ProgramLogo.jpg Hominid Sites and Paleolakes Drilling Project
Additional Pictures
Date: 6/13/2013

ProjectLogo.jpg



THUMBNAILNAMEREMARKS
UN_5053_1_A_Tugen-Hills_11.jpgA festive evening capped off the end of the Tugen Hills drilling, which included some traditional dancers.
UN_5053_1_A_Tugen-Hills_12.jpgA festive evening capped off the end of the Tugen Hills drilling, which included some traditional dancers.
UN_5053_1_A_Tugen-Hills_18.jpgICDP downhole logging unit at Tugen-Hills
UN_5053_1_A_Tugen-Hills_19.jpgICDP downhole logging equipment at Tugen-Hills: winch, and slimhole sonds for DIP, CAL, SUSC, SGR, DLL
UN_5053_1_A_Tugen-Hills_20.jpgICDP downhole logging at Tugen-Hills: slimhole sond for SGR before logging run
UN_5053_1_A_Tugen-Hills_21.jpgICDP downhole logging at Tugen-Hills: slimhole sond for SGR before logging run
UN_5053_1_A_Tugen-Hills_23.jpgICDP downhole logging at Tugen-Hills: slimhole sond for SGR while logging run
UN_5053_1_A_Tugen-Hills_25.jpgICDP downhole logging unit at Tugen-Hills: drill site flooded with drill mud
UN_5053_1_A_Tugen-Hills_26.jpgICDP downhole logging at Tugen-Hills: slimhole sond for DIP