####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit 1 EXPEDITION Numeric expedition number Expedition Number # # 2 SITE Numeric "site number, integer" Site Number # # 3 HOLE Text "code for hole, one character (A_Z)" Hole # # 4 REPORT_DATE Date date of report Report Date report date is a required value <>0 # 5 REPORT_NUMBER Integer number of report for selected date Report Number report number is a required value between 1 and 5 # 6 ACTIVITY_ID Integer number of activity for drilling report Activty Number activity number is a required value <>0 # 7 TIME_FROM Text time from From required text string of max. 25 characters hh:mm 8 TIME_TO Text time to To required text string of max. 25 characters hh:mm 9 TIME_HOURS Double hours Hours real value >=0 # 10 STARTING_DEPTH Double starting depth of activity Start Depth real value m 11 ENDING_DEPTH Double ending depth of activity End Depth real value m 12 CORE_NUMBER integer core run number Run Number integer value >0 # 13 DRILLED_LENGTH double drilled length during activity Drilled Length real value >=0 # 14 CORE_RECOVERY double core recovery during activity Core Recovery (m) real value >=0 # 15 CORE_RECOVERY_PC double core recovery during activity in percentage Core Recovery (%) real value # 16 ROCK_TYPE Text rock type Rock Type text string of max. 50 characters # 17 REMARKS Text remarks Remarks text string of max. 255 characters # 18 TOTAL_HOURS Double total duration of all activities in hours Total Hours real value >=0 # ####################### Data Part ############################# EXPEDITION SITE HOLE REPORT_DATE REPORT_NUMBER ACTIVITY_ID TIME_FROM TIME_TO TIME_HOURS STARTING_DEPTH ENDING_DEPTH CORE_NUMBER DRILLED_LENGTH CORE_RECOVERY CORE_RECOVERY_PC ROCK_TYPE REMARKS TOTAL_HOURS 5056 1 A 28-Jun-2015 1 1 07:00 19:00 12 "Rich Szentmiklosi traveled from USA to Lima, Peru" 12 5056 1 A 29-Jun-2015 1 1 07:00 19:00 12 "crane, boat, trucking, Geotec and customs (beagle)" 12 5056 1 A 30-Jun-2015 1 1 07:00 19:00 12 "Geotec, trucking, beagle, boat supplies" 12 5056 1 A 01-Jul-2015 1 1 07:00 19:00 12 "zodiak boat, waiting on customs" 12 5056 1 A 02-Jul-2015 1 1 07:00 19:00 12 "crane, trucking, waiting on customs" 12 5056 1 A 03-Jul-2015 1 1 07:00 19:00 12 "crane, trucking, customs - communications items" 12 5056 1 A 04-Jul-2015 1 1 07:00 19:00 12 "crane, boat supplies, waiting on customs" 12 5056 1 A 05-Jul-2015 1 1 07:00 19:00 12 waiting on customs 12 5056 1 A 06-Jul-2015 1 1 07:00 19:00 12 "customs class, work at Pedro's, waiting on customs" 12 5056 1 A 07-Jul-2015 1 1 07:00 19:00 12 customs inspection at port 12 5056 1 A 08-Jul-2015 1 1 07:00 19:00 12 "Geotec mtg, waiting on customs" 12 5056 1 A 09-Jul-2015 1 1 07:00 19:00 12 "Geotec mtg, crane, waiting on customs" 12 5056 1 A 10-Jul-2015 1 1 07:00 19:00 12 "Geotec mtg - MSCL, waiting on customs" 12 5056 1 A 11-Jul-2015 1 1 07:00 19:00 12 "waiting on customs, sent MSCL to Tarma" 12 5056 1 A 12-Jul-2015 1 1 07:00 19:00 12 "Jess Valeda traveled from USA to Lima, Peru, waiting on customs (Jess and Rick)" 12 5056 1 A 13-Jul-2015 1 1 07:00 19:00 12 "project prep in Lima, waiting on customs (Jess and Rick)" 12 5056 1 A 14-Jul-2015 1 1 07:00 19:00 12 "Jess Valeda traveled to Junin, project prep in Lima, consumables inspection was conceled, bought zodiak life rafts, waiting on customs (Jess and Rick)" 12 5056 1 A 15-Jul-2015 1 1 07:00 19:00 12 "Site visit in Junin, project prep in Lima, waiting on customs" 12 5056 1 A 16-Jul-2015 1 1 07:00 19:00 12 "Site prep in Junin, project prep in Lima, waiting on customs" 12 5056 1 A 17-Jul-2015 1 1 07:00 19:00 12 "Site prep in Junin, project prep in Lima, customs inspection" 12 5056 1 A 18-Jul-2015 1 1 07:00 19:00 12 "Site prep in Junin, project prep in Lima, stand by, waiting on customs" 12 5056 1 A 19-Jul-2015 1 1 07:00 19:00 12 "Site prep in Junin, project prep in Lima, stand by, waiting on customs" 12 5056 1 A 20-Jul-2015 1 1 07:00 19:00 12 "site prep in Junin, project prep in Lima, customs inspection, everything should be cleared and released tomorrow. Rich Szentmiklosi took a late evening (11pm) flight back to USA" 12 5056 1 A 21-Jul-2015 1 1 00:00 10:00 10 Rich Szentmiklosi traveled back to the USA. 10 5056 1 A 21-Jul-2015 1 2 10:00 17:30 7.5 "Jess Valeda continues with site prep in Junin, excavator finally showed up, canal dredging ops started." 29.5 5056 1 A 21-Jul-2015 1 3 17:30 19:30 2 drive back to hotel in Tarma 19.5 5056 1 A 22-Jul-2015 1 1 08:30 09:00 0.5 help science team unload crew truck 0.5 5056 1 A 22-Jul-2015 1 2 09:00 10:30 1.5 drive to lake 2 5056 1 A 22-Jul-2015 1 3 10:30 16:00 5.5 continue dredging ops on canal 7.5 5056 1 A 22-Jul-2015 1 4 16:00 18:15 2.25 "crane arrives on site, unload counter weights" 9.75 5056 1 A 22-Jul-2015 1 5 18:15 20:20 2.08 drive back to hotel 11.83 5056 1 A 23-Jul-2015 1 1 00:00 06:00 6 "Steve Cole enroute to Lima from USA, head to hotel to rest." 6 5056 1 A 23-Jul-2015 1 2 08:00 16:00 8 Steve Cole picked up from hotel in Lima and travels to lake by car. 14 5056 1 A 23-Jul-2015 1 3 06:30 06:45 0.25 load crew truck 14.25 5056 1 A 23-Jul-2015 1 4 06:45 08:30 1.75 drive to lake 16 5056 1 A 23-Jul-2015 1 5 08:30 10:15 1.75 "fuel up crane, fuel excavator, rig up crane" 17.75 5056 1 A 23-Jul-2015 1 6 10:15 11:30 1.25 "first truck arrives with flexi float barge pieces (4) 15', continue rigging up crane" 19 5056 1 A 23-Jul-2015 1 7 11:30 12:15 0.75 "crane assembled, sinking in ground, get unstuck, reposition crane" 19.75 5056 1 A 23-Jul-2015 1 8 12:15 18:15 6 "unload barge units and put into water, unload (2) supply containers, Geotec's equipment also arrived and was unloaded at lake. (5 trucks unloaded)" 25.75 5056 1 A 23-Jul-2015 1 9 18:15 19:45 1.5 drive back to hotel 27.25 5056 1 A 24-Jul-2015 1 1 07:00 07:30 0.5 breakfast 0.5 5056 1 A 24-Jul-2015 1 2 07:30 09:00 1.5 drive to launch site 2 5056 1 A 24-Jul-2015 1 3 09:00 09:30 0.5 "arrived on site to two trucks ready to unload. Geotec unloaded first truck. 2nd truck had barge pieces, wait for crane operator" 2.5 5056 1 A 24-Jul-2015 1 4 09:30 12:30 3 "unloaded trucks, assemble barge" 5.5 5056 1 A 24-Jul-2015 1 5 12:30 13:45 1.25 3rd truck arrives and gets unloaded and assembled all of barge 6.75 5056 1 A 24-Jul-2015 1 6 13:45 14:15 0.5 "barge fully assembled and tested around the corner and back, all works out" 7.25 5056 1 A 24-Jul-2015 1 7 14:15 17:45 3.5 all items onshore that were ready to be put on the barge were placed on the barge. Most of the focus was getting the rig placed over the casing ... As the mast does not move vertical. 10.75 5056 1 A 24-Jul-2015 1 8 17:45 18:00 0.25 Geotec crew needs some guidance as they all seem to try and work on the same thing. Geotec supervisor pulled aside to reset their focus. 11 5056 1 A 24-Jul-2015 1 9 18:00 19:30 1.5 "drive back to hotel, still waiting on one more truck (spuds etc)" 12.5 5056 1 A 25-Jul-2015 1 1 07:30 08:00 0.5 breakfast 0.5 5056 1 A 25-Jul-2015 1 2 08:00 09:30 1.5 travel to site 2 5056 1 A 25-Jul-2015 1 3 09:30 11:45 2.25 "continue drill platform setup, welding equipment down, assembling rig mast ans rods, boat motor fabrication and mount spud system, travel to store, get supplies" 4.25 5056 1 A 25-Jul-2015 1 4 11:45 12:05 0.33 "truck arrives with spuds etc., truck gets stuck, driver troubleshoots, begin moving spud holsters onto barge" 4.58 5056 1 A 25-Jul-2015 1 5 12:05 12:45 0.67 Geotec's delivery truck arrives with spud cables and clamps etc. Delivery truck helps get 1st truck unstuck. 