ICDPLogo.gif Gas Hydrate Research Well Program
Additional Pictures
Date: 2002.02.05

ActProLogo.gif



THUMBNAIL NAME REMARKS DEPTH (m)
UN_drillsite_18.jpg Schlumberger well logging ongoing at Mallik 5L-38 n.a. - n.a.
UN_drillsite_19.jpg Mark Nixon protecting DTS Cable at -40C during 4L probing. Mark assisting in Schlumberger 4L-38 sounding/clearing attempt. The Sheave is being hung from a picker truck. n.a. - n.a.
UN_folks_19.jpg The data management and in formation group: Richard Laframboise (GSC) and Ralf Löwner (GFZ). n.a. - n.a.
UN_irc_3.jpg Weather: variable in period -34°C to -40°C n.a. - n.a.