Gas Hydrate Research Well Program
Additional Pictures
Date: 2002.02.23
THUMBNAIL
NAME
REMARKS
DEPTH (m)
UN_drillsite_50.jpg
Walk a way VSP (Vertical Seismic Profile) in progress in Mallik 3L with the infamous 75 foot picker truck assisting.
n.a. - n.a.
UN_drillsite_51.jpg
VIPs arrive at the Mallik site.
n.a. - n.a.