5.25 5056 1 A 25-Jul-2015 1 6 12:45 13:45 1 Geotec and crane crew lunch 6.25 5056 1 A 25-Jul-2015 1 7 13:45 18:45 5 "continue to work on platform setup: spud system, mud tanks, bean ..., rig (mast), boat fabrications. Discus priorities and casing concerns with Geotec." 11.25 5056 1 A 25-Jul-2015 1 8 18:45 20:30 1.75 drive back to hotel 13 5056 1 A 26-Jul-2015 1 1 07:00 07:30 0.5 breakfast 0.5 5056 1 A 26-Jul-2015 1 2 07:30 09:00 1.5 drive to site 2 5056 1 A 26-Jul-2015 1 3 09:00 10:25 1.42 "arrived onsite to Geotec having a meeting, hole was to check out of bottom of the foot clamp plate, welder/fabricator finishing up boat trans..., finished last spudline" 3.42 5056 1 A 26-Jul-2015 1 4 10:25 15:00 4.58 "loaded last spud into holster, tested and works great, continue with welding to boar water, tired down hyd, lines to side of barge" 8 5056 1 A 26-Jul-2015 1 5 15:00 16:00 1 "loaded casing onto rack (4pcs.), relocated light plant, loaded pallet of mud onto mud tank, boat motor loaded onto boat, released crane." 9 5056 1 A 26-Jul-2015 1 6 16:00 17:00 1 "no luck with boat motor, fuel lines dry, fuel pump not working, checked manual, might be bad fuel pump or injectors or clogged filter" 10 5056 1 A 26-Jul-2015 1 7 17:00 18:30 1.5 HPC overview with Geotec crew 11.5 5056 1 A 26-Jul-2015 1 8 18:30 20:15 1.75 drive back to hotel 13.25 5056 1 A 27-Jul-2015 1 1 07:30 08:00 0.5 breakfast 0.5 5056 1 A 27-Jul-2015 1 2 08:00 10:00 2 drive to site 2.5 5056 1 A 27-Jul-2015 1 3 10:00 12:00 2 source carb cleaner and hose clamps for boat motor 4.5 5056 1 A 27-Jul-2015 1 4 12:00 13:30 1.5 "follow up with Geotec's progress on computing the platform: finish securing equip, safety PPE, first aid, etc, crew rain gear, heaters. Few items need to be secured: light plant, welder, science shack, pipe rack." 6 5056 1 A 27-Jul-2015 1 5 13:30 15:00 1.5 "tore into boat motor to diagnose a bad low fuel pump that is corroded. Informed Don and Mark and discusased options to order a new one along with other parts, bégan making ohone calls for parts needed." 7.5 5056 1 A 27-Jul-2015 1 6 15:00 17:00 2 "took cdiac out to put bean out and check depths again. Held a meeting about heaters (Geotec) with Don and Geotec, got some heaters" 9.5 5056 1 A 27-Jul-2015 1 7 17:00 18:30 1.5 drive back to hotel 9 5056 1 A 28-Jul-2015 1 1 08:00 08:30 0.5 breakfast 0.5 5056 1 A 28-Jul-2015 1 2 08:30 14:00 5.5 Don and team visit Nevado .... 6 5056 1 A 28-Jul-2015 1 3 14:00 20:00 6 Steve leaves for Lima (driver) to meet Beau for the boat parts aned should arive back tomorrow around 7am or 8am to head up to the launch site to install them. Hopefully all works well and we can tow out. Standby until further notice. 12 5056 1 A 29-Jul-2015 1 1 07:45 11:51 4.1 steve arrives from Lima with parts. Don and Steve go to site to reassemble boat motor. 4.1 5056 1 A 29-Jul-2015 1 2 11:51 14:10 2.32 received text from Steve 'All is a Go'. Head up to the site to help frive boat and get barge onto canal 6.42 5056 1 A 29-Jul-2015 1 3 14:10 14:30 0.33 arrived on site just in time for Geotec's christening ceremony before heading out onto the lake. 6.75 5056 1 A 29-Jul-2015 1 4 14:30 16:00 1.5 "Geotec crew begins to pull barge through canal. Barge get stuck half way, pulled the spuds up 5inches and continued. Windy, so hard to maneuver barge. Used zodiac and crew boat to make corrections and continue pulling barge through the canal." 8.25 5056 1 A 29-Jul-2015 1 5 16:00 17:50 1.83 made it out of the canal but very windy and between the crew boat and the wind we were traveling around 1-3kns. We made it about an 1/8 mile and decided to drop the spuds (too windy). 10.08 5056 1 A 29-Jul-2015 1 6 17:50 18:20 0.5 head back to launch site 10.58 5056 1 A 29-Jul-2015 1 7 18:20 20:00 1.67 drive back to hotel. Shifts begin tomorrow. Steve to call with update to see if all is good for a night shift. 12.25 5056 1 A 30-Jul-2015 1 1 04:00 06:00 2 travel to launch site 2 5056 1 A 30-Jul-2015 1 2 06:00 09:00 3 "hook up lights on crew boat, load all drilling spares on boat" 5 5056 1 A 30-Jul-2015 1 3 09:00 14:30 5.5 "tow barge out to site 1A: GPS: S 11.03650, W 76.11040" 10.5 5056 1 A 30-Jul-2015 1 4 14:30 16:00 1.5 "weld together BHA, length 4.48m, cut off bolt on mast causing head not to swing open." 12 5056 1 A 30-Jul-2015 1 5 16:00 17:30 1.5 "run 2 sticks of casing in at 11.10mbs, weld 3 tabs at joint" 13.5 5056 1 A 30-Jul-2015 1 6 17:30 18:00 0.5 run in CB + 2 3m rods 14 5056 1 A 30-Jul-2015 1 7 18:00 18:20 0.33 10.48 13.48 1 3 1.28 42.67 "coring HPC, 0m up on rod 2" 14.33 5056 1 A 30-Jul-2015 1 8 18:20 18:40 0.33 13.48 13.48 0 "coring HPC, 0m up on rod 3" 14.66 5056 1 A 30-Jul-2015 1 9 18:40 19:00 0.33 13.48 13.48 0 clean up platform 14.99 5056 1 A 30-Jul-2015 1 10 19:00 19:50 0.83 13.48 13.48 0 travel back to launch site on boat 15.82 5056 1 A 30-Jul-2015 1 11 19:50 21:30 1.67 13.48 13.48 0 travel back to hotel 17.49 5056 1 A 30-Jul-2015 2 1 16:00 18:00 2 "2 stops by police for gas, travel to launch site" 2 5056 1 A 30-Jul-2015 2 2 18:00 18:40 0.67 travel to drill platform 2.67 5056 1 A 30-Jul-2015 2 3 18:40 19:20 0.67 cross shift 3.34 5056 1 A 30-Jul-2015 2 4 19:20 21:35 2.25 "Reassemble HPC - driller nervouse, ease his nerves by telling him take his time. (Helpers keep telling him what to do). Water swivel seized up, charged out, reamed down rod #3, hook and drop tool, didn't feel or hear tool fire but pulled tool and it had." 5.59 5056 1 A 30-Jul-2015 2 5 21:35 22:50 1.25 13.48 16.48 1 3 2.98 99.33 "coring, HPC, rod 3 0.0 up (per Doug not worried about 2cm)" 6.84 5056 1 A 30-Jul-2015 2 6 22:50 23:30 0.67 16.48 19.48 2 3 3.06 102 "coring, HPC, rod 4 0.0 up (missfire, shoot again, ok)" 7.51 5056 1 A 30-Jul-2015 2 7 23:30 00:08 0.63 19.48 19.48 0 Geotec lunch 8.14 5056 1 A 30-Jul-2015 2 8 00:08 01:45 1.62 19.48 "adavnce casing, weld joint with 2 tabs (5.8m)" 9.76 5056 1 A 30-Jul-2015 2 9 01:45 02:45 1 19.48 22.48 3 3 3.04 101.33 "coring, HPC, rod 5 0.0 up" 10.76 5056 1 A 30-Jul-2015 2 10 02:45 03:45 1 22.48 25.48 4 3 1.37 45.67 "coring, HPC, rod 6 0.0 up (prep 2nd HPC, 1st HPC sat in water, washed out)" 11.76 5056 1 A 30-Jul-2015 2 11 03:45 04:45 1 25.48 28.48 5 3 3.08 102.67 "coring, HPC, rod 7 0.0 up (mislatch, reshoot, ok)" 12.76 5056 1 A 30-Jul-2015 2 12 04:45 05:00 0.25 28.48 31.48 6 3 2.99 99.67 "coring, HPC, rod 8 0.0 up (missfire, wrong seal sub on HPC)" 13.01 5056 1 A 30-Jul-2015 2 13 05:00 05:45 0.75 31.48 34.48 7 3 0.85 28.33 "coring, HPC, rod 9 0.0 up (inverted core catcher, switch to #10)" 14.51 5056 1 A 30-Jul-2015 2 14 05:45 06:00 0.25 34.48 34.48 0 "HPC, rod 10 0.0 up" 14.01 5056 1 A 30-Jul-2015 2 15 06:00 07:00 1 34.48 34.48 0 Geotec begins fueling and cleaning 15.01 5056 1 A 30-Jul-2015 2 16 07:00 07:50 0.83 34.48 34.48 0 boat ride back to launch site 15.84 5056 1 A 30-Jul-2015 2 17 07:50 09:20 1.5 34.48 34.48 0 travel back to hotel 17.34 5056 1 A 31-Jul-2015 1 1 06:00 07:00 1 34.48 34.48 0 travel to site 1 5056 1 A 31-Jul-2015 1 2 07:00 07:30 0.5 34.48 34.48 0 site inspection and safety meeting 1.5 5056 1 A 31-Jul-2015 1 3 07:30 08:30 1 34.48 37.48 9 3 2.25 75 clay "coring, HPC, rod 10 0.0 up #10" 2.5 5056 1 A 31-Jul-2015 1 4 08:30 10:00 1.5 37.48 40.48 10 3 2.58 86 clay "coring, HPC, rod 11 0.0 up #10" 4 5056 1 A 31-Jul-2015 1 5 10:00 10:50 0.83 40.48 43.48 11 3 1.77 59 clay "coring, HPC, rod 12 0.0 up #10" 4.83 5056 1 A 31-Jul-2015 1 6 10:50 11:15 0.42 43.48 46.48 12 3 2.08 69.33 clay "coring, HPC, rod 13 0.0 up #10, inverted GAS" 5.25 5056 1 A 31-Jul-2015 1 7 11:15 12:00 0.75 43.48 46.48 13 3 2.22 74 clay "coring, HPC, rod 13 0.0 up #12, stuck tube, recore" 6 5056 1 A 31-Jul-2015 1 8 12:00 13:20 1.33 46.48 49.48 14 3 2.5 83.33 clay "coring, HPC, rod 14 0.0 up #12 (lunch 12:30-13:00)" 7.33 5056 1 A 31-Jul-2015 1 9 13:20 13:50 0.5 49.48 52.48 15 3 2.53 84.33 clay "coring, HPC, rod 15 0.0 up #12" 7.83 5056 1 A 31-Jul-2015 1 10 13:50 14:15 0.42 52.48 55.48 16 3 1.78 59.33 clay "coring, HPC, rod 16 0.0 up #12" 8.25 5056 1 A 31-Jul-2015 1 11 14:15 15:00 0.75 55.48 58.48 17 3 1.45 48.33 clay "coring, HPC, rod 17 0.0 up #12" 9 5056 1 A 31-Jul-2015 1 12 15:00 15:40 0.67 58.48 61.48 18 3 2.23 74.33 clay "coring, HPC, rod 18 0.0 up #12" 9.67 5056 1 A 31-Jul-2015 1 13 15:40 16:20 0.67 61.48 64.48 19 3 1.5 49.99 clay "coring, HPC, rod 19 0.0 up #12" 10.34 5056 1 A 31-Jul-2015 1 14 16:20 16:45 0.42 64.48 67.48 20 3 1.47 49 clay "coring, HPC, rod 20 0.0 up #12" 10.76 5056 1 A 31-Jul-2015 1 15 16:45 17:25 0.67 67.48 70.48 21 3 1.66 55.33 clay "coring, HPC, rod 21 0.0 up #12" 11.43 5056 1 A 31-Jul-2015 1 16 17:25 18:00 0.58 70.48 73.48 22 3 1.59 53 clay "coring, HPC, rod 22 0.0 up #12, lots of gas in core making it to exspand!" 12.01 5056 1 A 31-Jul-2015 2 1 16:00 17:40 1.67 73.48 73.48 0 travel to launch site 1.67 5056 1 A 31-Jul-2015 2 2 17:40 19:00 1.33 73.48 73.48 0 travel from launch site to platform 3 5056 1 A 31-Jul-2015 2 3 19:00 20:30 1.5 73.48 76.48 23 3 1.15 38.33 "coring, HPC, rod 23 0.0 up, no fire, pull tool change to 2 pins" 4.5 5056 1 A 31-Jul-2015 2 4 20:30 21:50 1.33 76.48 79.48 24 3 0.78 26 peat "coring, HPC, rod 24 0.0 up, reshoot, no luck, ... Was pinched by tied line." 5.83 5056 1 A 31-Jul-2015 2 5 21:50 22:20 0.5 79.48 79.48 0 peat "reshot, ok, had to switch two 2 pins, mixture of peat and glacial sediments, poor recovery, try and call Steve for info. Per Steve: pump on low with 3 pins, takes 8-16min to shoot off, ream down rod #25" 6.33 5056 1 A 31-Jul-2015 2 6 22:20 23:20 1 79.48 82.48 25 3 2.33 77.67 hard clay "coring, HPC, rod 25 0.0 up (rods stuck, work free)" 7.33 5056 1 A 31-Jul-2015 2 7 23:20 00:20 1 82.48 85.48 26 3 3.04 101.33 hard clay "coring, HPC, rod 26 0.0 up (ream #25 and #26), rerun 26" 8.33 5056 1 A 31-Jul-2015 2 8 00:20 01:20 1 85.48 88.48 27 3 3.2 106.67 hard clay "coring, HPC, rod 27 0.0 up (ream 25, 26 and 27), tube stuck, work free" 9.33 5056 1 A 31-Jul-2015 2 9 01:20 02:20 1 88.48 91.48 28 3 3.05 101.67 hard clay "coring, HPC, rod 28 0.0 up (ream 27 and 28)" 10.33 5056 1 A 31-Jul-2015 2 10 02:20 03:20 1 91.48 94.48 29 3 3.09 103 hard clay "coring, HPC, rod 29 0.0 up (ream 28 and 29), mislatch, is fine" 11.33 5056 1 A 31-Jul-2015 2 11 03:20 05:00 1.67 94.48 97.48 30 3 2.36 78.67 clay "coring, HPC, rod 30 0.0 up, pull tool, full of core." 13 5056 1 A 31-Jul-2015 2 12 05:00 05:45 0.75 94.48 94.48 0 Geotec worker Alex injured. Giseppie and Segundo (Supervisors) horrified. Suspend operations until further notice. Per Giseppie and Segundo: Don and Steve notified as well. 13.75 5056 1 A 31-Jul-2015 2 13 05:45 07:00 1.25 94.48 94.48 0 "wash on hole until day shift arrived, clean platform, fuel rig" 15 5056 1 A 31-Jul-2015 2 14 07:00 09:30 2.5 94.48 94.48 0 travel from barge to hotel 17.5 5056 1 A 01-Aug-2015 1 1 05:30 06:40 1.17 94.48 94.48 0 travel to site 1.17 5056 1 A 01-Aug-2015 1 2 06:40 08:10 1.5 94.48 94.48 0 due to injury there was a long safety meeting and site inspection 2.67 5056 1 A 01-Aug-2015 1 3 08:10 08:50 0.67 97.48 100.48 31 3 1.6 53.33 clay "coring, HPC, rod 31 0.0 up #12" 3.34 5056 1 A 01-Aug-2015 1 4 08:50 09:35 0.75 100.48 103.48 32 3 1.4 46.67 clay "coring, HPC, rod 32 0.0 up" 4.09 5056 1 A 01-Aug-2015 1 5 09:35 10:20 0.75 103.48 106.48 33 3 2.33 77.67 gravel "coring, HPC, rod 33 0.0 up" 4.84 5056 1 A 01-Aug-2015 1 6 10:20 12:00 1.67 106.48 106.48 0 "coring, ALN, rod 34 0.0 up, HPC couldn't latch, pulled up 6m, send down ALN to get through gravel, sand blocked bit. Take 6m off and pull up 6m to try on clear bit." 6.51 5056 1 A 01-Aug-2015 1 7 12:00 12:30 0.5 106.48 106.48 0 Geotec lunch break 7.01 5056 1 A 01-Aug-2015 1 8 12:00 13:00 1 106.48 106.48 0 "bit is blocked, trip out 17 stands and clean out 3m of sand in BHA" 8.01 5056 1 A 01-Aug-2015 1 9 13:00 15:15 2.25 106.48 106.48 0 "trip in with ALN, had to ream the last 12m." 10.26 5056 1 A 01-Aug-2015 1 10 15:15 15:55 0.67 106.48 109.48 34 3 1.13 37.67 clay "coring, ALN, rod 34 0.0 up, tube stuck" 10.93 5056 1 A 01-Aug-2015 1 11 15:55 17:00 1.08 109.48 109.48 0 "broke pins on overshot, trip out 18 stands." 12.01 5056 1 A 01-Aug-2015 1 12 17:00 18:00 1 109.48 109.48 0 "grind welds at CB to get stuck ALN out, latch head backed off." 13.01 5056 1 A 01-Aug-2015 1 13 18:00 19:00 1 109.48 109.48 0 "weld BHA back together, tighten ALN tool to the max." 14.01 5056 1 A 01-Aug-2015 2 1 20:15 22:15 2 109.48 109.48 0 "trip to ream rods back to bottom, 3-4ijnches of gravel zone, rod #33, hole pretty clean ... Core rod 36 then HPC pull up 3m^" 2 5056 1 A 01-Aug-2015 2 2 22:15 23:30 1.25 109.48 112.48 35 3 0.56 18.67 sandy clay "coring, ALN, rod 35 0.0 up #10 combo" 3.25 5056 1 A 01-Aug-2015 2 3 23:30 00:24 0.9 112.48 112.48 0 "coring, ALN, rod 36 0.0 up catcher, rod 36 only went down 91.5cm, per Doug: ream out (may be remaining core from run #35), try again rod 36 164cm up, shot HPC at 183cm" 4.15 5056 1 A 01-Aug-2015 2 4 00:24 00:45 0.35 112.48 112.48 0 "pull HPC - fine to coarse sand inside tool, tool did not fire, pea gravel inside catcher" 4.5 5056 1 A 01-Aug-2015 2 5 00:45 01:00 0.25 112.48 112.48 0 discuss options to proceed with Mark and Doug 4.75 5056 1 A 01-Aug-2015 2 6 01:00 02:00 1 112.48 112.48 0 "A- cont. With extended nose (rods stuck, tool stuck) B- ream past bad zone and try again, C- mud up, D- call hole. We (Mark,Doug,myself) agreed to mud up to try and stabilize the hole and see what past this bad zone." 5.75 5056 1 A 01-Aug-2015 2 7 02:00 02:55 0.92 112.48 112.48 0 "Steve called at Tanard he agredd as well. Gisepe notified via text. Mixing 1st 4 bags bentonite, PQ+quick ...=52visc, per 500 gallon" 6.67 5056 1 A 01-Aug-2015 2 8 02:55 03:50 0.92 112.48 112.48 0 "ream rods 35 qnd 36 to bottom, rotate and wash with mud to keep the hole stabilized" 7.59 5056 1 A 01-Aug-2015 2 9 03:50 04:35 0.75 112.48 115.28 36 2.8 2 71.43 fine sand "coring, HPC rod 36 20cm up, tool fired per Mark" 8.34 5056 1 A 01-Aug-2015 2 10 04:35 06:00 1.42 115.28 115.28 0 "prep hole for logging, pump hole with mud, TD 115.28m" 9.76 5056 1 A 02-Aug-2015 1 1 06:00 07:00 1 115.28 115.28 0 travel to barge 1 5056 1 A 02-Aug-2015 1 2 07:00 07:30 0.5 115.28 115.28 0 safety meeting and site inspection 1.5 5056 1 A 02-Aug-2015 1 3 07:30 08:30 1 115.28 115.28 0 "set up logging winch, sheeve wheel, and tools. Remove the 6m stick up ... Leavers 35 rods and BHA hanging. Downhole at a depth of 109.48m" 2.5 5056 1 A 02-Aug-2015 1 4 08:30 10:50 2.33 115.28 115.28 0 logging through rods 4.83 5056 1 A 02-Aug-2015 1 5 10:50 11:20 0.5 115.28 115.28 0 "trip out 8 stands, log open hole at 61.48m" 5.33 5056 1 A 02-Aug-2015 1 6 11:20 15:50 4.5 115.28 115.28 0 logging 9.83 5056 1 A 02-Aug-2015 1 7 15:50 16:15 0.42 115.28 115.28 0 trip out 15 stands to log open hole at 10.48m 10.25 5056 1 A 02-Aug-2015 1 8 16:15 17:40 1.42 115.28 115.28 0 logging 11.67 5056 1 A 02-Aug-2015 1 9 17:40 18:00 0.33 115.28 115.28 0 "pack up logging tools, get ready for hole 2A" 12 5056 1 A 02-Aug-2015 2 1 