ICDPLogo.gif Hawaii Scientific Drilling Project
Additional Pictures
Date: 01/17/07

ActProLogo.gif



THUMBNAILNAMEREMARKS
UN_10_Ft_Run_HSDP-2b_1.jpgThis run is a full 10' long, and the bottom half holds together in solid pieces better than any portion we have cored at any point in HSDP2B.
UN_Core_Barrel_Insertion_Mud_Spray_HSDP-2b_1.jpgAs the empty core barrel is placed into the hole, mud flowing out the top rushes into it and shoots out the barrel's side holes.
UN_Jack_Avoids_Mud_Spray_HSDP-2b_1.jpgJack walks around to the other side of the drill pipe, hoping that the mud spray won't soak him there. Unfortunately, he did get hit with some of the slime.