####################### Meta Data Part ############################# Column Name Data Type Description Label Validation Text Unit ####################### Data Part ############################# EXPEDITION SITE HOLE LATITUDE_DEG LATITUDE_MIN LATITUDE_DIR LONGITUDE_DEG LONGITUDE_MIN LONGITUDE_DIR LONGITUDE_DEC LATITUDE_DEC START_DATE END_DATE WATER_DEPTH WD_METHOD GEAR ELEVATION REMARKS PLANNED_LENGTH DIRECTION INCLINATION CORE_DEPTH_CSF CORE_DEPTH_CCSF IGSN NAME 5057 1 A 22 53.535 N 58 30.904 E 58.515 22.892 22-Jan-2017 00:00 08-Feb-2017 00:00 2.800 undefined Wireline diamond coring 693 done: coring, Wadi Gideah (lower crustal section); achieved drill depth: 410 meters 400 0 0 403.050 0 ICDP5057EH62001 GT1A 5057 2 A 22 51.793 N 58 31.198 E 58.520 22.863 25-Dec-2016 00:00 20-Jan-2017 00:00 16.330 undefined Wireline diamond coring 620 done: coring, Wadi Gideah, Northern Sharqiyah (mid-crustal section); achieved drill depth: 412 meters 400 54 30 406.550 0 ICDP5057EH85001 GT2A 5057 3 A 23 6.845 N 58 12.703 E 58.212 23.114 11-Feb-2017 00:00 04-Mar-2017 00:00 0 undefined Wireline diamond coring 789 done: coring, Wadi Abdah (sheeted dyke-gabbro transition); achieved drill depth: 403 metres 400 0 0 400 0 ICDP5057EH95001 GT3A 5057 4 A 23 21.854 N 58 10.954 E 58.183 23.364 06-Mar-2017 00:00 06-Mar-2017 00:00 0 undefined coring 296 done: coring, Wadi Mansah (basal thrust); drilled depth: 1.90 meters. No material retained. Hole abandoned. Rig moved closer to hardrock outcrop 400 0 0 0 0 ICDP5057EH75001 BT1A 5057 4 B 23 21.861 N 58 20.149 E 58.183 23.364 06-Mar-2017 00:00 23-Mar-2017 00:00 12.470 undefined Wireline diamond coring 292 done: coring, Wadi Mansah (basal thrust); achieved drill depth: 301 meters 300 30 15 300.050 0 ICDP5057EHB5001 BT1B 5057 5 A 22 52.873 N 58 42.036 E 58.701 22.881 20-Feb-2017 00:00 02-Mar-2017 00:00 13.470 undefined Rotary 583 done: rotary, Batin, Wadi Lawayni (active serpentinisation); achieved drill depth: 400 meters 400 0 0 400 0 ICDP5057EHC5001 BA1A 5057 5 B 22 52.874 N 58 42.004 E 58.701 22.881 24-Jan-2018 00:00 12-Feb-2018 00:00 13.350 undefined Wireline diamond coring 583 done: coring, Batin, Wadi Lawayni (active serpentinisation); achieved drill depth: 413 meters 400 0 0 401.700 0 ICDP5057EHJ5001 BA1B 5057 5 C 22 52.895 N 58 42.087 E 58.701 22.882 03-Feb-2018 00:00 21-Feb-2018 00:00 0 undefined Rotary/Hammer/Rotary 582 done: rotary, Batin, Wadi Lawayni (active serpentinisation); achieved drill depth: 400 meters 400 0 0 400 0 ICDP5057EHF5001 BA1C 5057 5 D 22 52.874 N 58 42.035 E 58.701 22.881 24-Feb-2018 00:00 15-Mar-2018 00:00 17.030 undefined Rotary/Hammer/Rotary 584 done: rotary, Batin, Wadi Lawayni (active serpentinisation); achieved drill depth: 52 meters 400 0 0 400 0 ICDP5057EHG5001 BA1D 5057 6 A 22 55.468 N 58 39.977 E 58.666 22.924 05-Mar-2017 00:00 09-Mar-2017 00:00 0 undefined Rotary 545 done: rotary, Batin, Wadi Lawayni (active serpentinisation); achieved drill depth: 400 meters 400 0 0 400 0 ICDP5057EH05001 BA2A 5057 7 A 22 54.435 N 58 20.149 E 58.336 22.907 15-Nov-2017 00:00 13-Dec-2017 00:00 2.560 undefined Wireline diamond coring 696 done: coring, Wadi Zeeb (crustal-mantle transition); achieved drill depth: 404 meters 400 0 30 404.150 0 ICDP5057EHD5001 CM1A 5057 7 B 22 54.433 N 58 20.149 E 58.336 22.907 19-Dec-2017 00:00 27-Jan-2018 00:00 10.740 undefined Rotary/Hammer/Rotary 696 done: rotary, Wadi Zeeb (crustal-mantle transition); achieved drill depth: 237 meters 300 0 0 237 0 ICDP5057EHE5001 CM1B 5057 8 A 22 54.658 N 58 20.144 E 58.336 22.907 23-Nov-2017 00:00 13-Dec-2017 00:00 12.490 undefined Rotary/Hammer/Rotary 714 done: rotary, Wadi Zeeb (crustal-mantle transition); achieved drill depth: 400 meters 400 0 0 400 0 ICDP5057EHA5001 CM2A 5057 8 B 22 54.660 N 58 20.149 E 58.336 22.911 19-Dec-2017 00:00 04-Jan-2018 00:00 9.510 undefined Wireline diamond coring 713 done: coring, Wadi Zeeb (crustal-mantle transition); achieved drill depth: 300 meters 300 0 0 300 0 ICDP5057EHK5001 CM2B 5057 9 A 22 51.970 N 58 42.634 E 58.711 22.866 08-Jan-2018 00:00 22-Jan-2018 00:00 6.170 undefined Wireline diamond coring 554 done: coring, Batin, Wadi Lawayni (Active Serpentinisation); achieved drill depth: 304 meters 300 0 0 302.700 0 ICDP5057EHI5001 BA3A 5057 9 B 22 52.200 N 58 42.600 E 58.710 22.870 08-Jan-2018 00:00 22-Jan-2018 00:00 0 undefined coring 524 NSHQ14, Batin, Wadi Lawayni (Active Serpentinisation) 300 0 0 300 0 ICDP5057EHI5001 BA3B 5057 10 A 22 53.101 N 58 41.703 E 58.695 22.885 14-Feb-2018 00:00 27-Feb-2018 00:00 13.850 undefined Wireline diamond coring 596 done: coring; Batin, Wadi Lawayni (Active Serpentinisation); achieved drill depth: 314 meters 300 0 0 302.700 0 ICDP5057EHL5001 BA4A