18:00 19:00 1 115.28 115.28 0 travel to barge 1 5056 1 A 02-Aug-2015 2 2 19:00 19:45 0.75 115.28 115.28 0 safety meeting and site inspection 1.75 5056 1 A 02-Aug-2015 2 3 19:45 20:45 1 115.28 115.28 0 "6m + CB downhole, trip remaining rods (6m+CB) and pull up casing. Called Don to inform him of wind conditions and he suggested to pull one spud up and let it rotate 20m. Agreed 'Will do' when wind dies down." 2.75 5056 1 A 02-Aug-2015 2 4 04:00 04:45 0.75 115.28 115.28 0 rotate/walk platform 20m north 3.5 5056 1 A 02-Aug-2015 2 5 04:45 06:00 1.25 115.28 115.28 0 "measure water depth with casing, water depth 8.24m, constant to head 2.20m, put 2nd HPC together" 4.75 5056 1 B 03-Aug-2015 1 1 06:00 06:30 0.5 travel to site 0.5 5056 1 B 03-Aug-2015 1 2 06:30 07:00 0.5 safety meeting and site inspection 1 5056 1 B 03-Aug-2015 1 3 07:00 08:00 1 "set casing, 2 sticks at 11.1m, lower in CB and 6m set ready for HPC run" 2 5056 1 B 03-Aug-2015 1 4 08:00 08:45 0.75 11.48 14.48 1 3 3 100 "coring, HPC, rod 3 2.0 up #10" 2.75 5056 1 B 03-Aug-2015 1 5 08:45 09:30 0.75 14.48 17.48 2 3 2.36 78.67 "coring, HPC, rod 2 2.0 up #8" 3.5 5056 1 B 03-Aug-2015 1 6 09:30 10:20 0.83 17.48 20.48 3 3 3 100 clay "coring, HPC, rod 4 2.0 up #8" 4.33 5056 1 B 03-Aug-2015 1 7 10:20 11:30 1.17 20.48 20.48 0 "trip out 5 3m rods and CB and add 1 5.8m casing, total 3x5..., down hole" 5.5 5056 1 B 03-Aug-2015 1 8 11:30 12:10 0.67 20.48 23.48 4 3 3 100 clay "coring, HPC, rod 6 2.0 up #8" 6.17 5056 1 B 03-Aug-2015 1 9 12:10 13:35 1.42 23.48 26.48 5 3 3 100 clay "coring, HPC, rod 7 2.0 up #8" 7.59 5056 1 B 03-Aug-2015 1 10 13:35 14:00 0.42 26.48 29.48 6 3 3 100 clay "coring, HPC, rod 8 2.0 up #8" 8.01 5056 1 B 03-Aug-2015 1 11 14:00 14:40 0.67 29.48 32.48 7 3 3 100 clay "coring, HPC, rod 9 2.0 up #10" 8.68 5056 1 B 03-Aug-2015 1 12 14:40 15:05 0.42 32.48 35.48 8 3 3 100 clay "coring, HPC, rod 10 2.0 up #10" 9.1 5056 1 B 03-Aug-2015 1 13 15:05 15:50 0.75 35.48 38.48 9 3 3 100 clay "coring, HPC, rod 11 2.0 up #10" 9.85 5056 1 B 03-Aug-2015 1 14 15:50 16:15 0.42 38.48 41.48 10 3 3 100 clay "coring, HPC, rod 12 2.0 up #10" 10.27 5056 1 B 03-Aug-2015 1 15 16:15 16:50 0.58 41.48 44.48 11 3 3 100 clay "coring, HPC, rod 13 2.0 up #10" 10.85 5056 1 B 03-Aug-2015 1 16 16:50 17:25 0.58 44.48 44.48 0 "coring, HPC, rod 14 2.0 up #10, waves, no shot" 11.43 5056 1 B 03-Aug-2015 1 17 17:25 18:00 0.58 44.48 44.48 0 weather delay due to waves 12.01 5056 1 B 03-Aug-2015 2 1 18:00 20:10 2.17 44.48 44.48 0 "GPS: 11.03595 S, 76.11076 W, took of 6m an pulled up 6m" 2.17 5056 1 B 03-Aug-2015 2 2 20:10 21:30 1.33 44.48 44.48 0 "wetaher delay, ream down rod #12, 13 and ..., tried twice to get tube down but the waves knocked us off the hole and the rods are bent. Advised Mark, nad he agreed to move the barge 90° to start a new hole. Called Steve to inform him and he agreed as well" 3.5 5056 1 C 03-Aug-2015 3 1 21:30 23:10 1.67 "new hole 1C (GPS: 11.03507 S, 76.11080 W), trip all rods and casing out, move barge 10 m west" 1.67 5056 1 C 03-Aug-2015 3 2 23:10 00:15 1.08 "run 11.6m of casing in, run BHA, and PQ" 2.75 5056 1 C 03-Aug-2015 3 3 00:15 01:00 0.75 12.48 15.48 1 3 3.05 101.67 marl "coring, HPC, rod 3 1.0 up" 3.5 5056 1 C 03-Aug-2015 3 4 01:00 01:30 0.5 15.48 18.48 2 3 3.12 104 "marl, glacial" "coring, HPC, rod 4 1.0 up" 4 5056 1 C 03-Aug-2015 3 5 01:30 02:00 0.5 18.48 21.48 3 3 3.07 102.33 "glacial, clay" "coring, HPC, rod 5 1.0 up" 4.5 5056 1 C 03-Aug-2015 3 6 02:00 03:00 1 21.48 24.48 4 3 3.02 100.67 "glacial, clay" "coring, HPC, rod 6 1.0 up" 5.5 5056 1 C 03-Aug-2015 3 7 03:00 04:00 1 24.48 27.48 5 3 2.98 99.33 "glacial, clay" "coring, HPC, rod 7 1.0 up" 6.5 5056 1 C 03-Aug-2015 3 8 04:00 04:45 0.75 27.48 30.48 6 3 2.76 92 "glacial, org" "coring, HPC, rod 8 1.0 up, Geotec break (04:00-04:45)" 7.25 5056 1 C 03-Aug-2015 3 9 04:45 05:00 0.25 30.48 33.48 7 3 3.01 100.33 "marl, org, glacial" "coring, HPC, rod 9 1.0 up" 7.5 5056 1 C 03-Aug-2015 3 10 05:00 05:30 0.5 33.48 36.48 8 3 2.93 97.67 "marl, org, glacial" "coring, HPC, rod 10 1.0 up" 8 5056 1 C 03-Aug-2015 3 11 05:30 06:00 0.5 36.48 39.48 9 3 3.02 100.67 "marl, org, glacial" "coring, HPC, rod 11 1.0 up" 8.5 5056 1 C 04-Aug-2015 1 1 06:00 06:30 0.5 39.48 39.48 0 "GPS: 11.035075 S, 76.11080 W" 0.5 5056 1 C 04-Aug-2015 1 2 06:30 07:00 0.5 39.48 39.48 0 safety meeting and site inspection 1 5056 1 C 04-Aug-2015 1 3 07:00 08:50 1.83 39.48 39.48 0 "trip out rods and CB to add 1 stick of casing, trip back in" 2.83 5056 1 C 04-Aug-2015 1 4 08:50 09:15 0.42 39.48 42.48 10 3 3 100 clay "coring, HPC, rod 12 1.0 up #10" 3.25 5056 1 C 04-Aug-2015 1 5 09:15 09:50 0.58 42.48 45.48 11 3 3 100 clay "coring, HPC, rod 13 1.0 up #10" 3.83 5056 1 C 04-Aug-2015 1 6 09:50 10:25 0.58 45.48 48.48 12 3 2.94 98 clay "coring, HPC, rod 13 1.0 up #10" 4.41 5056 1 C 04-Aug-2015 1 7 10:25 11:00 0.58 48.48 51.48 13 3 3 100 clay "coring, HPC, rod 13 1.0 up #10" 4.99 5056 1 C 04-Aug-2015 1 8 11:00 11:30 0.5 51.48 54.48 14 3 3 100 clay "coring, HPC, rod 16 1.0 up #10" 5.49 5056 1 C 04-Aug-2015 1 9 11:30 12:00 0.5 54.48 57.48 15 3 3 100 "clay, peat" "coring, HPC, rod 17 1.0 up #10" 5.99 5056 1 C 04-Aug-2015 1 10 12:00 12:30 0.5 57.48 60.48 16 3 3 100 clay "coring, HPC, rod 18 1.0 up #10" 6.49 5056 1 C 04-Aug-2015 1 11 12:30 13:45 1.25 60.48 63.48 17 3 3 100 "clay, peat" "coring, HPC, rod 19 1.0 up #10, 12:30-01:00 lunch" 7.74 5056 1 C 04-Aug-2015 1 12 13:45 14:15 0.5 63.48 66.48 18 3 2.76 91.99 "clay, peat" "coring, HPC, rod 20 1.0 up #10, inverted" 8.24 5056 1 C 04-Aug-2015 1 13 14:15 14:50 0.58 66.48 69.48 19 3 3 100 clay "coring, HPC, rod 21 1.0 up #12" 8.82 5056 1 C 04-Aug-2015 1 14 14:50 15:15 0.42 69.48 72.48 20 3 3 100 clay "coring, HPC, rod 22 1.0 up #12" 9.24 5056 1 C 04-Aug-2015 1 15 15:15 15:45 0.5 72.48 75.48 21 3 2.34 78 "clay, peat" "coring, HPC, rod 23 1.0 up #12" 9.74 5056 1 C 04-Aug-2015 1 16 15:45 16:30 0.75 75.48 78.48 22 3 2.4 80 "clay, peat" "coring, HPC, rod 24 1.0 up #12, rods wouldn't go, shot 20cm up so total 120 up on rod 24" 10.49 5056 1 C 04-Aug-2015 1 17 16:30 17:20 0.83 78.48 81.48 23 3 3 100 "clay, peat" "coring, HPC, rod 25 1.0 up #12" 11.32 5056 1 C 04-Aug-2015 1 18 17:20 18:15 0.92 81.48 84.48 24 3 3 100 clay "coring, HPC, rod 26 1.0 up #12" 12.24 5056 1 C 04-Aug-2015 2 1 18:00 19:00 1 84.48 84.48 0 travel to barge 1 5056 1 C 04-Aug-2015 2 2 19:00 20:00 1 84.48 84.48 0 safety meeting and site inspection 2 5056 1 C 04-Aug-2015 2 3 20:00 21:00 1 84.48 87.48 25 3 3.09 103 clay "coring, HPC, rod 27 1.0 up #12, ream rod 25, 26 and 27" 3 5056 1 C 04-Aug-2015 2 4 21:00 22:00 1 87.48 90.48 26 3 3.09 103 "clay, carbonized" "coring, HPC, rod 28 1.0 up #12, ream 27 and 2m on 28" 4 5056 1 C 04-Aug-2015 2 5 22:00 23:00 1 90.48 93.48 27 3 2.96 98.67 clay "coring, HPC, rod 29 1.0 up #12, ream 28 and 2m on 29" 5 5056 1 C 04-Aug-2015 2 6 23:00 00:00 1 93.48 96.48 28 3 3.01 100.33 clay "coring, HPC, rod 30 1.0 up #12, ream 29 and 2m on 30" 6 5056 1 C 04-Aug-2015 2 7 00:00 01:00 1 96.48 99.48 29 3 1.46 48.67 hard clay "coring, HPC, rod 31 1.0 up #12, ream 30 and 2m on 31" 7 5056 1 C 04-Aug-2015 2 8 01:00 01:45 0.75 99.48 102.48 30 3 2.2 73.33 hard clay "coring, HPC, rod 32 1.0 up #12, ream and wash 31 and 2m on 32" 7.75 5056 1 C 04-Aug-2015 2 9 01:45 01:47 0.03 102.48 102.48 0 "coring, HPC, rod 33 1.0 up #12, ream and wash 32 and 2m on 33" 7.78 5056 1 C 04-Aug-2015 2 10 01:47 02:30 0.72 102.48 102.48 0 lightning delay 8.5 5056 1 C 04-Aug-2015 2 11 02:30 02:52 0.37 102.48 105.48 31 3 