out of the hole so the bit is safely up within the casing, then gets to work on a mechanical problem with our diesel engine. |
 | UN_Roll_Pipe_HSDP-2b_1.jpg | Dave and Dan roll the shorter lengths of pipe that have been removed from the top of the drill string off to the side of the catwalk. |