 | UN_Over_Two_Miles_Of_Pipe_HSDP-2b_1.jpg | Although almost all the drill pipe is stacked on the rig right now, soon most of it will be tripped in the hole to insert a packer tool. This tool must be in place before we perforate the casing and inject cement around the outer diameter of the casing. |