0.22 7.33 sandy clay "coring, HPC, rod 33 1.0 up #12, ream and wash 32 and 2m on 33" 8.87 5056 1 C 04-Aug-2015 2 12 02:52 04:00 1.13 105.48 105.48 0 "TD 105.48, Mark calls hole and logging to begin of ..., conditioning the hole (ream and wash), not looking for sand, per Mark" 10 5056 1 C 04-Aug-2015 2 13 04:00 04:20 0.33 105.48 105.48 0 trip PQ out of the hole 10.33 5056 1 C 04-Aug-2015 2 14 04:20 05:00 0.67 105.48 105.48 0 core barrel sucked up into the bottom of the head. Try and work free. Core barrel free. 11 5056 1 C 04-Aug-2015 2 15 05:00 06:00 1 105.48 105.48 0 "prep and begin logging, all PQ removed, casing left in hole, one PQ pipe in drill head per loggong crew, casing to be pulled up/out, so 1m still in the sediment" 12 5056 1 C 05-Aug-2015 1 1 06:00 06:30 0.5 105.48 105.48 0 travel to barge 0.5 5056 1 C 05-Aug-2015 1 2 06:30 07:00 0.5 105.48 105.48 0 safety meeting and site inspection 1 5056 1 C 05-Aug-2015 1 3 07:00 10:00 3 105.48 105.48 0 logged upper part of hole cause of bridge at 60m 4 5056 1 C 05-Aug-2015 1 4 10:00 11:10 1.17 105.48 105.48 0 trip in 16x6m + CB to 102.48 to clear bridge and log lower part of hole 5.17 5056 1 C 05-Aug-2015 1 5 11:10 11:30 0.33 105.48 105.48 0 trip out 8x6m rods to 52.48 for lower part of logging to be done. 5.5 5056 1 C 05-Aug-2015 1 6 11:30 12:00 0.5 105.48 105.48 0 logging lower section of hole 6 5056 1 C 05-Aug-2015 1 7 12:00 12:30 0.5 105.48 105.48 0 "logging probe will not pass 60m, again add 6mx1 and 1x3m with 1m stick up, so rods are at 61m." 6.5 5056 1 C 05-Aug-2015 1 8 12:30 13:30 1 105.48 105.48 0 logging 61m to 70m then bridge 7.5 5056 1 C 05-Aug-2015 1 9 13:30 14:00 0.5 105.48 105.48 0 Geotec lunch 8 5056 1 C 05-Aug-2015 1 10 14:00 16:00 2 105.48 105.48 0 "trip in 6x6m, log through pipe, gamma" 10 5056 1 C 05-Aug-2015 1 11 16:00 17:00 1 105.48 105.48 0 trip out 5x6m and log 70-95m 11 5056 1 C 05-Aug-2015 1 12 17:00 18:20 1.33 105.48 105.48 0 "trip out rods and CB and 1 stick of casing, log upper 10m" 12.33 5056 1 D 05-Aug-2015 2 1 18:00 18:30 0.5 travel to barge 0.5 5056 1 D 05-Aug-2015 2 2 18:30 19:00 0.5 safety meeting and site inspection 1 5056 1 D 05-Aug-2015 2 3 19:00 20:45 1.75 "spoke to driller (Johnny) about having helpers or himself, weld and grind BHA so we can put on a new adapter and barrel, Per safety member (Cesar): out of their job description (big discussion). Giseppe and Steve called. Assembled welded BHA." 2.75 5056 1 D 05-Aug-2015 2 4 20:45 21:00 0.25 pull up two sticks of casing to move platform 3 5056 1 D 05-Aug-2015 2 5 21:00 21:20 0.33 moved platform 180° W 3.33 5056 1 D 05-Aug-2015 2 6 21:20 22:15 0.92 "pull 5.5m of casing off set 1, run BHA and PQ rod and first shot fired 10cm above lake floor" 4.25 5056 1 D 05-Aug-2015 2 7 22:15 22:45 0.5 12.58 15.58 1 3 2.05 68.33 organic "coring, HPC, rod 2 0.90 up #8, ream/wash rod 2 + 2.10m on 3" 4.75 5056 1 D 05-Aug-2015 2 8 22:45 23:15 0.5 15.58 18.58 2 3 2.98 99.33 organic "coring, HPC, rod 3 0.90 up #8, ream/wash rod 3 + 2.10m on 4" 5.25 5056 1 D 05-Aug-2015 2 9 23:15 23:45 0.5 18.58 21.58 3 3 3 100 "organic, glacial" "coring, HPC, rod 4 0.90 up #8, ream/wash rod 4 + 2.10m on 5" 5.75 5056 1 D 05-Aug-2015 2 10 23:45 00:15 0.5 21.58 24.58 4 3 3.07 102.33 glacial "coring, HPC, rod 5 0.90 up #8, ream/wash rod 5 + 2.10m on 6" 6.25 5056 1 D 05-Aug-2015 2 11 00:15 00:45 0.5 24.58 27.58 5 3 2.98 99.33 glacial "coring, HPC, rod 6 0.90 up #8, ream/wash rod 6 + 2.10m on 7" 6.75 5056 1 D 05-Aug-2015 2 12 00:45 01:15 0.5 27.58 30.58 6 3 3.03 101 glacial "coring, HPC, rod 7 0.90 up #8, ream/wash rod 7 + 2.10m on 8" 7.25 5056 1 D 05-Aug-2015 2 13 01:15 01:45 0.5 30.58 33.58 7 3 3.06 102 "organic, glacial" "coring, HPC, rod 8 0.90 up #8, ream/wash rod 8 + 2.10m on 9" 7.75 5056 1 D 05-Aug-2015 2 14 01:45 02:15 0.5 33.58 36.58 8 3 2.94 98 "organic, glacial" "coring, HPC, rod 9 0.90 up #10, ream/wash rod 9 + 2.10m on 10" 8.25 5056 1 D 05-Aug-2015 2 15 02:15 02:45 0.5 36.58 39.58 9 3 2.95 98.33 "organic, glacial" "coring, HPC, rod 10 0.90 up #10, ream/wash rod 10 + 2.10m on 11" 8.75 5056 1 D 05-Aug-2015 2 16 02:45 03:35 0.83 39.58 42.58 10 3 3.12 104 "organic, carbonates, glacial" "coring, HPC, rod 11 0.90 up #10, ream/wash rod 11 + 2.10m on 12" 9.58 5056 1 D 05-Aug-2015 2 17 03:35 04:10 0.58 42.58 42.58 0 Geotec break 10.16 5056 1 D 05-Aug-2015 2 18 04:10 06:00 1.83 42.58 42.58 0 "trip to set 17.4m of casing (23.2m total), weld joints, rod 12 0.90m up" 11.99 5056 1 D 06-Aug-2015 1 1 06:00 06:30 0.5 40.48 40.48 0 100 safety meeting and site inspection 0.5 5056 1 D 06-Aug-2015 1 2 06:30 07:00 0.5 40.48 40.48 0 trip in 6x6m + CB to start HPC 1 5056 1 D 06-Aug-2015 1 3 07:00 08:10 1.17 40.48 43.48 11 3 3 100 clay "coring, HPC, rod 12 0.0 up #10" 2.17 5056 1 D 06-Aug-2015 1 4 08:10 08:45 0.58 43.48 46.48 12 3 3 100 clay "coring, HPC, rod 13 0.0 up #10" 2.75 5056 1 D 06-Aug-2015 1 5 08:45 09:10 0.42 46.48 49.48 13 3 2.17 72.33 "clay, peat" "coring, HPC, rod 14 0.0 up #10" 3.17 5056 1 D 06-Aug-2015 1 6 09:10 09:40 0.5 49.48 52.48 14 3 2.77 92.33 clay "coring, HPC, rod 15 0.0 up #10" 3.67 5056 1 D 06-Aug-2015 1 7 09:40 10:10 0.5 52.48 55.48 15 3 3 100 "clay, peat" "coring, HPC, rod 16 0.0 up #10" 4.17 5056 1 D 06-Aug-2015 1 8 10:10 10:40 0.5 55.48 58.48 16 3 2.94 98 "clay, peat" "coring, HPC, rod 17 0.0 up #10" 4.67 5056 1 D 06-Aug-2015 1 9 10:40 11:10 0.5 58.48 61.48 17 3 3 100 clay "coring, HPC, rod 18 0.0 up #10" 5.17 5056 1 D 06-Aug-2015 1 10 11:10 11:40 0.5 61.48 64.48 18 3 2.46 81.99 "clay, peat" "coring, HPC, rod 19 0.0 up #10" 5.67 5056 1 D 06-Aug-2015 1 11 11:40 12:50 1.17 64.48 67.48 19 3 3 100 "clay, peat" "coring, HPC, rod 20 0.0 up #10 (11:50-12:20 Geotec lunch)" 6.84 5056 1 D 06-Aug-2015 1 12 12:50 13:15 0.42 67.48 70.48 20 3 3 100 clay "coring, HPC, rod 21 0.0 up #10" 7.26 5056 1 D 06-Aug-2015 1 13 13:15 13:45 0.5 70.48 73.48 21 3 2.8 93.33 clay "coring, HPC, rod 22 0.0 up #10" 19.76 5056 1 D 06-Aug-2015 1 14 13:45 14:20 0.58 73.48 74.91 22 1.43 1.43 100 "clay, peat" "coring, HPC, rod 23 0.0 up #10" 20.34 5056 1 D 06-Aug-2015 1 15 14:20 15:00 0.67 74.91 76.48 23 1.57 2.43 154.77 "coring, HPC, rod 24 1.57 up #10 (overlap from 1A)" 9.01 5056 1 D 06-Aug-2015 1 16 15:00 18:00 3 76.48 76.48 0 "coring, HPC, rod 24 0.0 up #10, weather delay, waves moving barge, standby and mix mud till it calms down" 12.01 5056 1 D 06-Aug-2015 2 1 18:00 19:00 1 76.48 76.48 0 "travel to barge, check water depths in canal, 8 inch lower 'concerned'" 1 5056 1 D 06-Aug-2015 2 2 19:00 19:30 0.5 76.48 76.48 0 safety meeting and site inspection 1.5 5056 1 D 06-Aug-2015 2 3 19:30 20:30 1 76.48 79.48 24 3 2.37 79 "slupe, leave" "coring, HPC, rod 24 0.0 up #10, rods stuck, pull with head" 2.5 5056 1 D 06-Aug-2015 2 4 20:30 21:30 1 79.48 82.48 25 3 2.25 75 hard clay "coring, HPC, rod 25 0.0 up #10, (wash/ream 24+25)x3" 3.5 5056 1 D 06-Aug-2015 2 5 21:30 22:30 1 82.48 85.48 26 3 2.75 91.67 glacial "coring, HPC, rod 26 0.0 up #12, (wash/ream 25+26)x3" 4.5 5056 1 D 06-Aug-2015 2 6 22:30 23:30 1 85.48 88.48 27 3 2.73 91 glacial "coring, HPC, rod 27 0.0 up #12, (wash/ream 26+27)x3" 5.5 5056 1 D 06-Aug-2015 2 7 23:30 00:30 1 88.48 91.48 28 3 2.72 90.67 clay "coring, HPC, rod 28 0.0 up #12, (wash/ream 27+28)x3" 6.5 5056 1 D 06-Aug-2015 2 8 00:30 01:00 0.5 91.48 94.48 29 3 2.73 91 clay "coring, HPC, rod 29 0.0 up #12, (wash/ream 28+29)x3" 7 5056 1 D 06-Aug-2015 2 9 01:00 01:30 0.5 94.48 97.48 30 3 0 0 soft clay "coring, ALN, rod 30 3 up #10, no recovery, soft clay and silt (per Don)" 7.5 5056 1 D 06-Aug-2015 2 10 01:30 02:00 0.5 97.48 100.48 31 3 2.59 86.33 "soft clay, glacial" "coring, HPC, rod 30 0.0 up, (per Jess), Rob, Mark and Nick on board" 8 5056 1 D 06-Aug-2015 2 11 02:00 02:30 0.5 100.48 102.33 32 1.85 1.85 100 "soft clay, glacial" "coring, HPC, rod 31 0.0 up, (per Jess), Rob, Mark and Nick on board" 8.5 5056 1 D 06-Aug-2015 2 12 02:30 03:00 0.5 102.33 103.98 33 1.65 1.65 99.99 "clay, glacial" "coring, HPC, rod 32 1.15 up, advance by recovery per Rob" 9 5056 1 D 06-Aug-2015 2 13 03:00 03:30 0.5 103.98 105.59 34 1.61 1.61 100 "clay, organic" "coring, HPC, rod 33 2.50 up, O-ring jammed line" 9.5 5056 1 D 06-Aug-2015 2 14 03:30 04:30 1 105.59 "coring, HPC, rod 33 0.91 up, per Don and Nick continued with HPC until sand switsch to NCA for 2m and HPC again (03:40)" 10.5 5056 1 D 06-Aug-2015 2 15 04:30 05:15 0.75 105.59 107.35 35 1.76 1.76 100 "sand, gravel" "run 25, hit sand layer, per Don: once we hit sand mud up and NCA 12m and take a shot with HPC" 11.25 5056 1 D 06-Aug-2015 2 16 05:15 07:30 2.25 107.35 120.48 13.13 ream down remaining 1.13m plus 12m: 120.48m rod 37 0.0 up HPC 13.5 5056 1 D 06-Aug-2015 2 17 07:30 08:00 0.5 120.48 120.48 0 "no shot, sand and gravel all around HPC and in the bottom of the tube, logging to take place" 14 5056 1 D 07-Aug-2015 1 1 06:00 06:30 0.5 42.58 42.58 0 site inspection and safety meeting 0.5 5056 1 D 07-Aug-2015 1 2 06:30 08:30 2 42.58 42.58 0 mix mud and circulate hole 2.5 5056 1 D 07-Aug-2015 1 3 08:30 13:00 4.5 42.58 42.58 0 trip out 9x6m rods and log lower half of hole 66m-120m 7 5056 1 D 07-Aug-2015 1 4 13:00 15:00 2 42.58 42.58 0 logging 9 5056 1 D 07-Aug-2015 1 5 15:00 16:00 1 42.58 42.58 0 trip back in to bottom to clear bridge 10 5056 1 D 07-Aug-2015 1 6 16:00 17:30 1.5 42.58 42.58 0 logging 11.5 5056 1 D 07-Aug-2015 1 7 17:30 18:30 1 42.58 42.58 0 night shift to trip all rods + CB out of hole 12.5 5056 1 D 07-Aug-2015 2 1 18:00 18:30 0.5 42.58 42.58 0 site inspection and safety meeting 0.5 5056 1 D 07-Aug-2015 2 2 18:30 19:30 1 42.58 42.58 0 Jess+Yokum: arrived onsite to loggers finishing up their second to last logging tool. Loggers log last tool within the remainder of the hole. Trip remaining rods and CB out of hole (5 rods + CB). Shut down barge and head back to shore with crew/loggers. 1.5 5056 1 D 07-Aug-2015 2 3 19:30 21:00 1.5 42.58 42.58 0 drive back to hotel 3 5056 1 D 07-Aug-2015 2 4 21:00 06:00 9 42.58 42.58 0 standby until day shift begins 12 5056 1 E 08-Aug-2015 1 1 06:00 07:00 1 "Standby for gas, travel to barge" 1 5056 1 E 08-Aug-2015 1 2 07:00 07:30 0.5 Safety meeting and site inspection 1.5 5056 1 E 08-Aug-2015 1 3 07:30 10:00 2.5 "take out 2 sticks of casing, cut tubes off. Pull up the third stick and leave the forth hanging. Geotec working on main line motor." 4 5056 1 E 08-Aug-2015 1 4 10:00 11:10 1.17 "continue on casing, move barge over to site 1E" 5.17 5056 1 E 08-Aug-2015 1 5 11:00 11:40 0.67 Geotec lunch 5.84 5056 1 E 08-Aug-2015 1 6 11:40 12:45 1.08 "run in 2 sticks of casing, total 4" 6.92 5056 1 E 08-Aug-2015 1 7 12:45 14:10 1.42 ream down to 37.48m with NCA 8.34 5056 1 E 08-Aug-2015 1 8 14:10 14:35 0.42 37.48 40.48 1 3 3 100 clay "coring, HPC, rod 11 0.0 up #10, ream 1m" 8.76 5056 1 E 08-Aug-2015 1 9 14:35 15:00 0.42 41.48 44.48 2 3 3 100 "clay, peat" "coring, HPC, rod 13 2m up #10" 9.18 5056 1 E 08-Aug-2015 1 10 15:00 15:30 0.5 44.48 47.48 3 3 2.98 99.33 clay "coring, HPC, rod 12 0.0 up #10" 9.68 5056 1 E 08-Aug-2015 1 11 15:30 16:00 0.5 47.48 50.48 4 3 3 100 clay "coring, HPC, rod 15 2m up #10" 10.18 5056 1 E 08-Aug-2015 1 12 16:00 16:35 0.58 50.48 53.48 5 3 2.76 92 "clay, peat" "coring, HPC, rod 16 2m up #10" 10.76 5056 1 E 08-Aug-2015 1 13 16:35 17:05 0.5 53.48 56.48 6 3 2.25 75 "clay, marl" "coring, HPC, rod 17 2m up #10" 11.26 5056 1 E 08-Aug-2015 1 14 17:05 17:40 0.58 56.48 59.48 7 3 2.56 85.33 "clay, marl" "coring, HPC, rod 18 2m up #10" 11.84 5056 1 E 08-Aug-2015 1 15 17:40 18:00 0.33 59.48 "clay, marl" weather delay 12.17 5056 1 E 08-Aug-2015 2 1 18:30 19:00 0.5 59.48 59.48 0 arrived to launch site and Steve was there with the night shift on the crew boat showing them the hole on the bottom. 0.5 5056 1 E 08-Aug-2015 2 2 19:00 19:15 0.25 59.48 59.48 0 "Steve had it plugged with a nail and a rag temporarely until we source a generator, welder and an excavator/cane to pick the boat out of the water to patch it correctly." 0.75 5056 1 E 08-Aug-2015 2 3 19:15 19:30 0.25 59.48 59.48 0 Don quickly gets on the phone with connections as well as Gisepe and Jim to try and source everything needed to get the crew boat into working order. Saturday night and Sunday nothing really available. 1 5056 1 E 08-Aug-2015 2 4 19:30 21:00 1.5 59.48 59.48 0 Drive back to hotel 2.5 5056 1 E 08-Aug-2015 2 5 21:00 06:00 9 59.48 59.48 0 standby until morning 11.5 5056 1 E 09-Aug-2015 1 1 06:00 08:30 2.5 59.48 59.48 0 "standby until welder arrives, Don was able to source a welder with a generator to meet Steve and Pedro at 8:30am at the hotel." 2.5 5056 1 E 09-Aug-2015 1 2 08:30 10:00 1.5 59.48 59.48 0 drive to launch site to meet with excavator and crew (Jim sourced) 4 5056 1 E 09-Aug-2015 1 3 10:00 13:00 3 59.48 59.48 0 standby until excavator shows up 7 5056 1 E 09-Aug-2015 1 4 13:00 14:00 1 59.48 59.48 0 excavator arrives but takes lunch 8 5056 1 E 09-Aug-2015 1 5 14:00 14:20 0.33 59.48 59.48 0 unload excavator and rig up boat 8.33 5056 1 E 09-Aug-2015 1 6 14:20 14:40 0.33 59.48 59.48 0 lift boat out of water 8.66 5056 1 E 09-Aug-2015 1 7 14:40 15:00 0.33 59.48 59.48 0 attempt to weld patch on the underside of the boat. Generator does not have enough power to operate welder. Source another generator. 8.99 5056 1 E 09-Aug-2015 1 8 15:00 18:00 3 59.48 59.48 0 "standby untile morning, no night shift" 11.99 5056 1 E 09-Aug-2015 2 1 18:00 06:00 12 59.48 59.48 0 crew standby until a proper generator for welder is found 12 5056 1 E 10-Aug-2015 1 1 06:00 09:00 3 59.48 59.48 0 standby for generator 3 5056 1 E 10-Aug-2015 1 2 09:00 10:40 1.67 59.48 59.48 0 travel to launch site 4.67 5056 1 E 10-Aug-2015 1 3 10:40 13:00 2.33 59.48 59.48 0 "hooked up welder to generator but welder didn't work. Sourced a guy with a welder in Junin that had a generator as well. Brought the guy back to the launch site, welded a patch over the hole." 7 5056 1 E 10-Aug-2015 1 4 13:00 15:30 2.5 59.48 59.48 0 Drive welder and his equipment back to Junin and then back to the launch site. Standby at launch site untile excavator operator arrives. 9.5 5056 1 E 10-Aug-2015 1 5 15:30 16:00 0.5 59.48 59.48 0 Operator arrives and lowers boat into water 10 5056 1 E 10-Aug-2015 1 6 16:00 16:30 0.5 59.48 59.48 0 test drive boat to ensure there are no leakes. 10.5 5056 1 E 10-Aug-2015 1 7 16:30 18:00 1.5 59.48 59.48 0 standby until night shift arrives and take them out to the barge 12 5056 1 E 10-Aug-2015 2 1 18:00 18:30 0.5 59.48 59.48 0 travel to barge 0.5 5056 1 E 10-Aug-2015 2 2 18:30 19:00 0.5 59.48 59.48 0 site inspection and safety meeting 1 5056 1 E 10-Aug-2015 2 3 19:00 20:05 1.08 59.48 59.48 0 weather delay 2.08 5056 1 E 10-Aug-2015 2 4 20:05 22:12 2.12 59.48 59.48 0 ream with NCA to 59.48 4.2 5056 1 E 10-Aug-2015 2 5 22:12 22:32 0.33 59.48 62.48 8 3 2.77 92.33 "clay, peat" "coring, HPC, rod 19 2m up #10" 4.53 5056 1 E 10-Aug-2015 2 6 22:32 23:12 0.67 62.48 65.48 9 3 2.32 77.33 "clay, marl" "coring, HPC, rod 20 2m up #10" 5.2 5056 1 E 10-Aug-2015 2 7 23:12 23:46 0.57 65.48 68.48 10 3 3.21 107 "marl, peat, clay" "coring, HPC, rod 21 2m up #10" 5.77 5056 1 E 10-Aug-2015 2 8 23:46 00:20 0.57 68.48 71.48 11 3 2.74 91.33 clay "coring, HPC, rod 22 2m up #10" 6.34 5056 1 E 10-Aug-2015 2 9 00:20 01:00 0.67 71.48 74.48 12 3 2.2 73.33 "peat, clay" "coring, HPC, rod 23 2m up #10" 7.01 5056 1 E 10-Aug-2015 2 10 01:00 02:00 1 74.48 74.48 0 "mislatch, try to clean BHA" 8.01 5056 1 E 10-Aug-2015 2 11 02:00 02:26 0.43 74.48 74.48 0 Geotec lunch 8.44 5056 1 E 10-Aug-2015 2 12 02:26 02:42 0.27 74.48 77.48 13 3 2.67 89 "marl, peat" "try HPC, coring, HPC, rod 24 2m up #10" 8.71 5056 1 E 10-Aug-2015 2 13 02:42 03:56 1.23 77.48 80.48 14 3 1.83 61 "marl, peat" "coring, HPC, rod 25 2m up #10" 9.94 5056 1 E 10-Aug-2015 2 14 03:56 05:15 1.32 80.48 83.48 15 3 2.85 95 clay "coring, HPC, rod 26 2m up #10" 11.26 5056 1 E 10-Aug-2015 2 15 05:15 06:05 0.83 83.48 86.46 16 2.98 3.08 103.36 clay "coring, HPC, rod 27 2m up #10" 12.09 5056 1 E 11-Aug-2015 1 1 06:00 06:30 0.5 86.46 86.46 0 travel to barge 0.5 5056 1 E 11-Aug-2015 1 2 06:30 07:00 0.5 86.46 86.46 0 site inspection and safety meeting 1 5056 1 E 11-Aug-2015 1 3 07:00 09:00 2 86.46 86.46 0 "trip out 13x6m + 11x3m rods and 3 sticks of casing and 1 hanging, pull spuds" 3 5056 2 A 11-Aug-2015 1 1 09:00 12:30 3.5 "set up tow ropes and start towing to site 2. Arrive at site 2A. GPS: 11.00432 S, 76.06939 W, water depth 3.9m" 3.5 5056 2 A 11-Aug-2015 1 2 12:00 12:30 0.5 Geotec lunch break 4 5056 2 A 11-Aug-2015 1 3 12:30 13:30 1 6.1 9.1 1 3 1.03 34.33 "clay, peat" "coring, HPC, rod 1 1.38m up #10" 5 5056 2 A 11-Aug-2015 1 4 13:30 14:00 0.5 9.1 12.1 2 3 2.69 0.22 "clay, peat" "coring, HPC, rod 2 1.38m up #8" 5.5 5056 2 A 11-Aug-2015 1 5 14:00 14:30 0.5 12.1 15.1 3 3 2.72 90.67 clay "coring, HPC, rod 3 1.38m up #8" 6 5056 2 A 11-Aug-2015 1 6 14:30 15:00 0.5 15.1 18.1 4 3 2.89 96.33 clay "coring, HPC, rod 4 1.38m up #8" 6.5 5056 2 A 11-Aug-2015 1 7 15:00 16:00 1 18.1 18.1 0 "trip out 2x6m +BHA, set 2 sticks of casing at 13.3m, weld tabs at joint. Trip back in rods + CB" 7.5 5056 2 A 11-Aug-2015 1 8 16:00 16:20 0.33 18.1 21.1 5 3 2.9 96.67 clay "coring, HPC, rod 5 1.38m up #8" 7.83 5056 2 A 11-Aug-2015 1 9 16:20 16:55 0.58 21.1 24.1 6 3 2.47 82.33 "clay, sand" "coring, HPC, rod 6 1.38m up #10" 8.41 5056 2 A 11-Aug-2015 1 10 16:55 18:00 1.08 24.1 27.1 7 3 2.43 81 clay "coring, HPC, rod 7 1.38m up #10" 9.49 5056 2 A 11-Aug-2015 2 1 18:50 19:20 0.5 27.1 30.1 8 3 0.91 30.33 "sand, clay" "coring, HPC, rod 8 1.38m up #10" 0.5 5056 2 A 11-Aug-2015 2 2 19:20 21:45 2.42 30.1 30.1 0 "coring, HPC, rod 9 1.38m up #10, sand in hole, go to mud 3 bags/bowl ... Poly, clean hole" 2.92 5056 2 A 11-Aug-2015 2 3 21:45 23:34 1.82 30.1 30.1 0 "end hole due to excessive ... Trip rods, ... Casing, rotate barge" 4.74 5056 2 B 11-Aug-2015 2 1 23:34 00:30 0.93 7.9 10.9 1 3 2.72 90.67 "peat, marl" "coring, HPC, rod 2 2.58m up #5" 0.93 5056 2 B 11-Aug-2015 2 2 00:30 01:05 0.58 10.9 13.9 2 3 3 100 "peat, marl" "coring, HPC, rod 3 2.58m up #8" 1.51 5056 2 B 11-Aug-2015 2 3 01:05 01:33 0.47 13.9 16.9 3 3 2.87 95.67 marl "coring, HPC, rod 4 2.58m up #8" 1.98 5056 2 B 11-Aug-2015 2 4 01:33 02:10 0.62 16.9 19.9 4 3 2.56 85.33 "clay, sand" "coring, HPC, rod 5 2.58m up #8" 2.6 5056 2 B 11-Aug-2015 2 5 02:10 02:50 0.67 19.9 22.9 5 3 1.74 58 "sand, clay" "coring, HPC, rod 6 2.58m up #8" 3.27 5056 2 B 11-Aug-2015 2 6 02:50 03:20 0.5 22.9 22.9 0 lunch break Geotec 3.77 5056 2 B 11-Aug-2015 2 7 03:20 04:05 0.75 22.9 25.9 6 3 2.76 92 "clay, sand" "coring, HPC, rod 7 2.58m up #8, mud" 4.52 5056 2 B 11-Aug-2015 2 8 04:05 04:35 0.5 25.9 28.9 7 3 2.25 75 "clay, peat" "coring, HPC, rod 8 2.58m up #8" 5.02 5056 2 B 11-Aug-2015 2 9 04:35 05:15 0.67 28.9 31.9 8 3 1.29 43 "sand, gravel" "coring, HPC, rod 9 2.58m up #8" 5.69 5056 2 B 11-Aug-2015 2 10 05:15 06:00 0.75 31.9 31.9 0 "coring, HPC, rod 10 2.58m up #8, no fire, ream, pull" 6.44 5056 2 B 12-Aug-2015 1 1 06:00 06:30 0.5 34.9 34.9 0 site inspection and safety meeting 0.5 5056 2 B 12-Aug-2015 1 2 06:30 09:45 3.25 34.9 34.9 0 logging hole down to 26m 3.75 5056 2 B 12-Aug-2015 1 3 09:45 10:15 0.5 34.9 34.9 0 pull 1 stick of casing 4.25 5056 2 B 12-Aug-2015 1 4 10:15 11:00 0.75 34.9 34.9 0 logging upper part of hole 5 5056 2 C 12-Aug-2015 1 1 11:00 11:15 0.25 "pull 1 stick of casing (all casing is out), move barge over to hole 2C" 0.25 5056 2 C 12-Aug-2015 1 2 11:15 11:45 0.5 5.48 8.48 1 3 0.735 24.5 "sand, clay" "coring, HPC, rod 1 2m up #8" 0.75 5056 2 C 12-Aug-2015 1 3 11:45 12:15 0.5 8.48 11.48 2 3 1.66 55.33 "sand, clay" "coring, HPC, rod 2 2m up #8" 1.25 5056 2 C 12-Aug-2015 1 4 12:15 12:45 0.5 11.48 14.48 3 3 3.02 100.67 clay "coring, HPC, rod 3 2m up #8" 1.75 5056 2 C 12-Aug-2015 1 5 12:45 13:00 0.25 14.48 14.48 0 trip out rods and BHA 2 5056 2 C 12-Aug-2015 1 6 13:00 14:00 1 14.48 14.48 0 clay "head onto shore, pick up photographer" 3 5056 2 C 12-Aug-2015 1 7 14:00 18:00 4 14.48 14.48 0 "so we can take pics of Geotec and barge, standby until tomorrow a.m., no night shift" 7 5056 2 C 12-Aug-2015 2 1 18:00 06:00 12 14.48 14.48 0 "stand by until the morning of 8.13.2015, per Don: to tow to meet site in the mornimng which should be about 3-4 hours south of holes 2B/2C." 12 5056 2 C 13-Aug-2015 1 1 06:00 06:30 0.5 14.48 14.48 0 site inspection and safety meeting 0.5 5056 2 C 13-Aug-2015 1 2 06:30 09:30 3 14.48 14.48 0 pull spuds and tow to site 3 3.5 5056 3 A 13-Aug-2015 1 1 09:30 10:00 0.5 "drop spuds into place, set up for drilling, GPS: 11.04394 S, 76.05912 W" 0.5 5056 3 A 13-Aug-2015 1 2 10:00 10:10 0.17 7.4 10.4 1 3 1.9 63.33 clay "coring, HPC, rod 1 0.08m up #8" 0.67 5056 3 A 13-Aug-2015 1 3 10:10 10:30 0.33 10.4 13.4 2 3 2.82 94 clay "coring, HPC, rod 2 0.08m up #8" 1 5056 3 A 13-Aug-2015 1 4 10:30 11:00 0.5 13.4 16.4 3 3 3 100 clay "coring, HPC, rod 3 0.08m up #8" 1.5 5056 3 A 13-Aug-2015 1 5 11:00 11:30 0.5 16.4 19.4 4 3 2.87 95.67 "clay, sand" "coring, HPC, rod 4 0.08m up #8" 2 5056 3 A 13-Aug-2015 1 6 11:30 12:00 0.5 19.4 22.4 6 3 1.05 35 sand "coring, HPC, rod 5 0.08m up #8" 2.5 5056 3 A 13-Aug-2015 1 7 12:00 12:30 0.5 22.4 25.4 6 3 2.98 99.33 clay "coring, HPC, rod 6 0.08m up #8" 3 5056 3 A 13-Aug-2015 1 8 12:30 14:50 2.33 25.4 25.4 0 "trip rods + CB and add 3 sticks 16.9m of casing. Lunch break 12:45-01:15, trip back in." 5.33 5056 3 A 13-Aug-2015 1 9 14:50 15:05 0.25 25 28.4 7 3.4 2.46 82 clay "coring, HPC, rod 7 0.48m up #10, lost .40 from cave in" 5.58 5056 3 A 13-Aug-2015 1 10 15:05 15:35 0.5 28.4 31.4 8 3 2.97 99 clay "coring, HPC, rod 8 0.08m up #10" 6.08 5056 3 A 13-Aug-2015 1 11 15:35 16:05 0.5 31.4 34.4 9 3 2.65 88.33 "clay, sand" "coring, HPC, rod 9 0.08m up #10" 6.58 5056 3 A 13-Aug-2015 1 12 16:05 17:00 0.92 34.2 37.2 10 3 1.19 39.67 sand "coring, HPC, rod 10 0.28m up #10, lost 0.20 from cave in" 7.5 5056 3 A 13-Aug-2015 1 13 17:00 17:30 0.5 37.2 37.2 0 pull out 4x6m rods up into casing 8 5056 3 A 13-Aug-2015 1 14 17:30 18:00 0.5 37.2 37.2 0 travel back to shore 8.5 5056 3 A 13-Aug-2015 2 1 18:00 18:15 0.25 37.2 37.2 0 wait for crew boat 0.25 5056 3 A 13-Aug-2015 2 2 18:15 19:00 0.75 37.2 37.2 0 travel to barge 1 5056 3 A 13-Aug-2015 2 3 19:00 19:30 0.5 37.2 37.2 0 site inspection and safety meeting 1.5 5056 3 A 13-Aug-2015 2 4 19:30 20:00 0.5 37.2 37.2 0 trip PQ+CB+1(5.8m) of casing 2 5056 3 B 13-Aug-2015 2 1 20:00 20:30 0.5 "move barge, set casing" 0.5 5056 3 B 13-Aug-2015 2 2 20:30 21:00 0.5 trip CB and PQ 1 5056 3 B 13-Aug-2015 2 3 21:00 21:30 0.5 8.48 11.48 1 3 2.57 85.67 marl "coring, HPC, rod 2 2m up #8" 1.5 5056 3 B 13-Aug-2015 2 4 21:30 22:00 0.5 11.48 14.48 2 3 2.88 96 "peat, glacial" "coring, HPC, rod 3 2m up #8" 2 5056 3 B 13-Aug-2015 2 5 22:00 22:30 0.5 14.48 17.48 3 3 3.02 100.67 glacial "coring, HPC, rod 3 2m up #8" 2.5 5056 3 B 13-Aug-2015 2 6 22:30 23:00 0.5 17.48 20.48 4 3 1.85 61.67 "sand, glacial" "coring, HPC, rod 5 2m up #8" 3 5056 3 B 13-Aug-2015 2 7 23:00 23:30 0.5 20.48 23.48 5 3 2.58 86 "sand, glacial" "coring, HPC, rod 6 2m up #8, inverted change" 3.5 5056 3 B 13-Aug-2015 2 8 23:30 00:00 0.5 23.48 23.48 0 trip out to run in another 5.8m casing 4 5056 3 B 13-Aug-2015 2 9 00:00 00:30 0.5 23.48 23.48 0 trip in CB+PQ+ream 1m with ash mole 4.5 5056 3 B 13-Aug-2015 2 10 00:30 01:00 0.5 23.48 26.48 6 3 2.96 98.67 "glacial, clay" "coring, HPC, rod 7 2m up #10" 5 5056 3 B 13-Aug-2015 2 11 01:00 01:30 0.5 26.48 29.48 7 3 2.99 99.67 "glacial, marl, carbonate" "coring, HPC, rod 8 2m up #10" 5.5 5056 3 B 13-Aug-2015 2 12 01:30 02:00 0.5 29.48 32.48 8 3 2.13 71 "glacial, carbonate" "coring, HPC, rod 9 2m up #10" 6 5056 3 B 13-Aug-2015 2 13 02:00 02:30 0.5 32.48 35.48 9 3 0.96 32 "glacial, sand, carbonate" "coring, HPC, rod 10 2m up #10, hit a sand zone, wash/ream" 6.5 5056 3 B 13-Aug-2015 2 14 02:30 03:00 0.5 35.48 38.48 10 3 1.495 49.83 "glacial, sand, carbonate" "coring, HPC, rod 11 2m up #10, mud up for sand (W+R)" 7 5056 3 B 13-Aug-2015 2 15 03:00 04:30 1.5 38.48 41.48 11 3 2.08 69.33 "glacial, sand, carbonate" "coring, HPC, rod 12 2m up #10, Geotec break 30min" 8.5 5056 3 B 13-Aug-2015 2 16 04:30 05:00 0.5 41.48 44.4 12 2.92 2.87 98.29 carbonate "coring, HPC, rod 13 2m up #10, ream down 6m to try and get out of sand when rotation pressure reads sand/gravel or poor recovery" 9 5056 3 B 13-Aug-2015 2 17 05:00 05:30 0.5 44.4 47.48 13 3.08 1.84 59.74 "coring, HPC, rod 14 2m up #10" 9.5 5056 3 B 13-Aug-2015 2 18 05:30 06:00 0.5 47.48 47.48 0 trip PQ into casing for day shift 10 5056 3 B 14-Aug-2015 1 1 06:00 07:45 1.75 47.48 47.48 0 standby for science team 1.75 5056 3 B 14-Aug-2015 1 2 07:45 08:30 0.75 47.48 47.48 0 travel to barge 2.5 5056 3 B 14-Aug-2015 1 3 08:30 09:00 0.5 47.48 47.48 0 safety meeting and site inspection 3 5056 3 B 14-Aug-2015 1 4 09:00 09:40 0.67 47.48 47.48 0 trip in rods to bottom 3.67 5056 3 B 14-Aug-2015 1 5 09:40 10:35 0.92 46.88 50.48 14 3.6 2.92 81.11 clay "coring, HPC, rod 15 2m up #10, lost 0.60 from cave in" 4.59 5056 3 B 14-Aug-2015 1 6 10:35 11:10 0.58 50.48 53.48 15 3 2.71 90.33 clay "coring, HPC, rod 16 2m up #10" 5.17 5056 3 B 14-Aug-2015 1 7 11:10 11:50 0.67 53.48 55.03 16 1.55 1.55 99.99 "clay, peat" "coring, HPC, rod 17 2m up #10" 5.84 5056 3 B 14-Aug-2015 1 8 11:50 12:30 0.67 55.03 56.48 17 1.45 0 0 "clay, peat" "coring, HPC, rod 17 2m up #10" 6.51 5056 3 B 14-Aug-2015 1 9 12:30 13:35 1.08 56.48 57.35 18 0.87 0.87 99.99 clay "coring, HPC, rod 18 2m up #10, lunch 12:45-13:15" 7.59 5056 3 B 14-Aug-2015 1 10 13:35 14:10 0.58 57.35 58.2 19 0.85 0.85 99.99 "sand, gravel" "coring, HPC, rod 18 1.13m up #10" 8.17 5056 3 B 14-Aug-2015 1 11 14:10 15:00 0.83 57.8 58.52 20 0.77 0.32 41.56 sand "coring, HPC, rod 18 0.28m up #10, lost 0.40 from cave in" 9 5056 3 B 14-Aug-2015 1 12 15:00 15:45 0.75 58.52 58.52 0 "pump and clean hole for logging, total depth 58.52, 1st log is gamma through rods, set up sheeve and winch for loggers." 9.75 5056 3 B 14-Aug-2015 1 13 15:45 17:00 1.25 58.52 58.52 0 logging hole inside rods (gamma) 11 5056 3 B 14-Aug-2015 1 14 17:00 18:00 1 58.52 58.52 0 travel to shore to cross shift 12 5056 3 B 14-Aug-2015 2 1 18:00 18:45 0.75 58.52 58.52 0 travel to barge 0.75 5056 3 B 14-Aug-2015 2 2 18:45 19:35 0.83 58.52 58.52 0 preshit inspections and safety meeting 1.58 5056 3 B 14-Aug-2015 2 3 19:35 20:00 0.42 58.52 58.52 0 trip back to 35m for logging (24m) 2 5056 3 B 14-Aug-2015 2 4 20:00 20:20 0.33 58.52 58.52 0 set up sheave for loggers to begin logging 2.33 5056 3 B 14-Aug-2015 2 5 20:20 21:15 0.92 58.52 58.52 0 "begin logging, winch unround, fix ... On logging winch" 3.25 5056 3 B 14-Aug-2015 2 6 21:15 22:45 1.5 58.52 58.52 0 "continue logging, finish all logging" 4.75 5056 3 B 14-Aug-2015 2 7 22:45 23:15 0.5 58.52 58.52 0 trip remaining pipe out of hole to log the top of the hole 5.25 5056 3 B 14-Aug-2015 2 8 23:15 23:35 0.33 58.52 58.52 0 set up sheave for loggers 5.58 5056 3 B 14-Aug-2015 2 9 23:35 01:15 1.67 58.52 58.52 0 "begin logging, finish logging" 7.25 5056 3 C 14-Aug-2015 2 1 01:15 03:15 2 "take logging sheave, lift casing, move barge, set casing, NCA to 35m SD, NCA clogged with sand and gravel from from the 10th" 2 5056 3 C 14-Aug-2015 2 2 03:15 04:45 1.5 unclog and continue with NCA to 35m SD 3.5 5056 3 C 14-Aug-2015 2 3 04:45 05:00 0.25 40.48 43.48 1 3 2.95 98.33 "glacial, clay" "coring, HPC, rod 12 0.00m up #10" 3.75 5056 3 C 14-Aug-2015 2 4 05:00 05:15 0.25 43.48 46.48 2 3 0 0 "coring, HPC, rod 13 0.00m up #10, in cave, reream" 4 5056 3 C 14-Aug-2015 2 5 05:15 05:30 0.25 46.48 46.48 0 "coring, HPC, rod 14, 0.00m up #10" 4.25 5056 3 C 14-Aug-2015 2 6 05:30 06:00 0.5 46.48 46.48 0 "trip PQ back into casing, day shift to shoot runs 2 and 3 when the arrive" 4.75 5056 3 C 15-Aug-2015 1 1 06:00 08:00 2 46.48 46.48 0 stand by on shore for day shift 2 5056 3 C 15-Aug-2015 1 2 08:00 08:30 0.5 46.48 46.48 0 travel to barge 2.5 5056 3 C 15-Aug-2015 1 3 08:30 09:00 0.5 46.48 46.48 0 site inspection and safety meeting 3 5056 3 C 15-Aug-2015 1 4 09:00 09:15 0.25 43.48 46.48 2 3 2.64 88 clay "coring, HPC, rod 13, 0.00m up #10, ream down 13 rods" 3.25 5056 3 C 15-Aug-2015 1 5 09:15 09:50 0.58 46.48 48.9 3 2.42 2.04 84.3 sand "coring, HPC, rod 14, 0.00m up #10" 3.83 5056 3 C 15-Aug-2015 1 6 09:50 10:30 0.67 48.9 51.9 4 3 2.72 90.67 clay "coring, HPC, rod 15, 0.58m up #10" 4.5 5056 3 C 15-Aug-2015 1 7 10:30 11:10 0.67 51.9 54.2 5 2.3 2.3 99.99 "coring, HPC, rod 16, 0.58m up #10" 5.17 5056 3 C 15-Aug-2015 1 8 11:10 11:55 0.75 54.2 57.05 6 2.85 1.24 43.51 "coring, HPC, rod 17, 1.28m up #10" 5.92 5056 3 C 15-Aug-2015 1 9 11:55 12:40 0.75 56 58.1 7 2.1 2.01 95.71 "coring, HPC, rod 18, 2.48m up #10, lost 1.05 to cave in" 6.67 5056 3 C 15-Aug-2015 1 10 12:40 13:45 1.08 58.1 58.1 0 "Hole TD per Mark, trip out 9x6m rods and CB, trip out 2 sticks casing" 7.75 5056 3 C 15-Aug-2015 1 11 13:45 16:15 2.5 58.1 58.1 0 "hook up tow roopes and tow to shore, tow into storm, had to drop spuds 1 km from shore" 10.25 5056 3 C 15-Aug-2015 1 12 16:15 16:45 0.5 58.1 58.1 0 pack up and travel to shore 10.75 5056 3 C 15-Aug-2015 1 13 16:45 18:00 1.25 58.1 58.1 0 weather delay 12 5056 3 C 15-Aug-2015 2 1 18:00 06:00 12 58.1 58.1 0 "stand by until morning, day shift to tow barge into launch site" 12 5056 3 C 16-Aug-2015 1 1 09:00 10:30 1.5 drive to site 1.5 5056 3 C 16-Aug-2015 1 2 10:30 10:45 0.25 boat ride to barge 1.75 5056 3 C 16-Aug-2015 1 3 10:45 15:30 4.75 "tow barge, while towing grind off welds, take tools and BHA apart and prep for shipping. Cleanup trash and organice barge for easy offload." 6.5 5056 3 C 16-Aug-2015 1 4 15:30 18:00 2.5 "end of project, BBQ, celebration" 9 5056 3 C 16-Aug-2015 1 5 18:00 19:45 1.75 drive back to hotel 10.75 5056 3 C 17-Aug-2015 1 1 08:00 10:00 2 travel to launch site 2 5056 3 C 17-Aug-2015 1 2 10:00 16:30 6.5 "offload all tools from barge, organize containers to restock all equipment, tools from barge into containers, Geotec began their inventory, Geotec cleans equipment and barge, science team continued to prep all their equipment, travel back to hotel" 8.5